Laserfiche WebLink
Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M.19) <br />Sanla Ana, CA 92702 <br />(714) 647.5800 <br />www.santa-ana.org <br />RES!DENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />1 <br />sol-01 cBc 2013 <br />Solai Photovoltaic (PV) Checktist for Detached STNGLE FAMILy RESTDENCES Onty <br />lnslructions: The licensed contractor of record shall com plete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached lo each of TWO sets of plans, of <br />minimum 11"x 17 <br />Project Address: <br />" size. lf answerin NO to anv of the oue stions. Dlan check sh all be required <br />,I026 S. DENNIS ST, SANTA ANA, CA 92704 <br />Contractor Company Name:SOUTHWEST SUN SOLAR, INC <br />contractoi License Number: 1004667 <br />YES NO Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roollng layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the ptane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Wll the PV system be inslalled with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />sYstem? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-1/2 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />E tr <br />4 <br />5 <br />2 <br />3 <br />6 <br />7 <br />8tr <br />EID <br />tstr <br />Ettr <br />ED <br />trtr <br />8. trtr <br />e. trtr <br />Are ALL the structural pages of the plans WET stamped and signed <br />licensed professional engineer? (including project specific site plan, <br />anchorage spacing, anchorage details and manufacture/s pV supp <br />by <br />PV <br />a California <br />layout, <br />nformation.) <br />I certify under penalty of periury under the laws of the Stale of California <br />Signature <br />Date: <br />above is true: <br />1 t9 <br />p1;611i12rns. TRANG CONG PHAN/ <br />Phone Numbar: 714 582 3909 <br />Emait Address: PERIVIT@SOUTHWESTSUNSOLAR.COIV <br />Rev: al1'|12015 <br />,**SNTA <br />NA,Iffi <br />10. EE