09 00 00 FINISHES CONTINUED01 00 00 GENERAL REQUIREMENTS CONTINUED01 00 00 GENERAL REQUIREMENTS CONTINUED01 00 00 GENERAL REQUIREMENTS08 00 00 OPENINGS CONTINUED3 THE GENERAL CONTRACTOR UPON ACCEPTANCE AND AWARD OF THE CONTRACT ASSUMES FULL RESPONSIBILITY FOR THE CONSTRUCTION, MATERIALS, AND WORKMANSHIP OF THE WORK DESCRIBED IN THESE NOTES AND DRAWINGS, AND WILL BE EXPECTED TO COMPLY WITH THE DESIGN INTENT AS WELL AS ALL OF THE PRINTED AND WRITTEN CONSTRUCTION DOCUMENTS.01 41 00 - REGULATORY REQUIREMENTS1 THE GENERAL CONTRACTOR, SUBCONTRACTOR AND ANY TENANTS' CONTRACTORS SHALL SUBMIT CERTIFICATES TO THE BUILDING MANAGER AND OWNER UPON COMPLETION OF WORK, INCLUDING BUT NOT LIMITED TO THE FOLLOWING:A) FIREPROOF WOOD TEST REPORT (IF REQUIRED)B) ELECTRICAL, PLUMBING AND AIR CONDITIONING CERTIFICATES ISSUED BY:1) DEPARTMENT OF WATER SUPPLY, GAS AND ELECTRICITY2) BOARD OF FIRE UNDERWRITERS2 PROVIDE CERTIFICATION OF THAT ALL ELECTRICAL, MECHANICAL, AND PLUMBING FIXTURES MEET THE REQUIREMENTS OF TITLE 24 AND CALGREEN.3 ALL WORK PERFORMED BY THE CONTRACTOR SHALL CONFORM TO THE REQUIREMENTS OF MUNICIPAL, LOCAL OR FEDERAL AND STATE LAWS, AS WELL AS ANY OTHER GOVERNING REQUIREMENTS, WHETHER OR NOT SPECIFIED ON THE DRAWINGS.4 WHERE THE CONTRACT NOTES OR DRAWINGS CALL FOR ANY WORK OF A MORE STRINGENT NATURE THAN THAT REQUIRED BY THE BUILDING CODE OR ANY OTHER DEPARTMENT HAVING JURISDICTION OVER THE WORK, THE WORK OF THE MORE STRINGENT NATURE CALLED FOR BY THE CONTRACT, CONSTRUCTION NOTES OR DRAWINGS SHALL BE FURNISHED AND PROVIDED IN ALL CASES.5 THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LEGALLY REQUIRED APPROVALS AND PERMITS NECESSARY FOR THE EXECUTION AND COMPLETION OF HIS WORK. FORWARD COPIES TO OWNER AND SAA.01 51 00 - TEMPORARY UTILITIES1 THE GENERAL CONTRACTOR SHALL FURNISH A SYSTEM OF TEMPORARY POWER, LIGHTS, WATER, HEAT, AND ANY OTHER TEMPORARY UTILITIES REQUIRED THROUGHOUT THE SPACE UNDER CONSTRUCTION AS REQUIRED TO COMPLETE THE WORK.01 56 00 - TEMPORARY ENCLOSURES1 THE GENERAL CONTRACTOR SHALL EXERCISE STRICT DUST CONTAINMENT CONTROL OVER THE JOB TO PREVENT DIRT OR DUST FROM LEAVING THE JOB SITE.01 57 00 - TEMPORARY CONTROLS1 "CONSTRUCTION DUST CONTROL": DURING CONSTRUCTION, DUST CONTROL MEASURES SHALL BE REQUIRED. GRADING WILL BE DISCONTINUED DURING FIRST-STAGE SMOG ALERTS AND SUSPENDED DURING PERIODS OF HIGH WINDS (I.E.: OVER 15 MPH). ALL HAULING TRUCKS SHALL HAVE LOADS COVERED OR WETTED AND LOADED BELOW THE SIDEBOARDS TO MINIMIZE DUST. EXERCISE MEASURES TO REMOVE DIRT FROM WHEELED VEHICLES BEFORE ENTERING THE PUBLIC WAY.01 70 00 - EXECUTION AND CLOSEOUT REQUIREMENTS1 THE CONTRACTOR SHALL BE FULLY AND SOLELY RESPONSIBLE FOR THE REMOVAL, REPLACEMENT AND RECTIFICATION OF ALL DAMAGED AND DEFECTIVE MATERIAL AND WORKMANSHIP IN CONNECTION WITH THE CONTRACT WORK. HE SHALL REPLACE OR REPAIR AS DIRECTED ALL SUCH DAMAGED OR DEFECTIVE MATERIALS WHICH SHALL APPEAR WITHIN A PERIOD OF ONE YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION.2 CONTRACT CLOSE-OUT SHALL OCCUR ONLY AFTER THE ARCHITECT HAS PREPARED A PUNCHLIST AND THE PUNCHLIST ITEMS HAVE BEEN CORRECTED. THE GENERAL CONTRACTOR SHALL SUBMIT TO THE OWNER MAINTENANCE AND WARRANTY MANUALS, RELEASE OF LIENS AND RECORD DRAWINGS WITH HIS FINAL APPLICATION FOR PAYMENT.01 71 33 - PROTECTION OF ADJACENT CONSTRUCTION1 THE GENERAL CONTRACTOR SHALL PROVIDE A VISQUEEN SEAL FROM FLOOR TO CEILING AT ALL INTERFACES TO PROTECT ADJACENT BUILDING PROPERTY WHILE DEMOLITION AND CONSTRUCTION ARE IN PROGRESS. THIS SEAL IS TO BE KEPT CLOSED AT ALL TIMES.2 THE GENERAL CONTRACTOR SHALL AT ALL TIMES PROTECT THE PROPERTY OF THE BUILDING OWNER INCLUDING BUT NOT LIMITED TO, WINDOWS, FLOOR AND CEILING TILE, PUBLIC TOILETS, ELEVATORS, DOORS, FRAMES, ELECTRICAL AND AIR CONDITIONING EQUIPMENT, CONVECTOR ENCLOSURES, ETC.3 THE CONTRACTOR SHALL AT NO TIME DO ANY WORK OR PLACE ANY CONSTRUCTION THAT MAY AFFECT THE OPERATIONS OF OTHER TENANTS, INCLUDING ANY INTERRUPTIONS IN THE SUPPLY OF POWER OR OTHER UTILITIES, WITHOUT FIRST NOTIFYING THE BUILDING OWNER AND OBTAINING PERMISSION FROM THEM TO PROCEED.01 73 29 - CUTTING AND PATCHING1 THE GENERAL CONTRACTOR SHALL DO ALL CUTTING, FITTING, AND PATCHING WORK THAT MAY BE REQUIRED TO MAKE ALL PARTS COME TOGETHER PROPERLY AND FIT TO RECEIVE OR BE RECEIVED BY WORK OF OTHER TRADES SHOWN UPON OR REASONABLY IMPLIED BY THE DRAWINGS AND NOTES.2 THE GENERAL CONTRACTOR SHALL PROVIDE ALL FLOOR CUTOUTS AND PATCHING REQUIRED FOR THE INSTALLATION OF ALL WORK.3 THE GENERAL CONTRACTOR SHALL METAL LATH OVER ALL NEW CONDUIT CHASES IN MASONRY PARTITIONS.4 ALL DAMAGED EXISTING AREAS TO REMAIN AND EXISTING AREAS AFFECTED BY DEMOLITION OR NEW CONSTRUCTION WORK SHOWN ON DRAWINGS SHALL BE PATCHED TO MATCH IMMEDIATE EXISTING ADJACENT AREAS IN MATERIALS, FIRE RATING, FINISH AND COLOR UNLESS OTHERWISE NOTED.5 ALL FIRE PROOFING REMOVED FROM COLUMNS AND BEAMS DURING THE COURSE OF CONSTRUCTION SHALL BE REPLACED WITH THE SAME MATERIAL AND RATING AS THAT WHICH WAS REMOVED.6 CONTRACTOR TO VERIFY WITH OWNER IF X-RAY IS REQUIRED PRIOR TO CORE DRILLING. X-RAY FLOOR PRIOR TO THE COMMENCEMENT OF ANY FLOOR CORING. AVOID CORING THROUGH ANY EXISTING STEEL REINFORCEMENT.01 74 00 - CLEANING AND WASTE MANAGEMENT1 THE GENERAL CONTRACTOR SHALL REMOVE ALL RUBBISH AND WASTE MATERIALS, BOTH FROM HIS OWN FORCES AND OTHER SUBCONTRACTORS, INCLUDING RUBBISH WHICH IS A BY-PRODUCT OF CARPET AND CABINET INSTALLATION, TELEPHONE COMPANY INSTALLATION, ETC. AND PROVIDE FOR ITS REMOVAL FROM THE SITE.2 AT THE END OF EACH DAY OF CONSTRUCTION OR FINISH WORK, THE CONTRACTOR AND EACH TRADE SHALL BE RESPONSIBLE FOR REMOVING ANY DEBRIS FROM THE SITE. THE JOB SITE SHALL BE CLEANED TO THE SATISFACTION OF THE OWNER, AND SAA UPON COMPLETION OF THE PROJECT BY THE CONTRACTOR.3 THE EXISTING TO REMAIN, EXISTING RELOCATED OR NEW ITEMS INSTALLED BY THE GENERAL CONTRACTOR IN ADDITION TO BEING AMPLY PROTECTED THROUGHOUT THE PERIOD OF CONSTRUCTION SHALL BE THOROUGHLY CLEANED TO THE SATISFACTION OF SHLEMMER ALGAZE ASSOCIATES PRIOR TO BEING TURNED OVER TO THE OWNER. 4 THE EXISTING BUILDING TOILET FACILITIES, IF UTILIZED DURING CONSTRUCTION BY CONTRACTOR PERSONNEL, SHALL BE AMPLY PROTECTED THROUGHOUT THE PERIOD OF CONSTRUCTION AND ALL DAMAGED OR MALFUNCTIONING ITEMS SHALL BE REPAIRED, REPLACED AND THOROUGHLY CLEANED TO THE SATISFACTION OF SHLEMMER ALGAZE ASSOCIATES PRIOR TO BEING TURNED OVER TO THE OWNER. 