Laserfiche WebLink
NO:DATE:DESCRIPTION: <br />JOB NO: <br />DATE ISSUED: <br />DRAWN BY: <br />CHECK BY: <br />SHEET NO: <br />PROJECT TITLE <br />OWNER/ APPLICANT: <br />CONSULTANT: <br />PROFESSIONAL SEAL: <br />K: <br />\ <br />P <br />R <br />O <br />J <br />E <br />C <br />T <br />S <br />\ <br />5 <br />0 <br />3 <br />. <br />0 <br />2 <br />7 <br /> <br />L <br />A <br />K <br />E <br /> <br />C <br />E <br />N <br />T <br />E <br />R <br /> <br />I <br />N <br />D <br />U <br />S <br />T <br />R <br />I <br />A <br />L <br /> <br />C <br />O <br />M <br />P <br />L <br />E <br />X <br />\ <br />C <br />A <br />D <br />\ <br />S <br />H <br />E <br />E <br />T <br />S <br />\ <br />B <br />U <br />I <br />L <br />D <br />I <br />N <br />G <br /> <br />1 <br /> <br />R <br />O <br />U <br />G <br />H <br /> <br />G <br />R <br />A <br />D <br />E <br />\ <br />C <br />- <br />1 <br />. <br />1 <br /> <br />T <br />I <br />T <br />L <br />E <br /> <br />S <br />H <br />E <br />E <br />T <br /> <br />A <br />N <br />D <br /> <br />G <br />E <br />N <br />E <br />R <br />A <br />L <br /> <br />N <br />O <br />T <br />E <br />S <br />. <br />D <br />W <br />G <br /> <br /> <br />10 <br />/ <br />9 <br />/ <br />2 <br />0 <br />2 <br />4 <br /> <br />4 <br />: <br />2 <br />7 <br />: <br />1 <br />5 <br /> <br />P <br />M <br />SOUTH COAST <br />TECHNOLOGY <br />CENTER <br />a California general partnership <br />3315 Fairview Road <br />Costa Mesa, California 92626 <br />C.J.Segerstrom & Sons <br />BUILDING #1 <br />3600 S. Susan Street <br />Santa Ana, California <br />APN: 414-261-01 <br />TITLE SHEET AND <br />GENERAL NOTES <br />503.027 <br />KH <br />JB <br />10/07/2024 <br />1.ALL GRADING SHALL COMPLY WITH THE LATEST CBC CHAPTERS 18 AND 33, AND APPENDIX J AND THE SANTA ANA MUNICIPAL CODE. A CITY GRADING PERMIT <br />IS REQUIRED FOR GRADING. <br />2.GRADING SHALL NOT BE STARTED WITHOUT FIRST NOTIFYING THE CITY GRADING INSPECTOR. A PRE-GRADING MEETING ON THE SITE IS REQUIRED BEFORE <br />STARTING OF GRADING WITH THE FOLLOWING PEOPLE PRESENT: GRADING CONTRACTOR, DESIGN CIVIL ENGINEER, GEOTECHNICAL ENGINEER, GRADING <br />INSPECTOR AND WHEN REQUIRED, THE ARCHAEOLOGIST AND PALEONTOLOGIST. THE REQUIRED INSPECTIONS FOR GRADING WILL BE EXPLAINED AT THIS <br />MEETING. <br />3.AN APPROVED COPY OF THE GRADING PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS. <br />4.THE DESIGN CIVIL ENGINEER SHALL BE AVAILABLE DURING THE GRADING TO VERIFY COMPLIANCE WITH THE PLANS, SPECIFICATIONS, CODE AND ANY SPECIAL <br />CONDITIONS OF THE PERMIT WITHIN HIS PURVIEW. <br />5.THE GEOTECHNICAL ENGINEER SHALL PERFORM PERIODIC INSPECTIONS AND SUBMIT A COMPLETE REPORT AND MAP UPON COMPLETION OF THE ROUGH <br />GRADING. THE COMPACTION REPORT AND APPROVAL FROM THE GEOTECHNICAL ENGINEER SHALL INDICATE THE TYPE OF FIELD TESTING PERFORMED. EACH <br />TEST SHALL BE IDENTIFIED WITH THE METHOD OF OBTAINING THE IN-PLACE DENSITY, WHETHER SAND CONE OR DRIVE RING, AND SHALL BE SO NOTED FOR <br />EACH TEST. SUFFICIENT MAXIMUM DENSITY DETERMINATIONS SHALL BE PERFORMED TO VERIFY THE ACCURACY OF THE MAXIMUM DENSITY CURVES BY THE <br />FIELD TECHNICIAN. <br />6.CUT AND FILL SLOPES SHALL BE NO STEEPER THAN 2 FOOT HORIZONTAL TO 1 FOOT VERTICAL (2:1) EXCEPT WHERE SPECIFICALLY APPROVED OTHERWISE. <br />7.FILLS