My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1041 S Dennis St - Soils Report
PBA
>
Building
>
Soils Reports
>
D
>
Dennis St
>
1041 S Dennis St
>
1041 S Dennis St - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2021 7:57:54 AM
Creation date
7/26/2021 7:57:50 AM
Metadata
Fields
Template:
Soils Report
Full Address
1041 S Dennis St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
applicable portions ofthe grading code of local regulatory agencies. All earthwork should be <br />performed under the observation and testing ofa qualilied geotechnical engineer. <br />7.2 SITE AND FOUNDATION PRFJPARATION <br />All site preparation should be observed by experienced personnel reporting to the project <br />Geotechnical Engineer. Our field monitoring services are an essential continuation ofour prior <br />studies to confirm and correlate the findings and our prior recommendations with the actual <br />subsuri'ace conditions exposed during construction, and to confirm that suitable fill soils are <br />placed and properly compacted. <br />The site fill material is considered undocumented and may not be suitable for suppon of the <br />new footings. We recommend that the upper 3 feet of existing soils be removed and <br />recompacted. If loose, disturbed, or otherwise unsuitable materials are encountered at the <br />bottom of excavation. removal of unsuitable soils will be required until firm soils are <br />encountered. The compacted fill soils should be extended horizontal by about 5 feet of building <br />footprints. <br />Excavations below the final grade level should be properly backfilled using lean concrete or <br />approved fill material compacted to a minimum of 90 percent of the maximum dry density as <br />determined by ASTM Test Method D1557. The backfill and any additional fill should be <br />placed in loose lifts less than 8 inches thick. moisture conditioned to near optimum moisture <br />content. and compacted to 90 percent. Fill materials should be tiee ofconstruction debris, roots, <br />organic matter, rubble, contaminated soils, and any other unsuitable or deleterious material as <br />determined by the Geotechnical Engineer. The on-site soils are suitable for use as compacted <br />fill, provided the soil is free of any deleterious substance. All import fill material should be <br />approved by the Geotechnical Engineer prior to importing to the site for use as compacted fill. <br />Excavation activities should not disturb adjacent structures or undermine any adjacent footings. <br />Existing utilities should be removed and adequately capped at the project boundary line. or <br />salvaged./rerouted as desi gned. <br />7.3 FILL PLACEMENT AND COMPACTION REQUIREMENTS <br />Material for engineered fill should be select liee of organic material. debris. and other <br />deleterious substances, and should not contain liagments greater than 3 inches in maximum <br />6-*:Dennis- l -01
The URL can be used to link to this page
Your browser does not support the video tag.