5 ITEMS THAT ARE TO BE REMOVED AND LATER REINCORPORATED INTO THE PROJECT ARE TO BE CLEANED, STORED, AND REPAIRED IF NECESSARY. SEE SHEETS A1.0 AND A2.0 FOR REUSE OF EXISTING MATERIALS.02 41 00 DEMOLITION02 41 19.16 - SELECTIVE INTERIOR DEMOLITION1 THE GENERAL CONTRACTOR SHALL FURNISH ALL LABOR AND MATERIAL REQUIRED TO COMPLETE DEMOLITION AND REMOVAL OF ALL ITEMS AS INDICATED IN SAA DRAWINGS OR AS OTHERWISE DIRECTED BY SAA.2 THE GENERAL CONTRACTOR SHALL FURNISH BUILDING MANAGEMENT AND SAA WITH A COMPLETE INVENTORY LIST OF ALL ITEMS THAT CAN BE REUSED AND/OR STORED IN BUILDING STOCK.3 THE GENERAL CONTRACTOR SHALL EXECUTE ALL WORK IN COMPLIANCE WITH THE REGULATIONS OF THE AUTHORITY HAVING JURISDICTION OVER THE BUILDING FOR DEMOLITION AND REMOVAL OF DEBRIS, NOISE ORDINANCE, INCLUDING ACCEPTABLE HOURS FOR OVERTIME WORK REQUIRED.4 ALL WORK DEMOLISHED SHALL BE REMOVED FROM THE PREMISES EXCEPT ITEMS TO BE REUSED OR RETURNED TO OWNER OR AS OTHERWISE NOTED.5 THE GENERAL CONTRACTOR SHALL REMOVE FROM PREMISES CONDUITS LEFT AFTER WALL DEMOLITION, INCLUDING SWITCH BOXES, PLATES, BRIDGES OR ANY OTHER TELEPHONE OR ELECTRICAL, INCLUDING WIRING AND EQUIPMENT.6 IN ALL AREAS WHERE DEMOLITION (REMOVAL OF TILE, CARPETING, PARTITIONS, ETC.) CAUSES ANY UNEVENNESS IN CONCRETE SLAB, THE CONTRACTOR SHALL PATCH TO LEVEL THE SLAB TO RECEIVE NEW FINISHED FLOORING.3 THE CONTRACTOR SHALL CONTACT THE BUILDING MANAGEMENT TO DETERMINE THE REQUIREMENTS OF THE BUILDING OWNER TO DETERMINE WHEN AND HOW DELIVERIES CAN BE MADE (SEE BELOW), WHAT PHASES OF CONSTRUCTION CAN BE DONE ON REGULAR OR OVERTIME, AND IN GENERAL ANY SPECIAL BUILDING REQUIREMENTS WHICH WILL AFFECT THEIR WORK (IF OVERTIME WORK IS REQUIRED BY ANY TRADE, APPROVAL MUST BE OBTAINED PRIOR TO THE EXECUTION OF ANY WORK INCLUDING COST). THE GENERAL INTENT IS THAT ALL CONSTRUCTION WORK SHALL BE DONE ON REGULAR TIME EXCEPT FOR NOISE GENERATING CONSTRUCTION.4 CONTRACTOR SHALL MAKE ALL REQUIRED ARRANGEMENTS FOR DELIVERY OF EQUIPMENT AND/OR MATERIALS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK THE RULES AND REGULATIONS GOVERNING WORK ON THE PREMISES, INCLUDING THE FOLLOWING:A) DATE AND TIME OR DELIVERY SHALL BE ESTABLISHED IN CONJUNCTION WITH THE PERSON HAVING JURISDICTION OVER PREMISES. OVERTIME CHARGES AND/OR ANY NECESSARY EXPENSE SHALL BE PAID BY CONTRACTOR.B) BUILDING CONDITIONS, INCLUDING SIZE AND LOADING CAPACITY OF ELEVATORS, SIZE OF DOORWAYS, CORRIDORS, WINDOW OPENINGS, ETC., SHALL BE CHECKED BY THE CONTRACTOR BEFORE DELIVERY TO ASSURE ITEMS WILL FIT INTO SPACE.C) ALL CHARGES INVOLVING THE INSTALLATION AND/OR OPERATION OF A HOIST SYSTEM, IF REQUIRED, SHALL BE BORNE BY THE CONTRACTOR. CHARGES INVOLVING THE TEMPORARY REMOVAL AND REINSTALLATION OF WINDOW SASH AND/OR FIXED PANELS REQUIRED FOR DELIVERY SHALL BE BORNE BY THE CONTRACTOR.5 THE GENERAL CONTRACTOR, HIS SUBCONTRACTOR AND ANY OTHER CONTRACTOR INVOLVED IN THIS PROJECT SHALL TAKE NOTE THAT ANY COST CAUSED BY DEFECTIVE OR ILL-TIMED WORK AS A RESULT OF, BUT NOT LIMITED TO INFERIOR WORKMANSHIP OR MATERIALS, IMPROPER SCHEDULING OR DELINQUENT ORDERING SHALL BE BORNE BY THE PARTY RESPONSIBLE THEREFORE.6 WHERE SPECIAL ITEMS REQUIRE EXTENDED LEAD TIME PREVENTING INSTALLATION BY PROJECTED MOVE IN DATE, CONTRACTOR IS TO PROPOSE AN AVAILABLE ALTERNATE FOR APPROVAL BY SAA AND OWNER AS WELL AS TO PREPARE PRICING FOR POSSIBLE TEMPORARY ASSEMBLIES.01 33 00 - SUBMITTAL PROCEDURES 1 THE GENERAL CONTRACTOR SHALL PROVIDE SUBMITTALS FOR REVIEW AND APPROVAL BY SAA. CONTRACTOR SHALL SUBMIT THREE (3) SAMPLES OF THE SPECIFIED MATERIALS. SUBMITTALS SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING: 9” X 12” BRUSH-OUT SAMPLES OF ALL PAINT COLORS SPECIFIED, SAMPLES OF ALL CARPETS, ALL SPECIFIED FLOOR AND BASE MATERIALS, SAMPLES OF ALL WALL FINISHES, SAMPLES OF SPECIFIED CABINET FINISHES, SAMPLES OF CEILING GRID AND CEILING TILE, CUTSHEETS OF LIGHTING FIXTURES, DOOR/FRAME AND BUILDERS HARDWARE, CASEWORK SHOP DRAWINGS, CASEWORK HARDWARE SUBMITTALS, AND ANY OTHER MATERIALS SPECIFIED.2 THE GENERAL CONTRACTOR SHALL SUBMIT ALL FABRICATION SHOP DRAWINGS AND EQUIPMENT/FIXTURE CUTSHEETS TO SAA FOR REVIEW. CONTRACTOR SHALL PROVIDE THREE (3) COPIES. SAA SHALL HAVE TEN (10) WORK DAYS FOR SHOP DRAWING REVIEW TURNAROUND TIME FROM DATE OF RECEIPT. ALL SHOP DRAWINGS AND CUTSHEETS MARKED "REVIEWED" SHALL SUPERSEDE ORIGINAL DRAWINGS IN DESIGN APPEARANCE ONLY. CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ERRORS IN THEIR DRAWINGS.3 THE USE OF THE WORDS "PROVIDE" OR "PROVIDED" IN CONNECTION WITH ANY ITEM SPECIFIED IS INTENDED TO MEAN, UNLESS OTHERWISE NOTED, THAT WHICH SHALL BE FURNISHED AND INSTALLED, AND CONNECTED WHERE SO REQUIRED.4 WHERE THE TERMS “NO EXCEPTION”, "APPROVED EQUAL", "OTHER APPROVED", "EQUAL TO", "ACCEPTABLE" OR ANY OTHER GENERAL QUALIFYING TERMS ARE USED IN THESE NOTES, IT SHALL BE UNDERSTOOD THAT REFERENCE IS MADE TO THE SOLE INTERPRETATION AND JUDGMENT OF SAA.01 35 00 - SPECIAL PROCEDURES - HEALTH, SAFETY1 SHLEMMER ALGAZE ASSOCIATES IS UNAWARE OF ANY EXISTING ASBESTOS WITHIN THE AREA OF NEW WORK. IT IS THE OWNER'S RESPONSIBILITY TO ADVISE THE GENERAL CONTRACTOR & HIS SUBS OF ANY ASBESTOS CONTAINING MATERIAL OR OTHER HAZARDOUS MATERIALS WITHIN THE FACILITY AND TO PROPERLY REMEDIATE. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS REQUIRED BY LAW TO PROTECT ALL WORKERS & OCCUPANTS. NOTIFY THE OWNER IMMEDIATELY IF ANY ASBESTOS CONTAINING MATERIAL IS IDENTIFIED, OR IF ANY HAZARDOUS MATERIAL IS SUSPECTED.01 35 16 - ALTERATION PROJECT PROCEDURES1 THE WORK OF THIS PROJECT INCLUDES ALTERATIONS OF THE EXISTING BUILDING TO ACHIEVE THE ARRANGEMENT INDICATED ON THE DRAWINGS. THE CONTRACTOR SHALL VISIT THE JOB SITE TO DETERMINE THE EXTENT OF DEMOLITION WORK REQUIRED BY THE CONSTRUCTION ACTIVITIES. THE ARCHITECTURAL DRAWINGS FOR THESE AREAS SHOW THE CHANGES TO BE MADE. THE CONTRACTOR SHALL REVISE, REARRANGE, REROUTE OR REMOVE EXISTING WIRING AND HVAC DISTRIBUTION AS NECESSARY TO ACCOMMODATE THE CHANGES AND ADDITIONS SHOWN AND TO PROVIDE CONTINUING ELECTRICAL AND HVAC SERVICES FOR THOSE EXISTING PORTIONS OF THE PROJECT WHICH ARE TO REMAIN IN OPERATION.2 THE GENERAL CONTRACTOR SHALL PROPERLY PROTECT THE BUILDING AND ANY ADJOINING PROPERTY OR WORK AND ANY DAMAGE TO SAME, CAUSED BY HIS WORK OR WORKMEN MUST BE MADE GOOD WITHOUT DELAY. ANY COSTS FOR PATCHING AND REPLACING OF DAMAGED WORK SHALL BE BORNE BY THE GENERAL CONTRACTOR.3 IN AREAS WHERE THERE ARE NO ALTERATIONS INDICATED THE EXISTING FACILITIES SHALL BE RETAINED IN SERVICE. IN CASE OF DOUBT ASSUME THAT THE EXISTING ELECTRICAL WIRING IS TO REMAIN IN OPERATION THROUGHOUT THE CONSTRUCTION PERIOD AND THEREAFTER.4 THE ALTERATION OF THE EXISTING BUILDING IS WORK OF A COMPLEX NATURE WHICH WILL REQUIRE ACCURATE PLANNING, CAREFUL PREPARATION AND EXECUTION, ATTENTION TO DETAIL AND CLOSE SUPERVISION BY THE CONTRACTOR. THE CONTRACTOR WILL BE REQUIRED TO PERFORM THIS WORK IN FULL COOPERATION WITH THE OTHER CONSTRUCTION