SHALL BE COMPACTED THROUGHOUT TO A MINIMUM OF 90% RELATIVE DENSITY. AGGREGATE BASE FOR ASPHALTIC AREAS SHALL BE COMPACTED TO <br />MINIMUM OF 95% RELATIVE DENSITY. MAXIMUM DENSITY SHALL BE DETERMINED BY UNIFORM BUILDING CODE STANDARD NO. 70-1 OR APPROVED <br />EQUIVALENT, AND FIELD DENSITY BY UNIFORM CODE STANDARD NO. 70-2 OR APPROVED EQUIVALENT. <br />8.THE CONTRACTOR SHALL NOT CREATE ANY TRENCH OR EXCAVATION 5-FEET OR MORE WITHOUT THE NECESSARY PERMIT FROM THE STATE OF CALIFORNIA <br />DIVISION OF INDUSTRIAL SAFETY. <br />9.ALL CUT SLOPES SHALL BE INVESTIGATED BOTH DURING AND AFTER GRADING BY THE GEOTECHNICAL ENGINEER TO DETERMINE IF ANY SLOPE STABILITY <br />PROBLEM EXISTS. SHOULD EXCAVATION DISCLOSE ANY GEOLOGICAL HAZARDS OR POTENTIAL GEOLOGICAL HAZARDS, THE GEOTECHNICAL ENGINEER SHALL <br />SUBMIT A RECOMMENDED TREATMENT TO THE CITY ENGINEER FOR APPROVAL. <br />10.THE PERMITTEE IS RESPONSIBLE FOR DUST CONTROL MEASURES. WATER ACTIVE SITES AT LEAST TWICE DAILY. <br />11.THE LOCATING AND PROTECTION OF ALL EXISTING UTILITIES IS THE RESPONSIBILITY OF THE PERMITTEE/GENERAL CONTRACTOR. <br />12.GRADING OPERATIONS, INCLUDING MAINTENANCE OF EQUIPMENT, WITHIN ONE-HALF (1/2) MILE OF A STRUCTURE OF HUMAN OCCUPANCY SHALL NOT BE <br />CONDUCTED BETWEEN THE HOURS OF 8:00 P.M. AND 7:00 A.M. ON WEEKDAYS, INCLUDING SATURDAY, OR ANY TIME ON SUNDAY OR A FEDERAL HOLIDAY. (CITY <br />OF SANTA ANA MUNICIPAL CODE SECTION 18-314) <br />13.THE PERMITTEE SHALL GIVE REASONABLE NOTICE TO THE OWNER OF ADJOINING LANDS AND BUILDINGS PRIOR TO BEGINNING EXCAVATIONS, WHICH MAY <br />AFFECT THE LATERAL AND SUBJACENT SUPPORT OF THE ADJOINING PROPERTY. THE NOTICE SHALL STATE THE INTENDED DEPTH OF EXCAVATION AND WHEN <br />EXCAVATION COMMENCES. THE ADJOINING OWNER SHALL BE ALLOWED AT LEAST 30 DAYS AND REASONABLE ACCESS ON THE PERMITTED PROPERTY TO <br />PROTECT HIS STRUCTURE, IF HE SO DESIRES, UNLESS OTHERWISE PROTECTED BY LAW. <br />14.ALL EXISTING DRAINAGE COURSES THROUGH THE SITE SHALL REMAIN OPEN TO HANDLE THE STORM WATER; HOWEVER, IN ANY CASE, THE PERMITTEE SHALL <br />BE HELD LIABLE FOR ANY DAMAGE DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. <br />15.APPROVED EROSION PROTECTION DEVICES SHALL BE PROVIDED AND MAINTAINED DURING THE RAINY SEASON AND SHALL BE IN PLACE AT THE END OF EACH <br />DAY’S WORK. PROPER EROSION CONTROL MEASURES MUST BE SHOWN ON THE PLANS. <br />16.CONSTRUCTION SITES SHALL BE MAINTAINED IN SUCH A CONDITION THAT AN ANTICIPATED STORM DOES NOT CARRY WASTES OR POLLUTANTS OFF THE <br />SITES. <br />DISCHARGES OF MATERIAL OTHER THAN STORM WATER ARE ALLOWED ONLY WHEN NECESSARY FOR PERFORMANCE AND COMPLETION OF CONSTRUCTION <br />PRACTICES AND WHERE THEY DO NOT: CAUSE OR CONTRIBUTE TO A VIOLATION OF ANY WATER QUALITY STANDARD; CAUSE OR THREATEN TO CAUSE <br />POLLUTION, CONTAMINATION, OR NUISANCE; OR CONTAIN A HAZARDOUS SUBSTANCE IN A QUANTITY REPORTABLE UNDER FEDERAL REGULATIONS 40 CFR 117 <br />AND 302. <br />POTENTIAL POLLUTANTS INCLUDE BUT ARE NOT LIMITED TO: SOLID OR LIQUID CHEMICAL SPILLS; WASTES FROM PAINTS, STAINS, SEALANTS, GLUES, LIMES, <br />PESTICIDES, HERBICIDES, WOOD PRESERVATIVES AND SOLVENTS; ASBESTOS FIBERS, PAINT FLAKES OR STUCCO FRAGMENTS; FUELS, OILS, LUBRICANTS, <br />AND HYDRAULIC RADIATOR OR BATTERY FLUIDS; FERTILIZERS, VEHICLES/EQUIPMENT WASH WATER AND CONCRETE