My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010 W Alco Ave Unit #2 - Plan
PBA
>
Building
>
ProjectDox
>
A
>
Alco Ave
>
2010 W Alco Ave Unit# 2
>
2010 W Alco Ave Unit #2 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2025 12:44:31 PM
Creation date
6/15/2025 12:44:01 PM
Metadata
Fields
Template:
Plan
Permit Number
101121972
Full Address
2010 W Alco Ave Unit# 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 9 <br /> <br />appropriate curing precautions during the pouring of concrete in hot weather to reduce <br />cracking of slabs. <br /> <br />A slip sheet (or equivalent) can be utilized if grouted tile, marble tile, or other crack- <br />sensitive floor covering is planned directly on concrete slabs. <br /> <br />New Driveway <br /> <br />The minimum section required by the City can be used for a new driveway, if any. If <br />there is no minimum requirements by the City, a 5-inch thick concrete slab (PCC), <br />reinforced with #4 rebar (placed at mid-height of slabs) at 18 inches on-centers both <br />ways, or 5-in. thick asphalt concrete (AC), or equivalent, over a 6-inch thick layer of <br />aggregate base (AB) can be used. The aggregate base and subgrade should be properly <br />compacted to a minimum of 95% and 90%, respectively, of the maximum density <br />determined in accordance with ASTM D1557 prior to placement of the concrete slab. <br />Spraying the compacted subgrade soils with water should be performed prior to concrete <br />pour. <br /> <br />If pavers are to be used, they must be properly designed by the civil engineer of record <br />for this project and approved by the city prior to construction. Additional geotechnical <br />data can be provided for design, if requested. <br /> <br />Site Drainage <br /> <br />In general, proper surface drainage should be checked, improved as needed, and <br />maintained to ensure surface water flows away from all structures. Requirements by the <br />city and applicable CBC (2022 CBC) should also be followed. <br /> <br />Roof gutters should be properly provided. Roof drains, gutters and downspouts should be <br />maintained to function as intended. Outlet drains should be kept open. <br /> <br />Irrigation at the site, if any, should be kept to a minimum required to support plant life. <br /> <br />In the future, sources of uncontrolled water, such as leaky sewer, water (domestic, <br />irrigation) or drainpipe, should be repaired if identified. <br /> <br />Seismic Design <br /> <br />We recommend the proposed new structure be structurally designed to meet the <br />applicable building codes and requirements of the controlling governmental agencies. <br />The seismic parameters provided in the “Seismicity” section of this report can be used. <br />The civil/structural design engineer should consult with the project geotechnical <br />consultant, if additional geotechnical information is needed for the seismic design. <br /> <br />2010 W Alco Ave Unit <br />#24/22/2025
The URL can be used to link to this page
Your browser does not support the video tag.