TRADES AND SUBJECT TO AN ACCEPTABLE SCHEDULE.5 ALL WOODWORK, BLOCKING, GROUNDS, ETC. TO BE FIRE RETARDANT TREATED.6 THE GENERAL CONTRACTOR SHALL PROVIDE ALL NECESSARY PROTECTION FOR HIS WORK UNTIL TURNED OVER TO THE CLIENT.7 THE GENERAL CONTRACTOR SHALL INCLUDE IN HIS ESTIMATE ALL COSTS, (INCLUDING OVERTIME WORK) FOR REMOVAL, NEW INSTALLATION AND REINSTALLATION WORK FOR ANY PLUMBING, CEILING (TAKE-DOWN AND REINSTALLATION), ELECTRICAL, TELEPHONE COMMUNICATIONS EQUIPMENT OR HVAC WORK WITHIN CEILING PLENUM.8 ALL EXISTING APPURTENANCES NOT BEING REMOVED SHALL BE REFURBISHED WHERE REQUIRED. ANY LOOSE ITEMS TIGHTENED (CEILING EXIT SIGNS, ETC.) AND ANY MISSING PARTS REPLACED BY THE GENERAL CONTRACTOR TO ACHIEVE A FINISHED FIRST CLASS INSTALLATION AND APPEARANCE.9 ALL REQUIRED EXITS, WAYS OF APPROACH THERETO, AND WAYS OF TRAVEL FROM THE EXIT INTO THE STREET SHALL CONTINUOUSLY BE MAINTAINED FREE FROM ALL OBSTRUCTIONS AND IMPEDIMENTS FOR UNOBSTRUCTED EGRESS IN THE CASE OF FIRE OR OTHER EMERGENCY.10 THE GENERAL CONTRACTOR SHALL PROVIDE AND INSTALL FIRE EXTINGUISHERS AS REQUIRED BY FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA), BY FIRE DEPARTMENT REGULATIONS, AND AS SHOWN ON SAA DRAWINGS.11 THE GENERAL CONTRACTOR SHALL REPLACE ALL BROKEN OR CRACKED WINDOW GLAZING. ALL WINDOW SASHES SHALL BE INSPECTED BY THE CONTRACTOR AND ALL INOPERABLE CONDITIONS SHALL BE REPAIRED.12 EACH TRADE SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING SEALANTS WHERE SHOWN ON DRAWINGS OR WHERE REQUIRED.13 PROVIDE STRUCTURAL SUPPORTS AT ALL WALL MOUNTED EQUIPMENT, CABINETS, PLUMBING AND LIGHT FIXTURES.14 WHERE OPENINGS OCCUR IN EXISTING FIRE RATED AREAS OR PARTITIONS DUE TO EXISTING OR NEW CONDUIT RUNS, DUCTWORK, CABLES, PIPING, ETC., AND/OR WHERE EXISTING FIREPROOFING HAS BEEN REMOVED AS A RESULT OF EXISTING OR NEW CONSTRUCTION WORK, THE GENERAL CONTRACTOR SHALL CLOSE AND/OR PATCH AS REQUIRED ALL OPENINGS TO MATCH IMMEDIATE ADJACENT AREA IN MATERIAL, FINISH AND FIRE RATING.15 WHERE CONSTRUCTION TO BE REMOVED INTERSECTS CONSTRUCTION TO REMAIN, WORK SHALL INCLUDE ALL ATTACHMENT DEVICES (SHOT PINS, ANCHORS, LAG BOLTS, NAILS, NAILERS, SHIMS, ETC.) REQUIRED FOR A SMOOTH AND EVEN TRANSITION.16 THE GENERAL CONTRACTOR SHALL SURVEY ALL EXISTING FINISHED SURFACES TO INCLUDE CORNER BEADS, STOPS, ETC. FOR CHIPS, CRACKS, HOLES, DAMAGED SURFACES, MARBLE WAINSCOT AND PLASTER CEILING WHENEVER DOOR FRAMES HAVE BEEN REMOVED, AND ANY OTHER DEFECTS CAUSING AN APPEARANCE DIFFERENT FROM A NEW FIRST CLASS FINISHED REPAIRING. GENERAL CONTRACTOR SHALL REMOVE ALL EXISTING DAMAGED FINISHES AND INSTALL NEW SURFACES TO THE SATISFACTION OF SAA. ALL OTHER DAMAGED SURFACES (FINISHED FLOOR SLAB, CONVECTOR ENCLOSURES, ETC.) SHALL BE REPAIRED TO THE SATISFACTION OF SAA.17 THE GENERAL CONTRACTOR SHALL INSPECT ALL EXISTING PLASTER SURFACES. WHERE, AS A RESULT OF DEMOLITION, EXISTING PLASTER HAS BEEN REMOVED AND NEW FINISHED SURFACES WILL NOT ALIGN WITH EXISTING, CONTRACTOR SHALL INSTALL NEW CORNER BEADS AND STOPS AND ENTIRE SURFACE SHALL BE RE-PLASTERED TO A SMOOTH, FLUSH, ALIGNED SURFACE. 01 40 00 - QUALITY REQUIREMENTS1 THE CONSTRUCTION NOTES AND/OR DRAWINGS ARE SUPPLIED TO ILLUSTRATE THE DESIGN AND THE GENERAL TYPE OF CONSTRUCTION QUALITY DESIRED. THEY ARE INTENDED TO APPLY TO THE FINEST QUALITY OF CONSTRUCTION, MATERIAL AND WORKMANSHIP THROUGHOUT.2 THE GENERAL CONTRACTOR SHALL MAINTAIN A CURRENT AND COMPLETE SET OF CONSTRUCTION DRAWINGS ON SITE DURING ALL PHASES OF CONSTRUCTION FOR USE BY ALL TRADES.01 11 00 - SUMMARY OF WORK 1 NEW DEMISING WALL LOCATION BETWEEN EXISTING SUITE 850 AND 860. EXISTING SUITE 850 CHANGED FROM ±3,809 SQ. FT. TO ±4,210 SQ. FT AND EXISTING SUITE 860 CHANGED FROM ±2,492 SQ. FT. TO ±2,093 SQ. FT. NEW WALL AND FINISHES.2 THE AMERICAN INSTITUTE OF ARCHITECTS GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION, AIA FORM A-201 CURRENT EDITION, SHALL APPLY TO ALL WORK IN THIS CONTRACT, EXCEPT AS SPECIFICALLY MODIFIED BELOW AND/OR BY THE OWNER/CONTRACTOR AGREEMENT.3 THE GENERAL CONTRACTOR SHALL NOTIFY SHLEMMER ALGAZE ASSOCIATES (SAA) IMMEDIATELY IF HE CANNOT COMPLY WITH ALL WORK CALLED FOR ON THESE DRAWINGS.4 THE GENERAL CONTRACTOR SHALL NOTIFY SAA IMMEDIATELY OF ANY DISCREPANCIES OR OMISSIONS BETWEEN THE DRAWINGS, THESE NOTES, AND FIELD CONDITIONS BEFORE COMMENCING ANY WORK AND REQUEST CLARIFICATION.5 ALL SAA DRAWINGS AND ALL CONSTRUCTION NOTES ARE COMPLEMENTARY, AND WHAT IS CALLED FOR BY EITHER WILL BE BINDING AS IF CALLED FOR BY ALL. ANY WORK SHOWN OR REFERRED TO ON ANY ONE SET OF DRAWINGS SHALL BE PROVIDED AS THOUGH SHOWN ON ALL RELATED DRAWINGS.6 INSURANCE AND BONDING FOR THE PROJECT SHALL BE AS DIRECTED BY AND TO THE SATISFACTION OF THE OWNER, AND AS REQUIRED IN THE OWNER-CONTRACTOR AGREEMENT.01 23 00 - ALTERNATES1 ALL ASSEMBLIES OR DETAILS MARKED AS ALTERNATES TO BASE REQUIREMENTS SHALL BE PRICED INDIVIDUALLY. NOTE THAT ALTERNATES MAY BE EITHER ADDITIVE OR DEDUCTIVE. BID FORM SHALL ITEMIZE ALL ALTERNATES.01 25 00 - SUBSTITUTION PROCEDURES1 THE GENERAL CONTRACTOR SHALL HAVE TEN WORKING DAYS FROM AWARD OF THE CONTRACT TO SUBMIT SUBSTITUTIONS, ON FORM APPROVED BY SAA, OF SPECIFIED PRODUCTS OR WORK FOR REVIEW BY SAA. CONTRACTOR SHALL INCLUDE CUT SHEETS WITH SPECIFICATIONS AND REASONS FOR SUBSTITUTION. SAA SHALL RESPOND IN TEN WORKING DAYS FROM RECEIPT OF SUBMITTAL AS TO ACCEPTANCE OR REJECTION OF PROPOSED SUBSTITUTION. NO REQUEST FOR SUBSTITUTIONS SHALL BE REVIEWED OR ACCEPTED AFTER THE INITIAL TIME LIMIT HAS PASSED.01 26 00 - CONTRACT MODIFICATION PROCEDURES1 THE OWNER WITHOUT INVALIDATING THE CONTRACT MAY ORDER EXTRA WORK OR MAKE CHANGES BY ALTERING, ADDING TO OR DEDUCTING FROM THE WORK. THE CONTRACT SUM SHALL BE ADJUSTED ACCORDINGLY. ALL SUCH WORK SHALL BE EXECUTED UNDER THE CONDITIONS OF THE ORIGINAL CONTRACT EXCEPT THAT ANY CLAIM FOR EXTENSIONS OF TIME CAUSED THEREBY SHALL BE ADJUSTED AT THE TIME OF ORDERING SUCH CHANGE. 2 IF THE GENERAL CONTRACTOR DETERMINES THAT ANY REVISION TO DRAWINGS INVOLVE EXTRA COST UNDER THIS CONTRACT, HE SHALL GIVE SHLEMMER ALGAZE ASSOCIATES WRITTEN NOTICE THEREOF WITHIN REASONABLE AMOUNT OF TIME AFTER RECEIPT OF SUCH INSTRUCTIONS. THE REQUEST SHALL INCLUDE A COMPLETE DESCRIPTION OF THE WORK BEING PERFORMED, LOCATION OF THE WORK, MATERIALS BEING USED, AND ANY OTHER COSTS. BEFORE PROCEEDING TO EXECUTE THE WORK, THE PROCEDURE SHALL BE AS PROVIDED FOR IN THE OWNER-CONTRACTOR AGREEMENT. NO EXTRA COSTS SHALL BE VALID UNLESS APPROVED IN WRITING BY THE OWNER AND ARCHITECT. UNLESS OTHERWISE AGREED, NO PAYMENT WILL BE MADE WITHOUT WRITTEN APPROVAL. 