Laserfiche WebLink
By: J.R. <br />Date: 10/7/24 <br />Rooftop Solar Panels Wind Pressures (Section 29.4, ASCE 7‐16) <br />Vult =100 mph Kzt =1.00 (sec 26.8.2)h = 15 ft <br />Exposure Category = C Kz = 0.85 (sec 26.10.1) <br />Roof Zone = 2 Kd =0.85 (sec 26.6) <br />Roof θ = 7‐27 deg Ke =1.00 (sec 26.9) <br />qh = 0.00256 Kz Kzt Kd Ke V2 qh =18.50 (eq. 26.10‐1) <br />GPp =‐2 uplift γE =1.5 (sec 29.4.4) <br />γa =0.78 (fig 29.4‐8) <br />γE =1.5 FIG 29.4‐7)γc =0.94 (fig 29.4‐7)hpt =0 <br />γa =0.78 (fig 29.4‐8)γp =0.9 (fig 29.4‐7)ω =0.00 deg (panel tilt) <br />GPp =‐2 uplift GCrm =1.4 uplift <br />p = qh (GPp) γE γa (eq 29.4‐7)p = qh (GCrn) γE γC γp (eq 29.4‐6) <br />p =‐43.2 p.s.f.p =32.8 p.s.f. <br />Check Anchorage to Existing Structur <br />0.6DL ‐ 0.6W controlling load combination (eq. 16‐15 for ASD) <br />DL = 2.9 p.s.f.dead load of panel (including rack system) <br />W = 43.2 p.s.f.wind load normal to face of panel <br />Arealag =11.3 sq. ft.area tributary to each anchor <br />SPanc =4.00 ft.spacing of anchors <br />Puplift = Arealag (0.6DL - 0.6W) =273.6 lbs.total uplift on anchor <br />Material = DFL lumber anchor material <br />Dialag =5/16 in.diameter of screw <br />Penlag = 2.5 in.min. penetration to existing framing <br />W lag =266 lb/in.withdrawal load per in. of penetration per NDS Table 11.2A <br />CD = 1.6 load duration factor for wind per NDS Table 2.3.2 <br />Ct = 0.8 temperature factor per NDS Table 2.3.3 <br />Noscrews =1 number of screws in withdrawal <br />Pallow = Penlag (Wlag CD Ct) * Noscrews =851.2 lbs.total allowable withdrawal on anchor <br />Puplift <br />Pallow <br />Anchorage =USE (1) 5/16IN. DIA. LAG SCREW(S) AT 4FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Wind Uplift Anchorage <br />Flush Mounted Panels ‐ ASCE Section  <br />29.4.4 (where applicable) <br />Flat Roof Panels ‐ ASCE Section 29.4.3  <br />(where applicable) <br />=0.32 < 1.00 Anchor is OK! <br />10/7/2024  10:20 AM <br />6 of 7 <br />©McPherson Engineering <br />1902 W Monica Ln <br />12/2/2024