WASH WATER; CONCRETE, DETERGENT <br />OR FLOATABLE WASTES; WASTES FROM ANY ENGINE/EQUIPMENT STEAM CLEANING OR CHEMICAL DEGREASING; AND SUPERCHLORINATED POTABLE WATER <br />LINE FLUSHINGS. <br />DURING CONSTRUCTION, DISPOSAL OF SUCH MATERIALS SHOULD OCCUR IN A SPECIFIED AND CONTROLLED TEMPORARY AREA ON-SITE, PHYSICALLY <br />SEPARATED FROM POTENTIAL STORM WATER RUN-OFF, WITH ULTIMATE DISPOSAL IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REQUIREMENTS. <br />17.DEWATERING OF CONTAMINATED GROUNDWATER, OR DISCHARGING CONTAMINATED SOILS VIA SURFACE EROSION IS PROHIBITED. DEWATERING OF <br />NON-CONTAMINATED GROUNDWATER REQUIRES A NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT FROM THE RESPECTIVE STATE <br />REGIONAL WATER QUALITY CONTROL BOARD. <br />18.ALL DIRT, SAND, MUD, OR DEBRIS DEPOSITED OR SPILLED UPON PUBLIC STREETS DURING ANY GRADING, HAULING, OR EXPORT OPERATIONS SHALL BE <br />IMMEDIATELY CLEANED UP BY THE DEVELOPER, HIS CONTRACTOR, SUBCONTRACTORS, OR AGENTS TO THE SATISFACTION OF THE CITY ENGINEER. FAILURE <br />TO DO SO WILL BE CAUSE FOR STOPPING ALL SUCH GRADING, HAULING, OR EXPORT WORK BY THE CITY UNTIL SUCH TIME AS THE STREETS ARE CLEANED. <br />19.ALL TRUCKS HAULING DIRT, SAND, OIL, OR OTHER LOOSE MATERIALS ARE TO BE COVERED OR SHOULD MAINTAIN A LEAST TWO FEET OF FREEBOARD IN <br />ACCORDANCE WITH THE REQUIREMENTS OF CVC SECTION 23114. <br />20.CONTRACTOR IS RESPONSIBLE FOR THE REPAIR OF ALL DAMAGES TO PUBLIC PROPERTIES THAT ARE CAUSED BY THE WORK ON-SITE. REPAIR MUST BE <br />COMPLETED TO THE SATISFACTION OF THE CITY ENGINEER. <br />21.MINIMUM ASPHALT PAVEMENT SECTIONS SHALL BE: <br />3”AC/6”AB - PARKING AISLES <br />4”AC/8”AB - DRIVES [COMMERCIAL] <br />4”AC/12”AB - DRIVES [INDUSTRIAL] <br />3” A.C. OVER 4” A.B. - PARKING STALLS [MULTI-FAMILY] <br />3” A.C. OVER 8” A.B. - DRIVE AISLES [MULTI-FAMILY] <br />22.EARTHWORK VOLUMES: <br />CUT 59,519 CUBIC YARDS <br />FILL 47,953 CUBIC YARDS <br />NET 11,566 CUBIC YARDS EXPORT <br />23.IF THE NET VOLUMES EXCEED 500 CUBIC YARDS, THE CONTRACTOR MUST SUBMIT A HAUL TRUCK ROUTE TO THE CITY FOR APPROVAL. HAUL ROUTE SHALL <br />INCLUDE THE LOCATION OF BORROW AND/OR DISPERSAL SITE, ALL STREETS INCLUDED IN THE ROUTE, THE PROPOSED STAGING AREA AND THE MAXIMUM <br />GROSS WEIGHT OF THE TRUCKS WHEN LOADED. <br />24.SUBMIT AN 8 1⁄2” X 11” HAUL ROUTE MAP OF APPROPRIATE SCALE WHICH INDICATES THE LOCATION OF THE PROJECT SITE, SHOWING STREETS AND <br />DIRECTION OF HAULING UP TO AND INCLUDING THE END OF THE ROUTE. <br />25.PURSUANT TO ASSEMBLY BILL 3019, NO EXCAVATION PERMIT IS VALID UNLESS THE CONTRACTOR CONTACTS AND OBTAINS AN INQUIRY I.D. NUMBER FROM <br />“UNDERGROUND SERVICE ALERT” (1-800-422-4133) AT LEAST TWO WORKING DAYS PRIOR TO COMMENCING EXCAVATION. <br />26.SEPARATE PERMITS MUST BE OBTAINED FROM THE CITY BUILDING AND SAFETY DIVISION FOR THE CONSTRUCTION OF RETAINING WALLS, LIGHT POLES, <br />TRASH ENCLOSURES, ON-SITE PLUMBING AND ALL BUILDING STRUCTURES. <br />27.ALL FONTS ON PLANS SHOULD BE A MINIMUM OF 0.1”. <br />1.ALL WORK SHALL BE IN ACCORDANCE WITH THE EROSION CONTROL PLANS, THE PROJECT’S STORM WATER POLLUTION PREVENTION PLAN (SWPPP), AND THE <br />RECOMMENDATIONS OF SOILS REPORT. <br />2.EROSION CONTROL MEASURES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHENEVER THE DAILY RAINFALL PROBABILITY EXCEEDS 40%. <br />3.EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. NECESSARY MATERIALS SHALL BE <br />AVAILABLE ON SITE AND STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL DEVICES AT ALL <br />TIME. <br />4.CONTROLS SHALL BE SET UP AND MAINTAINED AS CONSTRUCTION PROCEEDS. ADJUSTMENTS TO THE EROSION CONTROL PLANS ARE ALLOWABLE AS <br />REQUIRED AND APPROVED BY CITY. <br />5.ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL IMPLEMENT STRUCTURAL AND NONSTRUCTURAL BEST MANAGEMENT PRACTICES (BMPS) IN <br />CONFORMANCE WITH THE GUIDELINES OF THE CALIFORNIA STORM WATER BMP HANDBOOKS. <br />6.AFTER A RAINSTORM, ALL SEDIMENT AND DEBRIS SHALL BE REMOVED FROM STREETS, BERMS AND DESILTING BASINS. ANY GRADED SLOPE SURFACE <br />PROTECTION MEASURES DAMAGED DURING A RAINSTORM SHALL BE IMMEDIATELY REPAIRED. <br />7.THE PERMITTEE AND CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT TRESPASS ONTO AREAS WHERE <br />IMPOUNDED WATER CREATED A HAZARDOUS CONDITION. <br />ALL WORK SHALL BE IN ACCORDANCE WITH THE LATEST ADOPTED EDITION OF: <br />1.SPECIAL REQUIREMENTS OF THE PERMIT <br />2.STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION <br />3.CITY OF SANTA ANA CODE <br />4.CALIFORNIA ENERGY CODE <br />5.NATIONAL ELECTRIC CODE <br />6.NFPA STANDARD 13 <br />7.NFPA STANDARD 24 <br />8.ORANGE COUNTY FIRE DEPARTMENT <br />2022 CALIFORNIA BUILDING STANDARDS CODE (CBSC) AS OF JANUARY 2, 2023: <br />1.2022 CALIFORNIA ADMINISTRATIVE CODE (CAC), PART 1, TITLE 24 CBSC <br />2.2022 CALIFORNIA BUILDING CODE (CBC), PART 2, TITLE 24 CBSC <br />3.2022 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, TITLE 24 CBSC <br />4.2022 CALIFORNIA MECHANICAL CODE (CMC), PART 4, TITLE 24 CBSC <br />5.2022 CALIFORNIA PLUMBING CODE (CPC), PART 5, TITLE 24 CBSC <br />6.2022 CALIFORNIA ENERGY CODE (CEC), PART 6, TITLE 24 CBSC <br />7.2022 CALIFORNIA FIRE CODE (CFC), PART 9, TITLE 24 CBSC <br />8.2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CGBSC), PART 11, TITLE 24 CBSC <br />9.2022 CALIFORNIA REFERENCED STANDARDS CODE (CRSC), PART 12, TITLE 24 CBSC <br />CODES AND STANDARDS <br />SHEET <br />SHEET INDEX <br />TITLE SHEET AND GENERAL NOTES C-1.1 <br />EXISTING CONDITIONS PLAN C-2.1 <br />ROUGH GRADING PLAN C-3.1 <br />EROSION AND SEDIMENT CONTROL PLAN C-7.1 <br />PROJECT INFORMATION <br />OWNER:C.J. SEGERSTROM & SONS, A CALIFORNIA GENERAL PARTNERSHIP <br />DESIGN ENGINEER:INCLEDON CONSULTING GROUP <br />MICHAEL INCLEDON, RCE 52390 <br />1570 CORPORATE DRIVE, SUITE A <br />COSTA MESA, CA 92626 <br />(657) 622-2158 <br />SOILS ENGINEER:NMG GEOTECHNICAL, INC. <br />ZACHARY HAYGOOD, CEG 2726 <br />KARLOS MARKOUIZOS, RCE 50312 <br />17991 FITCH <br />IRVINE, CA 92614 <br />(949) 442-2442 <br />PROPERTY ADDRESS:3600 SOUTH SUSAN STREET <br />SANTA ANA, CA 92704 <br />ASSESSORS ID NUMBER(S):414-261-01 <br />FLOOD ZONE:ZONE X, REDUCED FLOOD RISK DUE TO LEVEE - FIRM # 06059C0258J <br />DRC #:DP NO. 2023-37R <br />LEGAL DESCRIPTION: <br />PARCEL 1, IN THE CITY OF SANTA ANA, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP FILED IN BOOK 121, PAGES 14 AND 15, INCLUSIVE OF PARCEL MAPS, IN <br />THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. <br />EXCEPTING THEREFROM ALL OIL, GAS AND MINERAL RIGHTS, BUT WITHOUT THE RIGHT OF ENTRY ON THE SURFACE OR WITHIN 500 FEET THEREOF, AS