01 29 00 - PAYMENT PROCEDURES1 THE GENERAL CONTRACTOR SHALL SUBMIT ALL APPLICATIONS FOR PAYMENT TO THE OWNER OR OWNER DESIGNATED AGENT FOR REVIEW AND APPROVAL. THE FORM OF THE APPLICATION FOR PAYMENT SHALL BE AIA DOCUMENT G702, SUPPORTED BY AIA DOCUMENT G702A CONTINUATION SHEET. A 10% RETAINAGE OF EACH APPLICATION FOR PAYMENT SHALL BE WITHHELD BY THE OWNER UNTIL RELEASE OF FINAL PAYMENT UNLESS NOTED OTHERWISE IN THE AGREEMENT BETWEEN THE OWNER AND CONTRACTOR.01 31 00 - PROJECT MANAGEMENT AND COORDINATION1 INTENT OF THE DRAWINGS IS TO SHOW EXISTING BUILDING CONDITIONS WITH INFORMATION DEVELOPED FROM AVAILABLE DOCUMENTS. CONTRACTOR SHALL MAKE A DETAILED SURVEY OF EXISTING CONDITIONS PERTAINING TO THE WORK BEFORE COMMENCING ANY DEMOLITION OR NEW CONSTRUCTION. THE CONTRACTOR SHALL REPORT DISCREPANCIES BETWEEN DRAWINGS AND ACTUAL FIELD CONDITIONS TO THE ARCHITECT.2 LARGE SCALE DRAWINGS TAKE PRECEDENCE OVER SMALL SCALE DRAWINGS. DETAILS TAKE PRECEDENCE OVER ALL. NOTIFY ARCHITECT OF CONFLICTS OR DISCREPANCIES IN WRITING.3 DIMENSION CONVENTIONS:A) HORIZONTAL DIMENSIONS ARE SHOWN FROM FACE OF FINISH, UNLESS OTHERWISE NOTED.B) DIMENSIONS NOTED "CLEAR" OR "CLR." MUST BE PRECISELY MAINTAINED: ALLOWING FOR THICKNESS OF MATERIALS.C) DIMENSIONS ARE NOT ADJUSTABLE WITHOUT ARCHITECT'S APPROVAL, UNLESS NOTED.D) DIMENSIONS TO EXTERIOR WINDOW WALL ARE TO INSIDE FINISHED FACE OF THE WALL, UNLESS OTHERWISE NOTED.E) DIMENSIONS TO EXTERIOR GLAZING ARE TO THE INSIDE FACE OF THE EXTERIOR GLAZING.F) VERTICAL DIMENSIONS ARE FROM THE TOP OF THE FINISHED FLOOR, UNLESS OTHERWISE NOTED.G) DO NOT SCALE DRAWINGS. IF ANY ITEM OF WORK CANNOT BE LOCATED, DO NOT PROCEED WITH THE WORK BEFORE CLARIFYING WITH ARCHITECT.H) VERIFY DIMENSIONS MARKED "V.I.F." PRIOR TO START OF CONSTRUCTION. REPORT INCONSISTENCIES TO ARCHITECT.4 DEFINITION OF TERMINOLOGY:I) "TYPICAL" MEANS IDENTICAL FOR ALL CONDITIONS, UNLESS OTHERWISE NOTED.J) "SIMILAR" MEANS COMPARABLE CHARACTERISTICS FOR THE CONDITIONS NOTED. K) "PROVIDE" MEANS FURNISH AND INSTALL, COMPLETE AND IN PLACE.L) "FURNISH" MEANS FURNISH ONLY, INSTALLATION BY GENERAL CONTRACTOR UNLESS OTHERWISE NOTED.M) "INSTALL" MEANS PUT INTO PLACE, SUPPLIED BY GENERAL CONTRACTOR UNLESS OTHERWISE NOTED.N) "ALIGN" MEANS ACCURATELY LOCATE FINISH FACES IN THE SAME PLANE.5 BEFORE SUBMITTING A PROPOSAL, ALL CONTRACTORS SHALL VISIT THE PREMISES, FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND SATISFY THEMSELVES AS TO THE NATURE AND SCOPE OF THE WORK AND THE DIFFICULTIES THAT ATTEND TO ITS EXECUTION. CONTRACTOR SHALL REVIEW THE CONSTRUCTION DOCUMENT AND MAKE THE OWNER AWARE OF REQUIRED ITEMS THAT ARE MISSING FROM THE CONSTRUCTION DOCUMENTS. IF REQUIRED ITEMS ARE MISSING, THE CONTRACTOR SHALL BRING THESE ITEMS TO THE ATTENTION OF THE OWNER DURING THE BIDDING PERIOD.6 THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE AND LATER CLAIMS FOR LABOR, EQUIPMENT, OR MATERIAL REQUIRED FOR DIFFICULTIES ENCOUNTERED, WHICH COULD HAVE BEEN FORESEEN HAD SUCH AN EXAMINATION BEEN MADE, WILL NOT BE RECOGNIZED.7 CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS AT THE JOB SITE AS IT RELATES TO THEIR WORK AND THE WORK OF THEIR SUBCONTRACTORS. VERIFY DIMENSIONS AND ORIENTATION ON PLANS AND ELEVATIONS. WRITTEN DIMENSIONS GOVERN, DO NOT SCALE DRAWINGS.8 THE GENERAL CONTRACTOR SHALL PROVIDE TO ALL SUBCONTRACTORS COMPLETE SETS OF WORKING DRAWINGS OR ASSUME FULL RESPONSIBILITY FOR COORDINATION OF WORK WHEN COMPLETE SETS ARE NOT AVAILABLE TO SUBCONTRACTOR.9 MANUFACTURERS NAME, TRADEMARK, LOGOS, ETC., SHALL NOT BE VISIBLE TO THE PUBLIC.10 ALL FINISH CONTRACTORS TO FIELD VERIFY SIZE OF ROOMS AND WALLS PRIOR TO PLACING ORDERS OR SUBMITTING BIDS.11 THESE DRAWINGS ARE FOR DESIGN INTENT. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY SITE CONDITIONS, AND INFORM SAA OF ANY CONFLICTS OR ANY ADDITIONAL WORK NECESSARY TO PROVIDE A COMPLETE FINISHED PROJECT, PRIOR TO SUBMITTING BIDS.12 ARCHITECTURAL DOCUMENTS SUPERSEDE ENGINEERING DRAWINGS. IN THE EVENT A DISCREPANCY OCCURS THAT HAS AESTHETIC RAMIFICATIONS, CONTACT THE ARCHITECT FOR CLARIFICATION.13 THE GENERAL CONTRACTOR SHALL VERIFY SIZE, ELECTRICAL REQUIREMENTS, LOCATION AND CHARACTERISTICS OF ALL WORK AND/OR EQUIPMENT SUPPLIED BY THE OWNER OR OTHERS, WITH THE MANUFACTURER OR SUPPLIER PRIOR TO THE START OF RELATED WORK.14 THE GENERAL CONTRACTOR AGREES TO PAY ALL TRANSPORTATION CHARGES ON ALL MATERIAL OR EQUIPMENT TO THE POINT OF USE, AND SHALL BE RESPONSIBLE FOR ALL UNLOADING, CHECKING AND STORING OF SAME IN CONNECTION WITH THIS CONTRACT. OWNER WILL ONLY PAY FOR INSTALLED PRODUCTS AND EQUIPMENT. 01 32 00 - CONSTRUCTION PROGRESS DOCUMENTATION1 PRIOR TO BEGINNING ANY WORK THE GENERAL CONTRACTOR SHALL FURNISH A CONSTRUCTION SCHEDULE SHOWING THE CHRONOLOGICAL PHASE OF HIS WORK AND ALL RELATED WORK FOR THE COMPLETION OF THE PROJECT. THIS SCHEDULE SHALL INDICATE ALL ORDERING LEAD TIMES, LENGTH OF TIME FOR EACH PHASE, ITS START AND COMPLETION, WITH A PROJECTED COMPLETION DATE. CONTRACTOR TO VERIFY AVAILABILITY OF ALL PRODUCTS SPECIFIED AND NOTIFY ARCHITECT IMMEDIATELY IF THERE ARE ANY DISCREPANCIES WITH PROJECT COMPLETION DATE. PRODUCTS MAY REQUIRE A LONG LEAD TIME. CONTRACTOR SHALL TAKE INTO ACCOUNT IN HIS SCHEDULE ALL LONG LEAD ITEMS, AND PLAN ACCORDINGLY SO AS TO NOT DELAY COMPLETION OF THE PROJECT.2 THE GENERAL CONTRACTOR IS WHOLLY RESPONSIBLE FOR THE COORDINATION AND SCHEDULING OF THE WORK EFFORT FOR ALL SUBCONTRACTORS, CRAFTSMAN AND TRADESMAN REQUIRED TO COMPLETE THE JOB.08 00 00 OPENINGS08 10 00 - DOORS AND FRAMES1 THE GENERAL CONTRACTOR SHALL PROVIDE AND INSTALL REQUIRED FRAMES AND ASSEMBLIES AS SHOWN ON SHLEMMER ALGAZE ASSOCIATES DRAWINGS UNLESS OTHERWISE NOTED. COORDINATE OVERALL DOOR FRAME DEPTHS WITH WALL TYPES. DOOR AND FRAME ASSEMBLY DIMENSIONS SHALL BE FIELD VERIFIED PRIOR TO FABRICATION AND INSTALLATION.09 00 00 FINISHES09 22 16.13 - NON-STRUCTURAL METAL STUD FRAMING1 THE GENERAL CONTRACTOR SHALL PROVIDE AND INSTALL ALL PARTITIONS DESIGNATED ON SAA DRAWINGS. 2 THE GENERAL CONTRACTOR SHALL PROVIDE ALL WALL TYPE AND WALL RATING MARKINGS ON THE FINISH FLOOR OF ALL PARTITIONS FOR SAA REVIEW.3 UNLESS OTHERWISE NOTED, ALL DIMENSIONS FOR PARTITIONS ARE FROM FINISH FACE OF NEW WALLS, AND/OR FINISH FACE OF EXISTING WALLS. ALL HEIGHTS ARE FROM THE TOP OF THE FINISHED FLOOR UNLESS OTHERWISE NOTED.4 WALL SHOWN ALIGNED WITH BASE BUILDING STRUCTURE SHALL HAVE A FLUSH AND SMOOTH TRANSITION WITH BASE BUILDING STRUCTURE UNLESS OTHERWISE NOTED. 