Laserfiche WebLink
Page 11 <br /> <br /> During ANY grading operations, including excavation, removal, filling and <br />backfilling, etc. <br /> During and after excavation for footings to verify the adequacy of underlying <br />materials. <br /> After pre-saturation of slab subgrade earth materials, if any, prior to pouring <br />concrete. <br /> After compaction of subgrade soils and/or aggregate base for exterior slabs and or <br />driveway, if any. <br /> During backfill of drainage and utility line trenches, if any, to verify proper <br />compaction. <br /> When/If any unusual geotechnical conditions are encountered. <br /> <br />Note: If Geotechnical International is not provided the opportunity to perform the <br />geotechnical observation/testing during the construction phase, Geotechnical <br />International will take no responsibility for the conclusions and recommendations <br />contained in our report in the event that subsurface conditions differ from those <br />interpreted and anticipated during our preliminary investigation phase prior to the start of <br />construction. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />2010 W Alco Ave Unit <br />#24/22/2025