Laserfiche WebLink
-'-SANTA <br />ANAqil$ <br />Plannlng & Building Agency <br />Bulldlng Safety Dlvision <br />20 Clvic Center Plaza <br />P.O. Aox 1988 (M-19) <br />Santa Ana, C492702 <br />(714) 647-5800 <br />www.santa{na.org <br />RESIDENTIAL <br />PHOTOVOLTA!C <br />CHECKLIST <br />sol{1 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer lhe ten questions and <br />sig n the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size.f answerin NO to of he u n check shall be re <br />Project Address: <br />Contractor Company Name: <br />Contractor License Number: <br />TESLA <br />BBB 104 <br />YES NO Are the following applicable to the proposed proiect? <br />Will the PV system layout provide the required three'foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted lo the existing roof so that the plane of tho <br />modules (panels) are parallel to lhe plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and haps)? <br />Will the PV system be installed with a space of 2'minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter'weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment into roof rafters (with predrilled holes) and is lhis minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including proiecl specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />,|trtr <br />2 trtr <br />trtr <br />trDatr <br />trtr <br />tro <br />4 <br />5 <br />6 <br />7 <br />I Eltr <br />a @tr <br />'10.trtr <br />I certity under pe nalty o, pariury under the laws of the State of C <br />Print Name:Signatu <br />Phone Numb6r <br />Email Address: <br />2Aq Date:5 <br />R€v: 8/1712015 <br />tnftx^t axv\\{at1@fl(r,( <br />rnia that tho a is truo: <br />G05 N Sunset St, Santa ana, CA 92703, US