5 ALL PARTITIONS SHALL BE SECURELY ANCHORED AS PER MANUFACTURERS SPECIFICATIONS AND AS REQUIRED BY THE STATE AND LOCAL CODES.6 THE GENERAL CONTRACTOR SHALL PROVIDE SUFFICIENT FRAMING FOR ALL WALL PARTITIONS, AND FOR ALL DUCT WORK, RETURN AIR OPENINGS AND GRILL OPENINGS ABOVE AND BELOW HUNG CEILING. THESE OPENINGS ARE TO BE COORDINATED WITH HVAC ENGINEERING DRAWINGS AND THE MECHANICAL CONTRACTORS SHOP DRAWINGS. ALL OPENINGS SHALL BE PROPERLY SEALED FOR SOUNDPROOFING AND VIBRATION.7 THE GENERAL CONTRACTOR SHALL PROVIDE AND INSTALL ALL ACCESS PANELS AS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING INSTALLATIONS PER LOCAL BUILDING CODES. LOCATIONS SHALL BE COORDINATED WITH SAA PRIOR TO FINAL INSTALLATION.8 THE GENERAL CONTRACTOR WILL NOT BE ENTITLED TO A CHANGE ORDER FOR OPENING ANY PARTITIONS BECAUSE OF TELEPHONE INSTALLATION, SECURITY SYSTEMS OR COMPUTER DATA SYSTEMS.9 SAA SHALL HAVE THE RIGHT TO REVIEW AND APPROVE ALL CHALK LINES PRIOR TO INSTALLATION OF WALL TRACK. SAA IS TO BE NOTIFIED OF ANY REQUIRED DEVIATION FROM CONSTRUCTION DIMENSIONS OR CLEARANCES AS DESIGNATED ON PLAN OR ANY APPARENT CONSTRUCTION CONFLICTS.10 THE GENERAL CONTRACTOR IS TO VERIFY, PRIOR TO BID, THE RATING OF THE EXISTING PARTITIONS, COLUMNS, ETC. THE GENERAL CONTRACTOR SHALL PROVIDE WALL FURRING AT EXISTING PARTITIONS WITH A RATING OF GREATER THEN 1 HOUR WHERE REQUIRED TO ACCOMMODATE ELECTRICAL OR PLUMBING CONDITIONS AS INDICATED ON THE DRAWINGS.11 STANDARD DRYWALL STUDS SHALL BE ELECTRO-GALVANIZED STEEL WITH PUNCHED UTILITY OPENINGS AND KNURLED FLANGE WITH AT LEAST 1-1/4" WIDE FLANGE RETURNS. FURNISH 25 GA. STUDS EXCEPT WHERE 20 GAUGE OR HEAVIER IS SHOWN OR REQUIRED ON THE DRAWINGS.12 GAUGE SPECIFIED ABOVE ARE A MINIMUM, WHERE REQUIRED STUD HEIGHT EXCEEDS CODE COMPLIANCE, PROVIDE HEAVIER GAUGE STUDS OR DECREASE STUD SPACING AS NECESSARY TO CONFORM TO CODE.13 ALL INTERIOR PARTITIONS HAVE BEEN DESIGNED COMPLIANT TO 2022 CBC 1607.5 AND CAN WITHSTAND A HORIZONTAL LOAD OF 5 LBS. SEE SHEET A-9.0.14 ALL FIRE RATED PARTITIONS SHALL MEET CONSTRUCTION REQUIREMENTS PER 2022 CBC TABLE 721.1(2) ITEM # 13-1.115 ALL PIPE AND CONDUIT PENETRATIONS THROUGH FIRE RATED PARTITIONS SHALL BE FULLY SEALED WITH APPROVED FIRE RATED CAULKING MATERIAL, AND ALL DUCTWORK FITTED WITH APPROPRIATELY SIZED FIRE DAMPERS.09 29 00 - GYPSUM BOARD1 ALL GYPSUM BOARD CONSTRUCTION IS TO MEET THE GYPSUM ASSOCIATION STANDARDS.2 THE GENERAL CONTRACTOR SHALL USE CORNER BEADS AT ALL EXPOSED CORNERS AND J-MOULD TRIM AT ALL EXPOSED ENDS IN PLASTER AND DRYWALL PARTITIONS.3 ALL DRYWALL SHALL BE INSTALLED WITH VERTICAL JOINTS ONLY. ALL JOINTS SHALL OCCUR AT STUDS ONLY. USE APPROPRIATE SIZE AND LENGTH FASTENERS TO SUIT APPLICATION.4 GYPSUM BOARD FINISH SHALL BE AS REQUIRED BY SAA AND APPROPRIATE TO THE TYPE OF WALL AND LOCATION SERVED.09 30 00 - TILING1 CERAMIC TILE INSTALLATION METHOD - (DRY METHOD). CONTRACTOR TO INSTALL CERAMIC TILE IN ACCORDANCE WITH ANSI/TCA A108.5 SPECIFICATIONS. HORIZONTAL MORTAR BED SHALL BE A THIN SET BOND COAT, DRY OR LATEX PORTLAND CEMENT MORTAR MEETING ANSI/TCA F113-89. VERTICAL APPLICATION SHALL MEET ANSI/TCA METHOD W242-89, GROUT SHALL BE CEMENTING DRY CURE TYPE WITH LATEX ADDITIVE FOR STRENGTH AND ACID RESISTANCE; COLOR TO BE AS SPECIFIED BY SHLEMMER ALGAZE ASSOCIATES. PROVIDE ALL NECESSARY CAPS, STOPS, RETURNS, TRIMMERS AND OTHER SHAPES TO COMPLETE INSTALLATION. PROVIDE COVE TYPE BASE TO MATCH WALL WHERE WALL TILE IS USED, OTHERWISE MATCH COLOR OF FLOOR TILE. PROVIDE THRESHOLD AT WALL OR FRAME OPENINGS TO OTHER BUILDING AREAS NOT RECEIVING CERAMIC TILE FLOOR FINISH. 2 CERAMIC TILE INSTALLATION METHOD - (WET METHOD). CONTRACTOR IS TO INSTALL CERAMIC TILE IN ACCORDANCE WITH ANSI/TCA A108.5 SPECIFICATIONS. HORIZONTAL MORTAR BED SHALL BE A THIN SET BOND COAT, DRY OR LATEX PORTLAND CEMENT MORTAR MEETING ANSI/TCA F122-89. VERTICAL APPLICATION SHALL MEET ANSI/TCA METHOD W223-89. SHOWER STALL SHALL MEET ANSI/TCA B416-89. GROUT SHALL BE CEMENTING DRY CURE TYPE WITH LATEX ADDITIVE FOR STRENGTH AND ACID RESISTANCE; COLOR TO BE AS SPECIFIED BY SHLEMMER ALGAZE ASSOCIATES. PROVIDE ALL NECESSARY CAPS, STOPS, RETURNS, TRIMMERS AND OTHER SHAPES TO COMPLETE INSTALLATION. PROVIDE COVE TYPE BASE TO MATCH WALL WHERE WALL TILE IS USED, OTHERWISE MATCH COLOR OF FLOOR TILE. PROVIDE THRESHOLD AT WALL OR FRAME OPENINGS TO OTHER BUILDING AREAS NOT RECEIVING CERAMIC TILE FLOOR FINISH.3 CONTRACTOR IS TO INSTALL CERAMIC TILE IN ACCORDANCE WITH ANSI/TCA A108.5 INSTALLATION SPECIFICATIONS. MORTAR BED SHALL BE A THIN-SET BOND COAT, DRY CEMENT MORTAR MEETING ANSI/TCA A118.4. GROUT SHALL BE CEMENT DRY CURE TYPE, WITH LATEX ADDITIVE FOR STRENGTH AND ACID RESISTANCE, COLOR TO BE SPECIFIED BY DESIGNER. PROVIDE NECESSARY CAPS, STOPS, RETURNS, TRIMMERS AND OTHER SHAPES TO COMPLETE INSTALLATION. PROVIDE COVE TYPE BASE TO MATCH WALL WHERE WALL TILE IS USED, OTHERWISE MATCH COLOR OF FLOOR TILE. PROVIDE THRESHOLD AT WALL OR FRAME OPENINGS TO OTHER BUILDING AREAS NOT RECEIVING CERAMIC TILE FLOOR FINISH.4 CERAMIC TILE INSTALLATION TO BE IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDED INSTRUCTIONS AND ANSI A108, A118 AND A136. 5 CERAMIC TILE LAYOUT DIAGRAM TO BE APPROVED BY SHLEMMER ALGAZE ASSOCIATES BEFORE ORDERING/INSTALLATION OF TILE. 09 33 00 - STONE TILING1 STONE TILE INSTALLATION SHALL BE A THIN-SET APPLICATION CONFORMING TO ANSI A108.4 TCNA HANDBOOK AND SECTION 12 SHEET A0.2, REQUIREMENTS FOR HORIZONTAL AND VERTICAL APPLICATIONS. GROUTED JOINTS SHALL BE 1/16” AND CONFORM TO ANSI A108.10 AND TCNA HANDBOOK SPECIFICATIONS. GROUT COLOR TO BE SPECIFIED BY SHLEMMER ALGAZE ASSOCIATES. GROUT COLOR AT STONE TILE FLOORING SHALL BE COLORED TO MATCH THE ADJACENT FLOORING MATERIAL OR AS SELECTED BY SAA UNLESS OTHERWISE NOTED. WHERE MORE THAN ONE COLOR IS TO BE INSTALLED, GROUT COLOR SHALL BE CONFIRMED WITH SAA BEFORE INSTALLATION. EXPANSION JOINTS SHALL MEET TCNA METHOD EJ171. ALL HORIZONTAL SURFACES SHALL RECEIVE A CLEAR SEALER COAT AS MANUFACTURED BY MIRA-SEAL #511 OR EQUAL, AND SHALL BE APPLIED IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.2 PROVIDE FLUSH STONE THRESHOLD TO MATCH ADJACENT STONE FLOORING AT TRANSITIONS BETWEEN STONE AND CARPET FLOORING.3 STONE TILE LAYOUT DIAGRAM TO BE APPROVED BY SHLEMMER ALGAZE ASSOCIATES BEFORE ORDERING/INSTALLATION OF TILE. 4 MARBLE TILE INSTALLATION SHALL BE A THIN-SET APPLICATION CONFORMING TO ANSI A108.4 AND TCNA HANDBOOK AND SECTION 12 SHEET GN-1, REQUIREMENTS FOR HORIZONTAL AND VERTICAL APPLICATIONS. GROUTED JOINTS SHALL BE 1/16" AND CONFORM TO ANSI A108.10 AND TCNA HANDBOOK SPECIFICATIONS. GROUT COLOR IS TO BE SELECTED BY SAA. EXPANSION JOINTS SHALL MEET TCNA METHOD EJ171. ALL HORIZONTAL SURFACES SHALL RECEIVE A CLEAR SEALER COAT AS MANUFACTURED BY MIRA-SEAL #511 OR EQUAL AND SHALL BE APPLIED IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS. 09 50 00 - CEILINGS1 CONTRACTOR SHALL REFER TO ALL PERTINENT SECTIONS OF THE GENERAL NOTES, SPECIFICATIONS, AND SCHEDULE OF FINISHES FOR COMPLETE