Laserfiche WebLink
Planning & Bu ilding Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M!19) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-01 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />Project Address:2315 N. Riverside Ave. Santa Ana 92706 <br />Contractor Company Name: Pure Solar <br />ContractorLicenseNumber: 1006423 <br />4 <br />5 <br />YES NO1 gfI <br />2 Q, tr <br />3 Eltr <br />gD <br />gtr <br />9s <br />10 Eltr <br />Eltrgtr <br />Eltr <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Wll the PV system weigh maxjmum 4 pounds per square feet or less? <br />Wlll the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages ofthe plans stamped and signed by a California <br />licensed professional engineer? (including project speciflc site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturels PV support information.) <br />6 <br />7 <br />8 <br />o <br />I certify under penalty of perjury under the laws of the State of California that the above is true: <br />Print Name: David Valadez Signature <br />PhoneNumber: 951'426-4602 Date: 5130118 <br />Email Address: ash ley @ pu resolarpros. com <br />**SNIA <br />NA,'ffi <br />.l <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x17" size. lf answerinq NO to anv of the ouestions. olan check shall be reouired.