My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010 W Alco Ave Unit #2 - Plan
PBA
>
Building
>
ProjectDox
>
A
>
Alco Ave
>
2010 W Alco Ave Unit# 2
>
2010 W Alco Ave Unit #2 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2025 12:44:31 PM
Creation date
6/15/2025 12:44:01 PM
Metadata
Fields
Template:
Plan
Permit Number
101121972
Full Address
2010 W Alco Ave Unit# 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 10 <br /> <br /> <br />Cement Type For Concrete in Contact with On-Site Earth Materials <br /> <br />Our previous tests performed on the soils of many lots in the City of Santa Ana which are <br />similar to the on-site soils show negligible water-soluble sulfate contents. Sulfate attack <br />on concrete was not observed for the existing on-site house and other houses in the <br />surrounding areas. It appears sulfate attack on concrete is not considered to be a problem <br />for this project. However, for conservative purpose, Type V cement with a maximum <br />water/cement ratio of 0.45 and a minimum concrete strength, f'c of 4,500 psi is <br />recommended to be used for concrete in contact with the on-site soils. Additional water- <br />soluble sulfate content testing can be performed for the soils at the site, as needed. The <br />test can be conducted during and/or after completion of site preparation/grading. <br /> <br />The applicable California Building Code (2022 CBC) and other requirements by <br />controlling governmental agencies should be followed. <br /> <br />Corrosion To Ferrous Metals and Copper <br /> <br />For conservative purposes, the on-site soils can be considered severely corrosive to <br />ferrous metals and copper. Underground/buried ferrous metals or copper are not planned <br />to be used for this project. However, if underground/buried ferrous metals or copper are <br />planned to be used at the site, they should be properly protected. A corrosion specialist <br />can be consulted. Testing can be performed for verification of the potential corrosion of <br />the soils at the site to ferrous metals and copper, if needed. The test can be performed <br />during and/or after completion of grading. <br /> <br />Geotechnical Review of Grading and Foundation Plans <br /> <br />Based on the City’s requirements, the project geotechnical consultant should review, <br />“approve” and sign the project grading and foundation plans with details/specifications, if <br />any, indicating conformation to applicable geotechnical recommendations. <br /> <br />We will corporate with the civil/structural design engineers who prepare the plans to <br />ensure our geotechnical recommendations are properly incorporated into the plans. <br /> <br />Geotechnical Observation and Testing During Construction <br /> <br />We recommend that a qualified geotechnical consultant be retained to provide <br />geotechnical engineering services, including geotechnical observation/testing, during the <br />construction phase of the project. This is to verify the compliance with the design, <br />specifications and/or recommendations, and to allow design changes in the event that <br />subsurface conditions differ from those anticipated. <br /> <br />Geotechnical observation/testing can be performed at the following stages: <br /> <br />2010 W Alco Ave Unit <br />#24/22/2025
The URL can be used to link to this page
Your browser does not support the video tag.