Laserfiche WebLink
By: J.R. <br />Date: 10/7/24 <br />Gravity Loads: <br />DEMAND DECREASED BY 10.65% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 4.97% < 10% = OK! <br />Anchorage: <br />DEMAND OF 273.6LB. < CAPACITY OF 851.2LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 4FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRA <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />10/7/2024  10:20 AM <br />7 of 7 <br />©McPherson Engineering <br />1902 W Monica Ln <br />12/2/2024