My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3117 S Pacific Ave - Plan
PBA
>
Building
>
ProjectDox
>
P
>
Pacific Ave
>
3117 S Pacific Ave
>
3117 S Pacific Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2025 12:44:25 PM
Creation date
6/15/2025 12:43:53 PM
Metadata
Fields
Template:
Plan
Permit Number
20185429
101122953
Full Address
3117 S Pacific Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />■am MECHANICAL LOAD TEST 27 <br />M - �. <br />■■ i JYSTEM CEkTIFIIlAi1ON I PAGE <br />The NXT UMOUNT system has been certified and listed to the UL 2703 standard (Rack Mounting Systems and Clamping Devices for Flat -Plate Photovoltaic Modules <br />and Panels). This standard included electrical grounding, electrical bonding, mechanical load and fire resistance testing. <br />SYSTEM LEVEL FIRE CLASSIFICATION <br />The system fire class rating requires installation in the manner specified in the NXT UMOUNT Installation Guide. NXT UMOUNT has been classified to the system level <br />fire onion of UL 2703. NXT UMOUNT has achieved system level performance for steep sloped roofs and low sloped roofs.5 stem level fire performance is inherent <br />P Y Pe P P P Y <br />in the NXT UMOUNT design, and no additional mitigation measures are required. See table below for definition of steep sloped and low sloped roofs.The system is to <br />be mounted over fire resistant roof covering rated for the application. There is no required minimum or maximum height limitation above the roof deck to maintain <br />the system fire rating for NXT UMOUNT.Approved Module Types & System Level Fire Ratings are listed below: <br />Roof Type <br />Module Type <br />System Level Fire Rating <br />Rail Direction <br />Module Orientation <br />Steep Slope - roof pitches 3 2 in/ft <br />Type 1, 2, 3 with metal frame, 10 with <br />metalframe, 19,22,25,29,&30 <br />Class <br />[parallel OR Perpendicular to Ridge <br />Landscape OR Portrait <br />Low Slope - roof pitches < 2in/ft <br />Type 1, 2, 29, & 30 <br />MECHANICAL LOAD TEST MODULES <br />The modules selected for UL 2703 mechanical load testing were selected to represent the broadest range possible for modules on the market. The tests performed <br />covers module frame thicknesses greater than or equal to 1.0 mm, single and double wall frame profiles (some complex frame profiles could require further analysis to <br />determine applicability), and clear and dark anodized aluminum frames. PV modules may have a reduced load rating, independent of the NXT UMOUNT rating. Please <br />consult the PV module manufacturer's installation guide for more information. <br />Tested Module <br />Design Load Ratings <br />Tested loads <br />Tested Module Area <br />SunPowerSPR-A440-COM <br />Down: 50 psf, Up: 50 psf, Slope: 15 psf <br />Down: 75 psf, Up: 75 psf, Slope: 23 psf <br />21.86sgIt <br />Jinko JKM-xxxM 72HL4-V <br />Down: 39.47 psf, Up: 22.28 psf, Slope: 8 psf <br />Down: 59.20 psf, Up: 33.42 psf, Slope:12 psf <br />27.76 sq ft <br />Q Cells 0 Peak Duo XL-Gll.3/BFG <br />Down: 37.06 psf, Up: 20.97 psf, Slope: 7.53 psf <br />Down: 55.60 psf, Up: 31.46 psf, Slope:11.3 psf <br />29.49 sq ft <br />QPEAK.DUO XL-G11S.3/BFG580 <br />Down: 36.50 psf, Up:20.96 psf, Slope:7.6 psf <br />Down: 54.80 psf, Up:31.45 psf, Slope:11.4 psf <br />30.05 sq ft <br />■�� COMBO CLAMP INSTALLATION; 24 <br />■■ U__M_0_U_N_T --------------------------------- INSTALLATION GUI[ ; PAGE <br />0% <br />r i <br />INSTALLCOMBO (END) CLAMPS: <br />Install Combo Clamps starting at the aligned end of <br />rails. <br />INSTALLCOMBO (MID) CLAMPS: <br />Clamp assemblies may be positioned in rail near <br />point of use prior to module placement. <br />Note: The clamps may be installed above splice <br />locations. <br />PRO TIP <br />Press the clamp assembly slightly into the rail to <br />allow for easy sliding of clamp in the rail. <br />OV 7 <br />INSERT COMBO CLAMP: <br />Insert Combo Clamp from one side of <br />the rail nut into the rail and click in <br />the other side. Ensure that the raft nut <br />profile is seated in the rail profile. <br />PLACE ADJACENT MODULE AGAINST <br />CLAMPS: <br />Modules must be tight against clamps <br />with no gaps. Tighten bolt to required <br />torque. <br />TORQUE VALUE:15 ft-lbs <br />INSTALL END MODULE: Position first module onto rails <br />and engage module frame with end clamps. Hold clamp <br />in place against module while tightening bolt. <br />TORQUE VALUE: 15 ft-lbs. <br />Note: Ensure a minimum distance of 1" from