AND PROPER INSTALLATION OF WORK.2 GENERAL CONTRACTOR SHALL ENSURE CLEARANCE HEIGHT FOR LIGHT FIXTURES, DUCTS, FIRE SPRINKLERS, ETC. SHOULD ANY OBSTRUCTIONS OCCUR THAT PREVENT INSTALLATION OF ANY REQUIRED COMPONENT, NOTIFY SAA PRIOR TO INSTALLATION OF GRID. INSTALLATION WITHOUT APPROVAL SHALL BE REMOVED REINSTALLED PER DIRECTION OF SAA AT GENERAL CONTRACTORS SOLE EXPENSE.3 FIRE/LIFE SAFETY FIXTURES SHOWN ON PLAN ARE SUGGESTED LOCATIONS ONLY. CONTRACTOR TO PREPARE AND COORDINATE DESIGN/BUILD DRAWINGS SHOWING APPROPRIATE LOCATION OF STROBES AND EXIT SIGNS. SUBMIT COORDINATED SHOP DRAWINGS TO SAA FOR REVIEW AND TO LOCAL FIRE DEPARTMENT FOR PERMIT PRIOR TO THE COMMENCEMENT OF ANY INSTALLATION.4 BOTH NEW AND EXISTING SPRINKLER HEADS FOR THE AREA OF WORK SHALL BE LOCATED PER SPRINKLER CONTRACTOR DESIGN/BUILD DRAWINGS. ONCE SUBMITTED TO AND REVIEWED BY SAA, DRAWINGS SHALL THEN BE SUBMITTED TO LOCAL FIRE DEPARTMENT FOR APPROVAL.5 ALL FIXTURES, DEVICES, AND SPRINKLER HEADS ARE TO BE LOCATED AT THE CENTER OF CEILING TILE UNLESS NOTED OTHERWISE, PROVIDE PROPOSED LOCATIONS IN DRYWALL CEILING TO SAA FOR APPROVAL.6 REFER TO DRAWING DETAILS FOR TYPICAL SUSPENDED CEILING GRID SUPPORT.7 ALL LAY IN PANELS SHALL BE SECURED TO THE SUSPENSION SYSTEM WITH TWO HOLD-DOWN CLIPS MINIMUM FOR EACH TILE WITHIN A 4-FOOT RADIUS OF THE EXIT LIGHTS AND EXIT SIGNS.8 CEILING GRID SHALL BE INSTALLED WITHIN A LEVEL HORIZONTAL TOLERANCE OF 1/8" PER 12'-0". SUPPORT AND BRACE AS INDICATED ON REFLECTED CEILING PLAN DETAILS.9 PROVIDE ACCESS PANELS WHERE REQUIRED WHEN CEILING SYSTEM IS SUSPENDED GYP. BOARD. (EXACT LOCATION OF ACCESS PANELS TO BE APPROVED BY OWNER/ ARCHITECT). ALL ACCESS PANELS IN GYPSUM BOARD CEILING TO BE GFRG ACCESS PANELS SIZED AS REQUIRED. "MOONLIGHT MOLDS" OR APPROVED EQUAL. PROVIDE BOTH 24" X 24" & 18" X 18" SIZED OPENING ACCESS PANELS. CONFIRM SIZE AND LOCATION WITH SAA. ACCESS PANELS SHALL BE PROVIDED FOR ELECTRICAL, PLUMBING AND AIR CONDITIONING CONTROLS OR AS REQUIRED BY THE UNIFORM BUILDING CODE, UNIFORM MECHANICAL CODE, NFPA, UPC AND LOCAL CITY CODES. IF LOCATION AND TYPE IS NOT SHOWN ON DRAWINGS, CONFIRM LOCATION AND TYPE WITH SAA PRIOR TO INSTALLATION.10 RELOCATE/RAISE EXISTING BACK BOXES, CONDUIT, HVAC EQUIPMENT, DEVICES AND ANY OTHER ITEMS THAT WILL NEED UPWARD RELOCATION BASED ON NEW ROOM CEILING HEIGHT.11 CEILING GRID SYSTEMS WITHIN AREA OF WORK ARE TO BE INSTALLED IN A CONTINUOUS GRID PATTERN SO THAT WHEN A PENETRATING PARTITION IS REMOVED, NECESSARY CEILING REPAIRS WILL RESULT IN A CONSISTENT CEILING GRID.12 LATERAL BRACING SHALL BE PROVIDED BY WIRES OF MINIMUM 12 GA., SPLAYED IN FOUR DIRECTIONS AND 90 DEGREES APART. CONNECT TO THE MAIN RUNNER WITHIN 12 INCHES OF THE CROSS RUNNER AND TO THE STRUCTURE ABOVE OR TO PARTITION. ATTACH TO WALLS OR BRACE AT AN ANGLE NOT TO EXCEED 45 DEGREES FROM THE PLANE OF THE CEILING. SUPPORT POINTS SHALL BE PLACED 12" O.C. IN EACH DIRECTION WITH THE FIRST POINT WITHIN 4'-0" FROM EACH WALL13 3403.6 - SUSPENDED CEILING UPGRADE. WHEN AN ADDITION, ALTERATION OR REPAIR IS PERFORMED ON AN OCCUPANCY IN WHICH THERE IS AN EXISTING SUSPENDED CEILING, SUCH SUSPENDED CEILING SHALL BE MODIFIED THROUGHOUT TO COMPLY WITH THE PROVISIONS OF ASTM C 635 AND ASTM C 636. (2022 CBC 808.1.1.1).14 AT ALL EXISTING CEILINGS TO REMAIN, THE GENERAL CONTRACTOR SHALL PROVIDE ADDITIONAL AND/OR NEW COMPRESSION POST AND LATERAL BRACING OF THE CEILING GRID AT ALL AREAS WHICH ARE NOT IN COMPLIANCE WITH CURRENT CODES.15 SUSPENSION SYSTEM SHALL BE AS INDICATED IN REFLECTED CEILING PLAN. LIGHT FIXTURES SHALL BE INDEPENDENTLY SUPPORTED AT OPPOSITE CORNERS WITH NO. 12 WIRES.16 PROVIDE NEW SUSPENDED CEILING TO CONCEAL PIPING, DUCTS, ETC. IN FINISHED ROOMS. IF EXISTING CONDITIONS REQUIRE DEVIATIONS FROM INDICATED CEILING HEIGHTS DUE TO STRUCTURAL OR MECHANICAL REQUIREMENTS, OBTAIN SAA APPROVAL BEFORE INSTALLING CEILING. 17 ALL CEILING FINISHES SHALL BE NON-COMBUSTIBLE OR HAVE A FLAME SPREAD INDEX OF 0 TO 25; SMOKE-DEVELOPED INDEX 0-450.09 60 00 - FLOORING1 CONTRACTOR SHALL FURNISH AND INSTALL ALL FLOOR FINISHES AS SPECIFIED ON THE DRAWINGS AND SPECIFICATIONS. 2 CONTRACTOR TO PREP FLOORS FOR NEW FLOOR COVERING, FLOAT FLOORS TO LEVEL SURFACE AS REQUIRED TO ACCEPT NEW FLOOR FINISH MATERIAL. THE GENERAL CONTRACTOR SHALL PATCH ALL CRACKS, HOLES OR OTHER IMPERFECTIONS (PROJECTIONS SHALL BE REMOVED AND PATCHED TO PROVIDE A CONTINUOUS SMOOTH FLOOR SURFACE). FLOOR LEVEL SHALL NOT EXCEED 1/8" IN 10-0" NON-CUMULATIVE. 3 THE GENERAL CONTRACTOR SHALL NOTIFY SAA AFTER FLOOR PATCHING IS COMPLETE AND RECEIVE THEIR REVIEW AND ACCEPTANCE PRIOR TO INSTALLATION OF FINISHED FLOORING. 06 00 00 WOOD, PLASTICS AND COMPOSITES06 41 00 - ARCHITECTURAL WOOD CASEWORK1 REFER TO THE “GENERAL NOTES AND INFORMATION SHEETS” FOR ADDITIONAL NOTES.2 CONTRACTOR TO SUBMIT COMPLETE SHOP DRAWINGS FOR APPROVAL AND VERIFY ALL DIMENSIONS IN THE FIELD BEFORE FABRICATION. CONFIRM ALL MATERIALS AND FINISHES ON SHOP DRAWINGS. SUBMIT (4) 9”X9” SAMPLES OF EACH FINISH FOR APPROVAL. CONTRACTOR SHALL SUBMIT MSDS SHEETS, SIGNED ATTESTATIONS OR OTHER OFFICIAL LITERATURE FROM MANUFACTURER FOR ALL ADHESIVES AND SEALANTS USED ON THE PROJECT. ALL JOINTS, CORNERS AND EDGES ARE TO BE DETAILED IN INDIVIDUAL DETAILS. ALL DIMENSIONS, CRITICAL OR OTHERWISE, ARE TO BE CALLED OUT ON THE SHOP DRAWINGS. SHLEMMER ALGAZE ASSOCIATES WILL NOT REVIEW DRAWINGS WHICH ARE INCOMPLETE AND SHOW MINIMAL DETAILING. ALL CASEWORK, SPECIAL PRODUCTS, AND SPECIAL ASSEMBLIES ARE SUBJECT TO SUBMITTAL AND SHOP DRAWING REVIEW. SHOP DRAWINGS AND SUBMITTAL'S SHALL NOT BE WAIVED UNLESS WRITTEN PERMISSION TO DO SO IS GIVEN BY SHLEMMER ALGAZE ASSOCIATES.3 ALL WOOD VENEERED OR CONVERSION VARNISH FINISHED CASEWORK SHALL BE FABRICATED TO WI PREMIUM GRADE STANDARDS. ALL EXPOSED SURFACES INCLUDING DOORS, TOPS AND BASE SHALL BE VENEERED. CASEWORK SHALL BE BIRCH PLYWOOD STAINED TO MATCH FINISH VENEER.4 ALL PLASTIC LAMINATE MILLWORK TO BE FABRICATED TO WI CUSTOM GRADE STANDARDS. ALL EXPOSED SURFACES TO BE LAMINATE. CASEWORK AT WHITE LAMINATE TO BE 5/8” WHITE KORTRON. CASEWORK AT COLORED LAMINATE SHALL BE 5/8” BLACK KORTRON.5 COORDINATE LOCATIONS AND PROVIDE METAL BACKING AT WALL FRAMING FOR ALL WALL- MOUNTED CASEWORK. ALL "INSTALLED" CABINETS SHALL BE SCRIBED TO WALL OR CEILING. CABINET CONTRACTOR TO CHECK JOB PROGRESS AND COORDINATE WITH OTHER TRADES INVOLVED. REFER TO DRAWING DETAILS FOR BACKING SUPPORT OF WALL HANGING ITEMS.6 CONTRACTOR SHALL SUPPLY AND INSTALL ALL NECESSARY HARDWARE REQUIRED BY THE SPECIFICATIONS OR INTENT OF THE DESIGN. SUBMIT TO SAA FOR APPROVAL CUT SHEETS OF ALL CABINET HARDWARE AND SAMPLES OF ALL PULLS AND KNOBS PRIOR TO FABRICATION.7 CONTRACTOR TO PROTECT CASEWORK DURING DELIVERY AND TAKE NECESSARY PRECAUTIONS TO ENSURE THAT INSTALLATION OF CASEWORK AND FINISH CARPENTRY WILL NOT BE DAMAGED BY OTHER CONSTRUCTION WORK.8 COMPOSITE WOOD AND AGRIFIBER PRODUCTS, INCLUDING CORE MATERIALS, SHALL NOT CONTAIN ANY UREAFORMALDEHYDE RESINS.9 LAMINATE ADHESIVES USED TO FABRICATE CASEWORK ON-SITE AND SHOP APPLIED ASSEMBLIES CONTAINING THESE LAMINATE ADHESIVES SHALL NOT CONTAIN ANY UREAFORMALDEHYDE.10 ALL ADHESIVES AND SEALANTS USED FOR MILLWORK, PANELING, OR VENEERING SHALL BE LOW VOC AND MUST NOT EXCEED THE VOC CONTENT LIMITS OF SCAQMD RULE #1168 REQUIREMENTS IN EFFECT ON JANUARY 1, 2011.11 AEROSOL ADHESIVES SHALL MEET REQUIREMENTS EQUAL TO GREEN SEAL STANDARD GC-36 IN EFFECT JANUARY 1, 2011. 