My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010 W Alco Ave Unit #2 - Plan
PBA
>
Building
>
ProjectDox
>
A
>
Alco Ave
>
2010 W Alco Ave Unit# 2
>
2010 W Alco Ave Unit #2 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2025 12:44:31 PM
Creation date
6/15/2025 12:44:01 PM
Metadata
Fields
Template:
Plan
Permit Number
101121972
Full Address
2010 W Alco Ave Unit# 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 6 <br /> <br /> <br />For the proposed new exterior concrete slabs including new driveway the over- <br />excavation and recompaction should be minimum 1 ft deep and 1 ft. outside of the new <br />slab areas. <br /> <br />After removal of the recommended 3 ft. deep soils, the exposed bottom of the <br />removal area, especially the previous swimming pool backfill soils must be <br />evaluated. If needed, additional / deeper removal must be performed. This will be <br />evaluated and determined by the geotechnical engineer based on the conditions to be <br />exposed during the excavation. <br /> <br />In addition, if concrete chunks / pieces (which may have previously left in place during <br />the previous backfilling of the previous swimming pool) would be noticed, they must be <br />completely removed and discarded of offsite (and replaced with new clean soils which <br />must be properly compacted). Additional excavation down to the bottom of the <br />previous swimming pool may be needed for this evaluation. Again, this will be <br />determined by the geotechnical engineer of record during the excavation based on the <br />conditions to be exposed during the excavation. <br /> <br />The fill/backfill materials should be free of organic matter and oversized materials, 4 <br />inches or greater in diameter, placed in near-horizontal loose lifts not to exceed eight <br />inches in thickness, and moisture conditioned to slightly over optimum moisture content <br />prior to compaction. <br /> <br />Imported soils, if any, should have a very low expansion potential and should be <br />geotechnically observed/tested and accepted by the geotechnical consultant prior to using <br />at the site. <br /> <br />In general, grading at the site, if any, should be performed in accordance with the <br />requirements of the City and under the geotechnical observation and testing of the project <br />geotechnical consultant. The compaction criterion for fill and backfill materials is a <br />minimum of 90% of the maximum density determined in accordance with ASTM Test <br />Method D1557. <br /> <br />Temporary Excavations <br /> <br />In general, temporary excavations should be performed in accordance with OSHA <br />requirements. In general, care should be taken during excavation near an existing <br />structural object, if any to ensure no damage is done to the existing object. <br /> <br />For this project, the proposed detached ADU will be located far away from the existing <br />building. Therefore, impact of the proposed temporary excavation to the existing building <br />is not anticipated. <br /> <br />BUILDING FOUNDATION DESIGN GUIDELINES <br /> <br />2010 W Alco Ave Unit <br />#24/22/2025
The URL can be used to link to this page
Your browser does not support the video tag.