Laserfiche WebLink
CITY OF SANTA ANA <br />PI nning and BUilding Agen <br />EMPOWER <br />Descriptive Report <br />CSA <br />EMPUPCRYRAOLAR <br />M FOR <br />CIP GROUP <br />PERMPI-SSUANC1 <br />CLOVIS, CA 93611 <br />TEL: (800) 306 6953 <br />CSLB:1057693 <br />Ma <br />Email: permits@mpwrsolar.com <br />3ter ID: <br />e: <br />4 2(4 <br />MASTER CONTRACT: 0000266909 Da <br />REPORT: 70131735 <br />1q, <br />PROJECT: 80219678 <br />C-10 #1057693 <br />Scott Forster <br />Edition <br />Issued On <br />Project <br />Location <br />Prepared By <br />Authorized By <br />Edition 1 <br />September 20, 2017 <br />70131735 <br />Irvine <br />Michael Hoffnagle <br />Michael Hoffnagle <br />Edition 31 <br />March 26, 2024 <br />80198760 <br />USA Irvine <br />Michael Hoffnagle <br />Michael Hoffnagle <br />Edition 32 <br />July 10, 2024 <br />80215255 <br />USA Irvine <br />Michael Hoffnagle <br />Michael Hoffnagle <br />Edition 33 <br />August 08, 2024 <br />80219156 <br />USA Irvine <br />Joseph Garcia <br />Joseph Garcia <br />Edition 34 <br />September 20, 2024 <br />80223361 <br />USA Irvine <br />Joseph Garcia <br />Joseph Garcia <br />Edition 35 <br />October 03, 2024 <br />80219678 <br />USA Irvine <br />Michael Hoffnagle <br />Michael Hoffnagle <br />Certificate of Compliance + Supplement - Page 1 to 15 <br />Description and Tests - Page 1 to 53 <br />Attl Installation Manual SM— Pages 1 to 51 <br />Att2 Schematics SM/ULA— Pages 1 to 134 <br />Att3 Installation Manual ULA— Pages 1 to 29 <br />Att4 RM5 Installation Guide - 1 to 23 <br />Att5 RMDT Installation Guide - 1 to 24 <br />Att6 RM series schematics —1 to 40 <br />Att7 GFT Installation Guide — Pages 1 to 42 <br />Att8 GFT HD Rail Installation - Pages 1 <br />Att9 GFT Schematics — Pages 1 to 69 <br />Att10 NXT UMOUNT Installation Manual — Pages 1 to 40 <br />Attl 1 Schematics NXT UMOUNT — Pages 1 to 147 <br />Attl2 SM Ascender 2P Elevated Installation Manual — Pages 1 to 37 <br />Attl3 SM Ascender 2P NON Elevated Installation Manual — Pages 1 to 36 <br />Attl4 SM Ascender 1P Non Elevated Installation Manual — Pages 1 to 33 <br />Attl5 SM Ascender 1 P Elevated Installation Manual —Pages 1 to 36 <br />Att16 Schematics SM Ascender — Pages 1 to 52 <br />Attl7 SM Ascender Flush Mount Installation Manual — Pages 1 to 28 <br />Attl 8 S-5 schematics and installation — Pages 1 to 19 <br />Attl9 SM_NXT _Tilt Leg Install Addendum — Pages 1 to 13 <br />Att20 GridFlex 10 Schematics — Pages 1 to 40 <br />Att21 GridFlex 10 Installation Manual — Pages 1 to 30 <br />This report shall not be reproduced, except in full, without the approval of CSA Group. <br />Irvine 34 Bunsen, Irvine, CA 92618 <br />Telephone: 949-733-4300 Fax: 949-733-4320 <br />VERSION <br />DESCRIPTION I DATE I REV <br />I INITIAL RELEASE 1 03-07-2025 I UR <br />PROJECT NAME <br />z <br />0 <br />CO <br />0 <br />Q LLI <br />U)Q <br />w D z <br />ry <br />IZQp0 LL 00 <br />U) LO <br />W Q U L J J CD <br />z d U z <br />w Q0� <br />QQ 2 a_ <br />Q I­-Q <br />� D <br />`o z 0 <br />Q <br />J <br />I— <br />D <br />SHEET NAME <br />SPEC SHEETS <br />SHEET SIZE <br />ANSI B <br />11" X 17" <br />SHEET NUMBER <br />QD-1399 Rev 2024-03-27 © 2024 CSA Group. All rights reserved. <br />PV-17 <br />