12 THE GENERAL CONTRACTOR SHALL CLOSELY COORDINATE HIS WORK WITH THAT OF THE CABINET CONTRACTOR. 13 ALL CABINET FINISHES SHALL BE AS NOTED ON THE DETAILED DRAWINGS. 14 THE CABINET CONTRACTOR SHALL PROVIDE RUBBER BUMPERS ON ALL WOOD DOORS.15 WHERE MEMBERS ARE MITERED OR BUTTED, THEY SHALL BE JOINED AND SECURED IN A MANNER TO INSURE AGAINST THE JOINT OPENING. 16 ALL FINISHED WORK SHALL, AS FAR AS PRACTICAL, BE ASSEMBLED AND FINISHED IN THE SHOP AND DELIVERED TO THE BUILDING READY TO ERECT IN PLACE. 17 WHERE FILES ARE SHOWN AS BEING SET INTO CABINET WORK, THE CABINET CONTRACTOR SHALL SET AND BOLT ALL FILES TOGETHER. 18 THE GENERAL CONTRACTOR SHALL COORDINATE HIS WORK WITH THAT OF THE CASEWORK, STONE, OR OTHER SPECIALTIES CONTRACTORS. 19 ALL CASEWORK SHOWN SHALL HAVE PLASTIC LAMINATE TOPS, UNLESS OTHERWISE NOTED. 20 SHELVES AND SEMI-EXPOSED SURFACES, INCLUDING DRAWER INTERIORS, SHALL BE FINISHED WITH A MELAMINE CABINET LINER OF A UNIFORM COLOR THROUGHOUT. 21 ADJUSTABLE METAL SHELF STANDARDS SHALL BE DAPPED OR DRILLED INTO THE SIDES OF CABINETS, UNLESS OTHERWISE NOTED. 06 20 00 - FINISH CARPENTRY1 WOOD BASE SHALL, IN ALL CONDITIONS, BE INSTALLED RECESSED AND MATCH THE COLOR OF THE ADJACENT WALL, U.O.N. GENERAL CONTRACTOR TO CONFIRM WITH ARCHITECT COLOR IF NOT SPECIFIED ON DRAWINGS AND SUBMIT SAMPLE OF COLORED BASE FOR SAA APPROVAL PRIOR TO PURCHASE AND INSTALLATION.7 DURING THE ENTIRE PERIOD OF DEMOLITION AND CONSTRUCTION, ALL EXISTING EXITS, EXIT LIGHTING, FIRE PROTECTIVE DEVICES AND ALARMS SHALL BE CONTINUOUSLY MAINTAINED.8 THE GENERAL CONTRACTOR SHALL CUT AND CAP OFF BEHIND FINISH SURFACES ALL PROJECTING PLUMBING, FLOOR ELECTRICAL/TELEPHONE OUTLETS, AND ALL OTHER PROJECTING ITEMS WHICH ARE BEING ABANDONED.9 UPON COMPLETION OF THE DEMOLITION WORK, THE GENERAL CONTRACTOR SHALL LEAVE ALL AREAS IN A BROOM CLEAN CONDITION.10 DEMOLITION NOT DESCRIBED HERE BUT NECESSARY FOR THE COMPLETION OF THE WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE DEMOLITION DRAWINGS ARE ISSUED FOR INFORMATION ONLY AND SHOW THE GENERAL EXTENT OF THE DEMOLITION REQUIRED. THESE DRAWINGS DO NOT NECESSARILY SHOW EVERYTHING TO BE REMOVED IN ORDER TO PREPARE THE EXISTING BUILDING ELEMENTS FOR REMODELING OR NEW CONSTRUCTION. THE ARCHITECTURAL DRAWINGS SHOW THE EXISTING PARTITIONS WITH DOORS AND OTHER ITEMS TO REMAIN.11 ALL REMOVED MATERIAL OTHER THAN ITEMS TO BE SALVAGED OR REUSED SHALL BECOME CONTRACTORS PROPERTY U.O.N., AND SHALL BE REMOVED FROM OWNER'S PROPERTY. CLEAN UP AND DISPOSE OF DEBRIS PROMPTLY AND CONTINUOUSLY AS THE WORK PROGRESSES. SECURE AND PAY FOR REQUIRED HAULING PERMITS, DUMPING FEES AND CHARGES.12 ELECTRICAL, MECHANICAL AND PLUMBING ITEMS SHALL BE REMOVED TO THE FURTHEST TERMINATION POINT ON THE FLOOR. REMOVE ALL UNUSED AND DISCONNECTED HVAC, ELECTRICAL, PLUMBING AND PHONE/DATA CABLING ABOVE CEILING AND REMOVE TO THE FURTHEST TERMINATION POINT ON THE FLOOR. COORDINATE EXTENT OF REMOVAL WITH MECHANICAL/ELECTRICAL/PLUMBING DRAWINGS.13 EXISTING LIGHT FIXTURES, ELECTRICAL OUTLETS, RACEWAY AND WIRING ETC. WILL BE REMOVED AS NOTED PER ARCHITECTURAL AND ELECTRICAL DEMOLITION DRAWINGS.14 REMOVE ALL FIRE DAMPERS IN EXISTING DUCTWORK WHERE FIRE RATED WALLS ARE DEMOLISHED. REMOVE ALL FIRE DAMPERS THAT ARE NOT CODE COMPLIANT. REPLACE ANY FIRE DAMPERS WHERE DAMPERS WILL NEED TO BE UPGRADED TO MEET CURRENT CODE REQUIREMENTS AND RATED WALL IS SCHEDULED TO REMAIN.15 THERMOSTATS AND PNEUMATIC LINES SHALL BE REMOVED GENTLY AND COILED BACK TO THE DEVICE THEY CONTROL AND LEFT IN PLACE. ALL OTHER THERMOSTATS SHALL BE REMOVED AND RETURNED TO BUILDING OWNER.16 UPON REMOVAL OF THE EXISTING CEILING, THAT PORTION OF THE EXISTING MECHANICAL SYSTEM DESIGNATED TO BE RE-USED WILL BE EVALUATED BY THE ENGINEER. IF THE EXISTING MECHANICAL SYSTEMS ARE FOUND TO BE ACCEPTABLE FOR RE-USE, THEN THE EXISTING MAIN DUCT, VAV BOXES, PNEUMATIC CONTROL TUBING ETC. SHALL REMAIN AND SHALL BE PROTECTED TO AVOID DAMAGE TO EXISTING HVAC EQUIPMENT DURING DEMOLITION.17 CONTRACTOR TO VERIFY THAT ALL EXISTING LIGHT FIXTURES NOT BEING REUSED SHALL BE RETURNED TO BUILDING OWNER.18 THE EXISTING FIRE SPRINKLER SYSTEM SHALL REMAIN IN PLACE (ONLY DURING DEMOLITION). ALL OTHER FIRE/LIFE SAFETY EQUIPMENT SHALL BE LEFT IN PLACE. IF A STRUCTURE HOLDING A DEVICE IS REMOVED, THE CONTRACTOR SHALL SUPPORT THE FIRE/LIFE SAFETY DEVICE IN A MANNER THAT DOES NOT IMPAIR ITS FUNCTION IN ANYWAY.19 REMOVE ALL DATA/TELE CABLING IN CEILING BACK TO POINT OF ORIGINATION. (UNLESS OTHERWISE INSTRUCTED) CONTRACTOR TO VERIFY WITH OWNER'S CABLING VENDOR.20 ABANDONED PLUMBING LINES AND DRAINS TO BE REMOVED BACK TO POINT OF ORIGINATION AS REQUIRED FOR NEW WORK.21 MAINTAIN FULLY CHARGED FIRE EXTINGUISHERS READILY AVAILABLE DURING ALL DEMOLITION OPERATIONS02 41 00 DEMOLITION CONTINUED2 THE GENERAL CONTRACTOR SHALL PROVIDE AND INSTALL DOORS AS SPECIFIED ON SHLEMMER ALGAZE ASSOCIATES DRAWINGS UNLESS OTHERWISE NOTED. 3 DETAILED DOOR SCHEDULES SHALL BE SUBMITTED TO SHLEMMER ALGAZE ASSOCIATES FOR REVIEW, AND FABRICATION OF DOORS AND FRAMES SHALL NOT BE COMMENCED UNTIL SUCH REVIEW HAS BEEN RETURNED.4 THE BOTTOM 10" OF ALL DOORS (EXCEPT SLIDING AND AUTOMATIC) SHALL HAVE A SMOOTH UNINTERRUPTED SURFACE TO ALLOW THE DOOR TO BE OPENED BY A WHEELCHAIR FOOTREST WITHOUT CREATING A TRAP OR HAZARDOUS CONDITION. WHERE NARROW FRAME DOORS ARE USED, A 10” HIGH SMOOTH PANEL SHALL BE INSTALLED ON THE PUSH SIDE OF THE DOOR, WHICH WILL ALLOW THE DOOR TO BE OPENED BY A WHEELCHAIR FOOTREST WITHOUT CREATING A TRAP OR HAZARDOUS CONDITION. 5 ALL REQUIRED EXIT DOORWAYS SHALL HAVE A MINIMUM 32" CLEAR OPENING WITH THE DOOR AT 90 DEGREES TO THE CLOSED POSITION. DOORWAYS SHALL BE NOT LESS THAN 36" IN WIDTH AND NOT LESS THAN 6'-8" IN HEIGHT. (CBC 2022 1010.1.1)6 ONE OF A PAIR OF DOORS SHALL MEET THE MINIMUM OPENING WIDTH REQUIREMENTS. 