RESERVED BY C. <br />J. SEGERSTROM & SONS, A CALIFORNIA GENERAL PARTNERSHIP, IN THAT DEED RECORDED SEPTEMBER 30, 1980 IN BOOK 13766, PAGE 610 OF OFFICIAL RECORDS. <br />ALSO EXCEPTING THEREFROM THAT PORTION INCLUDED WITHIN TRACT NO. 11420, IN THE CITY OF SANTA ANA, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER <br />MAP RECORDED IN BOOK 492, PAGES 6 THROUGH 9, INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. <br />BENCHMARK: <br />BENCHMARK 1F-155-89 DESCRIBED BY ORANGE COUNTY PUBLIC WORKS DEPARTMENT AS FOLLOWS: <br />DESCRIBED BY OCS 2001 - FOUND 3 3 4". OCS ALUMINUM BENCHMARK DISK STAMPED "1F-155-89" SET IN A 3FT CONCRETE RETAINING WALL. MONUMENT IS LOCATED AT <br />THE SOUTHERLY ENTRANCE TO HARBOR CORPORATE PARK, 0.2 MILE NORTHERLY OF SUNFLOWER AVENUE ALONG THE EAST SIDE OF HARBOR BOULEVARD, 75 FT. <br />EASTERLY OF THE CENTERLINE OF HARBOR BOULEVARD AND 76 FT. NORTHERLY OF THE CORPORATE PARK ENTRANCE CENTERLINE. 28.1 FT. NORTHEASTERLY OF <br />STREET STANDARD "#2243107E". MONUMENT IS SET LEVEL WITH THE TOP OF RETAINING WALL. <br />ORANGE COUNTY PUBLISHED ELEVATION AT BENCHMARK 1F-155-89: 36.797 FEET [NAVD 1988] <br />BASIS OF BEARINGS <br />STATE PLANE COORDINATE VALUES WERE DEVELOPED FOR THE POINTS BASED UPON THE CALIFORNIA STATE PLANE COORDINATE SYSTEM, ZONE 6 (SPC 0406 CA 6), <br />BASED UPON THE NORTH AMERICAN DATUM OF 1983 (NAD83), NSR2011, 2010.00 EPOCH. THE VALUES FOR THE POINTS NOTED HEREON USED DATA FROM THE <br />CALIFORNIA REAL TIME NETWORK (CRTN), BASE STATION FVPK. <br />PROJECT AREAS <br />TOTAL SITE AREA 5.58 ACRES <br />DISTURBED AREA 5.58 ACRES <br />EXISTING % PERVIOUS 100% <br />SOUTH COAST TECHNOLOGY <br />CENTER ROUGH GRADING PLANS <br />3600 SOUTH SUSAN STREET <br />SANTA ANA, CA 92704 <br />N.T.S. <br />VICINITY MAP <br />SITE LOCATION <br />1.CONTRACTOR TO CLEAR PROJECT SITE AREA WITHIN THE CONFINES OF THE DEMOLITION LIMIT LINE. <br />2.THE CONTRACTOR SHALL BE FAMILIAR WITH AND RESPONSIBLE FOR CLEARING THE SITE IN PREPARATION FOR CONSTRUCTION. <br />3.PRIOR TO THE START OF GRADING, ALL EXISTING VEGETATION AND DEBRIS (INCLUDING EXISTING STRUCTURES, FOOTINGS, FOUNDATIONS, RUBBLE, TREES AND ROOT SYSTEMS) SHALL BE <br />REMOVED FROM THE SITE TO THE SATISFACTION OF THE SOILS ENGINEER. <br />4.THE ENGINEER OF RECORD ASSUMES NO LIABILITY FOR THE EXISTENCE AND LOCATIONS OF UNDERGROUND UTILITY LINES, STRUCTURES OR IRRIGATION LINES. INFORMATION SHOWN IS BASED <br />ON BEST AVAILABLE RECORD INFORMATION IN COORDINATION WITH SURFACE FEATURES. THE CONTRACTOR IS TO MAKE AN ON-SITE INSPECTION AND NOTIFY ALL UTILITY AND IRRIGATION <br />COMPANIES PRIOR TO WORK OR EXCAVATION TO DETERMINE THE EXACT LOCATION OF ANY AND ALL UNDERGROUND FACILITIES. <br />5.REMOVAL OF LANDSCAPING SHALL INCLUDE ROOTS AND ORGANIC MATERIALS. <br />6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY AND ALL PERMITS AND SHALL PAY ALL FEES NECESSARY FOR ENCROACHMENT, GRADING, DEMOLITION, AND DISPOSAL OF SAID <br />MATERIALS AS REQUIRED BY PRIVATE, LOCAL AND STATE JURISDICTIONS. <br />7.THE CONTRACTOR SHALL BE RESPONSIBLE FOR A SITE INSPECTION TO FULLY ACKNOWLEDGE THE EXTENT OF THE DEMOLITION WORK. <br />8.THE CONTRACTOR SHALL VERIFY AND LOCATE ALL EXISTING ABOVE AND UNDERGROUND UTILITIES. LOCATIONS SHOWN ON THE PLANS ARE APPROXIMATE AND ARE SHOWN FOR GENERAL <br />INFORMATION