the end of <br />the module to end of rail. <br />INSTALL REMAINING MODULES: <br />Proceed with module installation. Engage each clamp <br />with previously positioned module. <br />Note: Combo clamps are capable of securing module <br />frames whose thickness varies from 30mm to 40mm. <br />■M SYSTEM GROUNDING <br />M <br />■■ ------l <br />--------------------------------------------------------NT-------------------------------------------INSTAIEATIUN ------------------GUIDE---------L PAGE <br />--------- <br />SYSTEM GROUNDING: Rails can be bonded using a MLPE & GROUNDING LUG <br />(NULGMLP1), GROUND WEEBLUG k1 or ILSCO LAY IN LUG (GBL4DBT).At least <br />one rail per row of modules in an array must be bonded to electrical ground. <br />Each additional row of modules must be grounded with at least one rail lug <br />per row or with a row -to -row bonding devise listed here. <br />Note: See Page 5 for additional lugs required for expansion joints. <br />SYSTEM GROUNDING WITH MLPE & GROUNDING LUG: Insert the T-nut in the <br />rail by holding the plastic cone's tabs with thumb and middle finger. Rotate the <br />clamp 90 deg in clockwise direction in the rail and release when aligned with <br />rail Ensure that the T-nut is engaged in the rail profile. Place the grounding wire <br />on the grounding plate on one of the sides of the bolt, parallel to the grounding <br />plate flanges.Tighten bott. <br />TORQUE VALUE: 6-12 AWG SOLID COPPER: 10 ft tbs <br />NOTE: MLPE & GROUNDING LUG is single use only <br />O *ee <br />ALTERNATE SYSTEM GROUNDING WITH ILSCO LAY -IN LUG - UNIRAC P/N <br />00800913: Alternate Grounding Lug. Drill hole in rail 7/32• in diameter, deburr <br />hole and bolt through one wall of rail. <br />BOLT TOROUE VALUE: 5 ft lbs. ALTERNATE ROW GROUNDING WITH ALTERNATE ROW GROUNDING WITH N/S <br />TERMINALTORQUE:4-6 AWG: 35in-lbs, 8 AWG: 25 in-tbs. N/S BONDING CLAMP: BONDING CLIP: <br />Insert clamp between module rows and Fully seat bonding clip on each module <br />IL WARNW§ tighten bolt. Range to provide bond across N/S <br />module gap. <br />Ensure Copper does contact Aluminum to avoid corrosion. TORQUE VALUE: 20 ft-lbs. <br />NMI ° BONDING CONNECTIONS & GROUNDING PATHS ■ <br />mom:U__M_0_U_N_T■■ INSTALLATION -GUIDE-:- PAGE <br />�M0o <br />0 <br />NXT .. <br />t <br />BONDING COMBO MID -END CLAMPASSEMBLY <br />© Aluminum combo mid -end clamp cap with stainless steel bonding pins that pierce <br />module frame anodization to bond module to module through clamp <br />© Stainless steel bolt bonds aluminum clamp to stainless steel Hex bolt <br />Q Aluminum combo mid -end clamp rail nut with stainless steel bonding pins that <br />pierce rail anodization to bond module to module through clamp <br />NOTE: See Page 20 for installation details. <br />MODULE <br />FRAME <br />1 <br />Z,® L <br />BONDING BETWEEN THERMAL BREAKS <br />O Lug is connected at the end of each thermal break <br />to the rail. <br />© Solid copper wire is connected across the gap to <br />bond the two ends. <br />NOTE: See Page 5 for installation details. <br />BONDING RAIL SPLICE <br />Q Bonding Hardware creates bond between Splice bar and <br />each rail section. <br />© Aluminum splice bar spans across rail gap to create rail <br />to rail bond. Rail on at least one side of splice will be <br />grounded. <br />NOTE: <br />• See Page 16 for installation details <br />• Splice certified for single -use only <br />Coote�' © N,�ItP� <br />wigF'xR <br />RACK SYSTEM GROUNDING <br />O Tabs on the grounding plate pierce anodization on the rail to bond rail to ground wire. <br />I© Solid copper wire connected to lug is routed to provide final system ground connection. <br />NOTE: See Page 17 for installation details and alternate racking system grounding P. <br />Planning and Building Agen <br />CMII=0WE:R <br />EMPQR�'�rRT94OLAR <br />FOR PORWIMSMANCI <br />CLOVIS, CA 93611 <br />TEL: (800) 306 6953 <br />CSLB:1057693 <br />Email: permits@mpwrsolar.com <br />Ma ter ID: <br />10 #1057693 <br />Scott Forster <br />VERSION <br />DESCRIPTION DATE REV <br />INITIAL RELEASE 1 03-07-2025 UR <br />PROJECT NAME <br />Z <br />O <br />0 <br />0 <br />U)w <br />Q <br />wiz <br />w Q p O LL 00 <br />U) U cal - in <br />W �QULLIN <br />Z Q U Z <br />Qom` z <br />Q Q = ❑ <br />J Q <br />Q ~ <br />Z O <br />Q <br />H <br />J_ <br />SHEET NAME <br />SPEC SHEETS <br />SHEET SIZE <br />ANSI B <br />11" X 17" <br />SHEET NUMBER <br />PV-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.