7 LANDINGS OR FLOOR LEVEL AT DOORS SHALL NOT BE MORE THAN 1/2-INCH BELOW THE THRESHOLD. RAISED THRESHOLDS AND FLOOR LEVEL CHANGES GREATER THAN 1/4-INCH AT DOORWAYS SHALL BE BEVELED WITH A SLOPE NOT GREATER THAN ONE UNIT VERTICAL IN TWO UNITS HORIZONTAL. (CBC 2022 11B-404.2.5)8 SEE SHEET A-2.0 FOR REQUIREMENTS OF DOORS, WINDOWS, AND HARDWARE, I.E. DOOR SCHEDULE, HARDWARE SCHEDULE AND DOOR AND WINDOW DETAILS. 9 TYPICAL DOOR/FRAME CONVENTIONS ARE AS FOLLOWS: a) DIMENSIONS TO EDGE OF DOOR LOCATING DOOR OPENINGS ARE TO INSIDE FACE OF JAMB, UNLESS OTHERWISE NOTED. b) DOOR OPENINGS ARE TO BE LOCATED SO THAT INSIDE FACE OF BUTT SIDE JAMB IS 4" FROM FACE OF PERPENDICULAR WALL AT CORNER, ALLOWING FOR A 90 DEGREE SWING TYPICAL, UNLESS OTHERWISE NOTED. c) SEE SHEET A-10.0 FOR SPECIFIC DOOR REQUIREMENTS. 10 UNDERCUT BUILDING STANDARD INTERIOR DOORS AS REQUIRED TO CLEAR FINISHED FLOOR BY 1/4". ALL RATED DOORS SHALL BE ORDERED SO AS TO CLEAR THE FINISHED FLOOR BY 1/4", UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL UNDERCUT ALL NEW AND EXISTING DOORS AS REQUIRED TO ACCOMMODATE ALL FLOOR COVERINGS. VERIFY EXACT THICKNESS OF ALL NEW FLOOR COVERING WITH SHLEMMER ALGAZE ASSOCIATES PRIOR TO UNDERCUTTING OF DOORS.11 ANY GLAZING ON OR WITHIN 24" OF A DOOR SHALL BE TEMPERED. 12 ALL HOLLOW METAL DOORS SHALL BE PROVIDED WITH STEEL FRAMES.13 EXIT DOORS SHALL SWING IN THE DIRECTION OF EXIT TRAVEL WHEN SERVING ANY HAZARDOUS AREA, ELECTRICAL ROOMS WITH 800A EQUIPMENT, OR WHEN SERVING AN OCCUPANT LOAD OF 50 OR MORE.14 EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT. (2022 CBC 1010.2).A. EXCEPTION: THIS REQUIREMENT SHALL NOT APPLY TO EXTERIOR EXIT DOORS IN A GROUP "B" OCCUPANCY IF THERE IS A VISIBLE, DURABLE SIGN ON OR ADJACENT TO THE DOOR STATING "THIS DOOR TO REMAIN UNLOCKED DURING BUSINESS HOURS". THE LETTERS SHALL BE NOT LESS THAN 1 INCH HIGH ON A CONTRASTING BACKGROUND. THE LOCKING DEVICE MUST BE A TYPE THAT WILL BE READILY DISTINGUISHABLE AS LOCKED.08 71 00 - DOOR HARDWARE1 DETAILED HARDWARE SCHEDULES SHALL BE SUBMITTED TO SHLEMMER ALGAZE ASSOCIATES FOR REVIEW. HARDWARE ORDER SHALL NOT COMMENCE UNTIL SUCH REVIEW HAS BEEN RETURNED AND ACCEPTED OR ACCEPTED WITH MARKINGS.2 ALL LOCK SETS SHALL BE CODED AND/OR KEYED IN ACCORDANCE WITH THE BUILDING STANDARD REQUIREMENTS. CODES AND/OR KEYS ARE TO BE DELIVERED TO OWNER PROPERLY TESTED AND/OR TAGGED. THE NUMBER OF MASTER AND PASS KEYS SHALL BE COORDINATED WITH OWNER. BUILDING MASTER KEYS SHALL BE MARKED “DO NOT DUPLICATE”.3 MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED 5 POUNDS FOR EXTERIOR DOORS AND 5 POUNDS FOR INTERIOR DOORS, SUCH PULL/PUSH EFFORT BEING APPLIED AT RIGHT ANGLES TO HINGED DOORS AND AT THE CENTER PLANE OF THE SLIDING OR FOLDING DOORS. COMPENSATING DEVICES OR AUTOMATIC DOOR OPERATORS MAY BE UTILIZED TO MEET THE ABOVE STANDARD. WHEN FIRE DOORS ARE REQUIRED, THE MAXIMUM EFFORT TO OPERATE THE DOOR MAY BE INCREASED TO THE MINIMUM ALLOWABLE BY THE APPROPRIATE AUTHORITY HAVING JURISDICTION, BUT IN ALL CASES SHALL NOT EXCEED 15 POUNDS. 4 LATCHING AND LOCKING DOORS THAT ARE HAND ACTIVATED AND WHICH ARE IN THE PATH OF TRAVEL SHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER TYPE HARDWARE, PANIC BARS, PUSH- PULL ACTIVATING BARS, OR BARS OR OTHER HARDWARE DESIGNED TO PROVIDE PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP OR PINCH THE OPENING HARDWARE. 5 ALL MANUALLY OPERATED EDGE OR SURFACE-MOUNTED FLUSH BOLTS ARE PROHIBITED ON EXIT DOORS. WHEN EXIT DOORS ARE USED IN PAIRS AND APPROVED AUTOMATIC FLUSH BOLTS ARE USED, THE DOOR LEAF HAVING THE AUTOMATIC FLUSH BOLTS SHALL HAVE NO DOOR KNOB OR SURFACE-MOUNTED HARDWARE. THE UNLATCHING OF ANY LEAF SHALL NOT REQUIRE MORE THAN ONE OPERATION.6 ALL EXIT DOOR HARDWARE SHALL BE OF AN APPROVED TYPE AND TESTED IN ACCORDANCE WITH ADA.7 ALL THRESHOLDS SHALL NOT EXCEED 1/2" CHANGE IN ELEVATION WITH A 1:2 BEVEL. (CBC 2022 11B-303)8 PANIC HARDWARE, WHEN INSTALLED, SHALL COMPLY WITH ALL APPLICABLE BUILDING CODE REQUIREMENTS. THE ACTIVATING MEMBER SHALL BE MOUNTED AT A HEIGHT OF NOT LESS THAN 34 INCHES NOR MORE THAN 44 INCHES ABOVE THE FLOOR. THE UNLATCHING FORCE SHALL NOT EXCEED 15 POUNDS WHEN APPLIED IN THE DIRECTION OF EXIT TRAVEL.9 ALL RATED CORRIDOR DOORS SHALL HAVE A THRESHOLD WITH A SMOKE AND DRAFT SEAL AT HEAD AND JAMBS.DATE:DRAWN:REVIEWED:PROJECT NO:SCALE:OWNERSHIP AND USE OF DOCUMENTS ALL DRAWINGS, SPECIFICATIONS AND COPIES THEREOF FURNISHED BY SAA INTERIORS ARE AND SHALL REMAIN IT'S PROPERTY. THEY ARE TO BE USED ONLY WITH RESPECT TO THIS PROJECT. FEDERAL LAW PROHIBITS THE REPRODUCTION, DISPLAY, SALE, OR OTHER DISPOSITION OF THIS DOCUMENT WITHOUT THE EXPRESS WRITTEN CONSENT OF SHLEMMER ALGAZE ASSOCIATES. COPYRIGHT © 2015 SHLEMMER ALGAZE ASSOCIATES ALL RIGHTS RESERVEDSHEET TITLE:SHEET NO:SEAL AND STAMP:CONSULTANTS:PROJECT:CULVER CITY - IRVINE - LOS ANGELES - SAN FRANCISCO -NEW JERSEY - NEW YORK6083 Bristol ParkwayCulver City, CA 9023018600 MacArthur Blvd., Suite 100 Irvine, CA 92612515 South Flower Street, Suite 1200Los Angeles, CA 90071T 310.553.3252T 949.724.8958T 213.929.1400DRAWINGS ISSUE485C US Route 1 South, Suite 105Iselin, NJ 08830T 848.200.1200711 3rd Ave., 6th FloorNew York, NY 10017T 917.512.6688www.saaia.comT 415.390.6793NOT FOR CONSTRUCTIONIF DRAWINGS AND MATERIALS DEVELOPED AND PROVIDED BY SAA INTERIORS + ARCHITECTURE AT THE TIME OF AND RELATING TO COVID-19 CONTAIN RECOMMENDATIONS FROM THE CENTER FOR DISEASE CONTROL AND PREVENTION (CDC) AND THE WORLD HEALTH ORGANIZATION (WHO), SUCH RECOMMENDATIONS ARE ONLY VALID AS OF THE DATE THE DRAWINGS AND MATERIALS ARE PRODUCED. THE CDC AND/OR WHO MAY UPDATE OR MODIFY THEIR RECOMMENDATIONS AT ANY TIME PER THEIR DISCRETION. IN USINGRECOMMENDATIONS FROM THESE DRAWINGS AND MATERIALS, THE RECIPIENTACKNOWLEDGES THAT IT WAS BASED ON THEIR OWN DECISION AND TAKE FULL RESPONSIBILITY AND LIABILITY. THE INTENDED RECIPIENT INDEMNIFIES AND DEFENDS SAA FOR ANY USE OF THESE DRAWINGS AND MATERIALS BY OTHERS. SAA’S SERVICES ARE INTENDED TO ONLY BE OF ASSISTANCE AND GUIDANCE FOR OUR CLIENT’S STRATEGIES AND DO NOT CONSTITUTE AS REQUIREMENTS OR ANY FORM OF HEALTH, ILLNESS OR DISEASE ADVICE. SAA MAKES NO REPRESENTATIONS OR WARRANTIES REGARDING THE ACCURACY OR COMPLETENESS OF THE DRAWINGS AND MATERIALS. ANY RECOMMENDATIONS OR USE OF ANY CDC OR WHO INFORMATION DOES NOT CONSTITUTE ENDORSEMENT BY THE U.S. GOVERNMENT, DEPARTMENT OF HEALTH AND HUMAN SERVICES OR THE CDC AND WHO NOR ITS AFFILIATES.575 Market Street, #502San Francisco, CA 94105A-0.204/10/24AWJN/MP634495GENERAL NOTESSUITE 850 & 860DEMISING WALL6 E HUTTON CENTREDRIVESANTA ANA, CA 92707DATE DESCRIPTION DELTA05/17/24 ISSUE FOR PLANNING05/20/24 ISSUE FOR PLAN CHECKNELSONALGAZENo. C-21090REN. 03/31/2025L,CENSE' ARC+,7EC7S7A7E O) CAL,)ORN,A6 E Hutton Center Dr # 850 &860 - 101119469-707/24/2024
|