ONLY. <br />9.DAMAGE TO ANY EXISTING UTILITIES AND SERVICES TO REMAIN SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL REPAIR AND/OR REPLACE IN KIND. <br />10.ANY WALLS, FENCES, STRUCTURES AND/OR APPURTENANCES ADJACENT TO THIS PROJECT SHALL BE PROTECTED IN PLACE. IF GRADING OPERATIONS DAMAGE OR ADVERSELY AFFECT SAID <br />ITEMS IN ANY WAY, THE CONTRACTOR/ DEVELOPER IS RESPONSIBLE FOR WORKING OUT AN ACCEPTABLE SOLUTION TO THE SATISFACTION OF THE AFFECTED PROPERTY OWNER(S). <br />11.CONTRACTOR TO COORDINATE WET AND DRY UTILITIES PRIOR TO PLACEMENT. <br />12.CONTRACTOR SHALL MAINTAIN RECORD DRAWINGS OF ALL UTILITIES ENCOUNTERED DURING DEMOLITION, AND RECORD THE LOCATIONS OF ALL CAPPED UTILITIES. <br />13.MAINTAIN A RECORD OF LOCATION OF UTILITY LOCATIONS ON THE AS-BUILT PLAN. INFORM THE SURVEYOR TO LOCATE AND RECORD ACTUAL LOCATIONS. <br />14.ALL ITEMS OUTSIDE THE LIMIT OF WORK ARE TO BE PROTECTED IN PLACE. <br />15.COORDINATE SALVAGE OF REMOVAL ITEMS/EQUIPMENT WITH THE OWNER. <br />16.EROSION CONTROL MEASURES SHALL BE IMPLEMENTED TO PREVENT DEBRIS AND UNSUITABLE MATERIALS FROM ENTERING STORM DRAINS, SANITARY SEWERS AND STREETS. <br />17.DUST CONTROL SHALL BE IMPLEMENTED DURING DEMOLITION AND COURSE OF CONSTRUCTION. <br />18.DEMOLITION IS LIMITED TO WITHIN DEMOLITION LIMIT LINE UNLESS NOTED OTHERWISE. <br />19.ALL DEMOLITION SHALL COMPLY WITH CHAPTER 34 OF THE CBC AND ARTICLE 87 OF THE CFC. <br />20.CONTRACTOR TO FENCE SITE AS REQUIRED. <br />ABBREVIATIONS <br />AC/ASPH ASPHALTIC CONCRETE <br />BL/BLDG BUILDING <br />CB CATCH BASIN <br />CF CURB FACE OR CUBIC FEET <br />COM COMMUNICATIONS <br />CONC CONCRETE <br />CO CLEANOUT <br />DR DRIVE <br />DWV DOMESTIC WATER VALVE <br />DWG DRAWING <br />E ELECTRIC OR EASTING OR EAST <br />EC EDGE OF CONCRETE <br />EL ELECTRIC <br />EP EDGE OF PAVEMENT <br />EPB ELECTRICAL PULLBOX <br />EXIST EXISTING <br />FG FINISH GRADE <br />FH FIRE HYDRANT <br />FL FLOW LINE <br />FS FINISH SURFACE <br />FW FIRE WATER <br />FWV FIRE PROTECTION WATER VALVE <br />G GAS <br />GB GRADE BREAK <br />ICV IRRIGATION CONTROL VALVE <br />MH MANHOLE <br />NG NATURAL GRADE <br />NTS NOT TO SCALE <br />PA PLANTING AREA <br />PVC POLYVINYL CHLORIDE <br />PVMT PAVEMENT <br />R RIDGE <br />RCP REINFORCED CONCRETE PIPE <br />RW RECLAIMED WATER <br />RWV RECLAIMED WATER VALVE <br />SD STORM DRAIN <br />SDMH STORM DRAIN MANHOLE <br />SF SQUARE FEET <br />SS SANITARY SEWER <br />SSCO SANITARY SEWER CLEANOUT <br />SSMH SANITARY SEWER MANHOLE <br />STD STANDARD <br />TB TOP OF BERM <br />TOE TOE OF SLOPE <br />TG TOP OF GRATE <br />TYP TYPICAL <br />UG UNDER GROUND <br />UNK UNKNOWN <br />VA VALVE <br />VLT VAULT <br />WV WATER VALVE <br />1.ALL GRADING WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS AND RECOMMENDATIONS CONTAINED IN THE PROJECT SPECIFICATIONS. PROJECT SPECIFICATIONS <br />SHALL BE THE SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GREEN BOOK). <br />2.THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR THE JOB SITE CONDITIONS, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, DURING THE COURSE OF <br />CONSTRUCTION OF THIS PROJECT. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY, AND SHALL NOT BE LIMITED TO NORMAL WORKING HOURS. <br />3.PRIOR TO COMMENCING CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ALL JOIN CONDITIONS FOR GRADING, DRAINAGE AND UNDERGROUND FACILITIES, INCLUDING THE LOCATION AND <br />ELEVATION OF ALL SURFACE JOIN CONDITIONS, AND INCLUDING LOCATION AND ELEVATION OF EXISTING UNDERGROUND FACILITIES AT CROSSINGS WITH PROPOSED UNDERGROUND FACILITIES. <br />IF CONDITIONS DIFFER FROM THOSE SHOWN ON THE PLANS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND SHALL NOT BEGIN CONSTRUCTION UNTIL THE CHANGED CONDITIONS HAVE <br />BEEN EVALUATED. <br />4.ALL DRAWINGS ARE CONSIDERED TO BE A PART OF THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REVIEW AND COORDINATION OF ALL DRAWINGS AND <br />SPECIFICATIONS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES THAT OCCUR SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER PRIOR TO START OF <br />CONSTRUCTION SO THAT A CLARIFICATION CAN BE ISSUED. ANY WORK PERFORMED IN CONFLICT WITH THE CONTRACT DOCUMENTS OR ANY CODE REQUIREMENTS SHALL BE CORRECTED BY <br />THE CONTRACTOR AT THEIR OWN EXPENSE AND AT NO EXPENSE TO THE OWNER OR ARCHITECT/ENGINEER. <br />5.THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN <br />WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS. <br />6.NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. WHERE NO DETAILS ARE GIVEN, CONSTRUCTION SHALL BE AS SHOWN FOR SIMILAR <br />WORK. <br />7.THE EXISTENCE, LOCATION AND CHARACTERISTICS OF UNDERGROUND UTILITY INFORMATION SHOWN ON THESE PLANS HAVE BEEN OBTAINED FROM A REVIEW OF AVAILABLE RECORD DATA. NO <br />REPRESENTATION IS MADE AS TO THE ACCURACY OR COMPLETENESS OF SAID UTILITY INFORMATION. THE CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY <br />LINES SHOWN AND ANY OTHER LINES NOT OF RECORD OR NOT SHOWN ON THESE PLANS. CONTRACTOR WILL VERIFY LOCATIONS. <br />8.STRAIGHT GRADE SHALL BE MAINTAINED BETWEEN CONTOUR LINES AND SPOT ELEVATIONS UNLESS OTHERWISE SHOWN ON THE PLANS. <br />9.THE CONTRACTOR SHALL OBTAIN AN O.S.H.A. PERMIT FROM THE CALIFORNIA DIVISION OF INDUSTRIAL SAFETY PRIOR TO THE CONSTRUCTION OF TRENCHES OR EXCAVATIONS WHICH ARE FIVE <br />FEET OR DEEPER. <br />10.A LICENSED LAND SURVEYOR OR A REGISTERED CIVIL ENGINEER SHALL PERFORM CONSTRUCTION STAKING FOR IMPROVEMENTS SHOWN ON THESE PLANS. <br />11.THE CONTRACTOR SHALL REPLACE ALL EXISTING IMPROVEMENTS DAMAGED DURING CONSTRUCTION TO MATCH EXISTING, INCLUDING PERMANENT TRENCH RESURFACING. <br />12.PRIOR TO EXCAVATION CONTRACTOR TO CONTACT UNDERGROUND SERVICE ALERT (800-422-4133) FOR PUBLIC UTILITIES. <br />13.ALL DIMENSIONS ARE IN FEET OR DECIMALS THEREOF. <br />14.CONTRACTOR TO BE AWARE OF ALL OVERHEAD LINES AT ALL TIMES, SO AS NOT TO DISTURB THEM. <br />15.CONTRACTOR SHALL OBTAIN ANY NECESSARY PERMITS FROM THE CITY OF SANTA ANA. <br />16.STORM DRAINAGE SYSTEMS SHOWN ON THESE PLANS HAVE BEEN DESIGNED FOR THE FINAL SITE CONDITION AT COMPLETION OF THE PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR <br />MAINTAINING ADEQUATE DRAINAGE OF THE SITE, DURING INTERIM CONDITIONS OF CONSTRUCTION. <br />17.CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS, INCLUDING NPDES, FROM THE APPROPRIATE JURISDICTIONAL AGENCIES FOR THE DISCHARGE OF STORM WATER RUNOFF AND <br />GROUNDWATER THAT MAY BE NECESSARY TO ACCOMPLISH THE EXCAVATIONS AND CONSTRUCTION WORK SHOWN ON THESE PLANS. <br />18.ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL CONFORM TO THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (THE GREENBOOK), CURRENT EDITION, ALL <br />SUPPLEMENTS THERETO, AND THE CITY OF SANTA ANA STANDARDS AS REQUIRED. <br />19.THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION PHASING PLAN. THE PLAN SHALL BE REVIEWED BY THE OWNER PRIOR TO CONSTRUCTION. <br />20.CONSTRUCTION OF THE PROJECT WILL REQUIRE THE CONTRACTOR TO COORDINATE WITH THE OWNER AND MAINTAIN TRAFFIC IN THE AREAS OF CONSTRUCTION. CONTRACTOR WILL MAINTAIN <br />ACCESS TO ADJOINING BUILDINGS AND DRIVEWAYS AT ALL TIMES. PROVIDE TEMPORARY DRIVEWAYS AND TRAFFIC-RATED PLATES OVER OPEN TRENCHES. CONTRACTOR SHALL LIMIT THE <br />AMOUNT OF OPEN TRENCH SO THAT TRAFFIC CAN BE MAINTAINED. CONFORM TO THE GENERAL CONDITIONS. IF REQUIRED, CONTRACTOR SHALL IMPORT FILL MATERIAL FROM OFF-SITE. <br />GENERAL CONTRACTOR TO PROVIDE ALL TRAFFIC CONTROL PERMITS AND COORDINATE PHASING OF OPERATIONS WITH THE PROJECT TEAM. <br />21.IF ANY UNFORESEEN SUB-SURFACE STRUCTURES ARE ENCOUNTERED DURING CONSTRUCTION, THEY SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE SOILS ENGINEER AND/OR <br />OWNER'S REPRESENTATIVE BEFORE PROCEEDING FURTHER. <br />22.CONTRACTOR SHALL REPLACE ANY SURFACE OR SUBSURFACE IMPROVEMENTS DAMAGED OR REMOVED DUE TO CONSTRUCTION AND IS REQUIRED TO REPLACE THEM TO THEIR ORIGINAL <br />CONDITION. <br />23.CONTRACTOR SHALL MAINTAIN ACCESS TO EXISTING FIRE LANES AT ALL TIMES. COORDINATE WITH FIRE AUTHORITY. <br />24.THE CONTRACTOR SHALL OBTAIN ALL NECESSARY INSPECTIONS PRIOR TO POURING ANY CONCRETE. <br />25.CONTRACTOR IS RESPONSIBLE FOR EROSION, DUST, MUD, SILT, DEBRIS, AND TEMPORARY DRAINAGE CONTROL DURING GRADING OPERATIONS. <br />26.THE TERM "INSPECTION" OR "INSPECT" AS USED IN THESE CONTRACT DOCUMENTS SHALL BE TAKEN TO MEAN "OBSERVE" OR "OBSERVATION". THE ENGINEER IS NOT RESPONSIBLE FOR THE <br />CONTRACTOR'S CONSTRUCTION METHODS. <br />27.SUBMIT LAYOUT DRAWINGS FOR ALL MATERIALS PRIOR TO ANY MATERIAL PURCHASE OR INSTALLATION. SUBMITTALS INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING: <br />UTILITY PRODUCT DATA FOR EACH TYPE OF PRODUCT INDICATED <br />(PIPE, FITTINGS, VALVES, CLEANOUTS, INLETS, DEVICES, ETC) <br />PAVEMENT PRODUCT DATA FOR EACH TYPE OF PRODUCT INDICATED <br />(JOB MIX DESIGNS, PAVING PRODUCTS, ADMIXTURES, CURING MATERIALS, JOINT SEALANTS, ETC) <br />28.REMOVE INTERFERING PORTIONS OF EXISTING ABANDONED UTILITIES AS REQUIRED TO CONSTRUCT PROJECT. VERIFY ABANDONED STATUS PRIOR TO REMOVAL. CONTRACTOR IS RESPONSIBLE <br />FOR DOCUMENTING FINAL CONDITIONS IN AS-BUILT DRAWINGS. GENERAL CONTRACTOR TO PROVIDE NEW MONUMENTS IN THE EVENT EXISTING MONUMENTS ARE DISTURBED OR RELOCATED. <br />CIVIL DEMOLITION NOTES <br />NOTES TO CONTRACTORGENERAL GRADING NOTES <br />EROSION AND SEDIMENT CONTROL GENERAL NOTES <br />I HAVE REVIEWED AND APPROVE THIS GRADING PLAN. IT COMPLIES WITH ALL OF THE REQUIREMENTS <br />AND RECOMMENDATIONS PER GEOTECHNICAL REPORT DATED 4/18/2024. <br />______________________________________________________________________________ <br />SOILS ENGINEER SIGNATURE DATE <br />SOILS ENGINEER CERTIFICATION <br />CORROSION ENGINEER:PROJECT X <br />EDUARDO HERNANDEZ, P.E. <br />29990 TECHNOLOGY DRIVE, SUITE 13 <br />MURRIETA, CA 92563 <br />(213) 928-7213 <br />C-1.1 <br />SHEET 1 OF 4 <br />10/14/2024 <br />Behrooz Sarlak 10/29/2024