Laserfiche WebLink
Plannlng & Building Agency <br />Bulldlng Safety Dlvision <br />20 CMc Center Plaza <br />P.o. Box 1988 (Itl-l9) <br />Santa Ana, CA 92702 <br />(7r4) 647{800 <br />www.aanla-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-01 cBc 2013 <br />Solar Photovoltalc (PV) Checkllst for Detached SINGLE FA ILY RESIDENCES Only <br />lnstructlons: The licensed contraclor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11' x 17" Eize. lf answerlns NO to anv ol the ques0ons. plan check thall be reoulred. <br />Project Address:GOs N Sunset St, Santa ana, CA 92703, US <br />TESLA <br />YES NO Are the following applicablo to the proposed project? <br />Will the PV system layout provide the required thre+'foot wide clear access pathways <br />per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan? <br />Vvill the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />\Mll the PV anay be flush mounted to the existing roof so that the plane of th€ <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />\Mll the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum 1o 10'maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Wll the anchorc be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Willthe minimum 5/16" lag screws be installed with a minimum of 2'112lnch <br />embedment into roof rafters (with pre{rilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the slructural pages of the plans WET stamped and signed by a Califomia <br />licensed professional engineer? (including pro,ect sp€cific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />1 EI tr <br />2 trtr <br />ao <br />Eltr <br />Eltr <br />tro <br />atr <br />c <br />4 <br />5 <br />6 <br />7 <br />S. Etr <br />s Elo <br />10 tra <br />I certlfy unde <br />Print Name: <br />r penalty of periury u nder the laws of the State ol <br />Signatu <br />Phone Number:.2Aq <br />Email Address: <br />R6v: 8Yr72015 <br />tnt0x Ktav v\\f^r0 <br />Date:6 <br />ia that tho is truo: <br />-,-SANTA <br />ANArr[]* <br />Contractor Company Name: <br />Gontractor Llcense Numbet:888 104