My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26 Civic Center Plz - REV 5 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Civic Center Plz
>
26 Civic Center Plz
>
26 Civic Center Plz - REV 5 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 4:36:18 AM
Creation date
9/12/2025 5:00:04 AM
Metadata
Fields
Template:
Plan
Permit Number
20181364
20184057
30146548
40138556
40139543
101117272
101117273
101117274
101117275
101117276
101117286
101120941
101121751
Full Address
26 Civic Center Plz
Street Number
26
Street Name
Civic Center
Street Suffix
Plz
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#12 HANGER WIRE <br /> TEE GRID SYSTEM <br />ACOUSTICAL <br />CEILING PANELS <br />PERIMETER TRIM <br />4"H U.N.O. <br />T-BAR CONNECTOR CLIP <br />SEISMIC CLIP <br />"TEGULARIZE" CUT PANELS AT <br />PERIMETER <br />"T" BAR <br />SUSPENDED ACOUSTICAL <br />CEILING PANEL <br />HEMMED ANGLE MOUNDING <br />PARTITION AS SCHEDULED, SEE <br />PLAN FOR TYPE <br />WIRE HANGER <br />3/4" MIN. <br />8" MAX. <br />7/8" <br />NOTE: <br />USE SLIP CONNECTION AT TWO ADJACENT WALLS. AT <br />THE TWO OTHER, SECURE THE MAIN AND CROSS TEES <br />TO THE WALL ANGLE TO FORM A FIXED CONNECTION. <br />VERIFY WITH CEILING MANUFACTURER THE REQ'D <br />CLEAR DIMENSION BETWEEN CEILING TEE AND WALL. <br />(4) 12GA. SPLAY WIRES <br />(ATTACH TO MAIN RUNNER <br />ONLY)@ 45° FROM CLNG. <br />PLANE + 90° FROM EACH <br />OTHER PARALLEL TO CROSS <br />TEES AND MAIN RUNNERS. <br />SPACE @ 12' O.C. MAX BOTH <br />DIRECTIONS. <br />HEAVY DUTY MAIN RUNNER @ 4'-0" O.C. <br />LOCKING CROSS <br />TEES @ 2'-0" O.C. TYP. <br />MAX. <br />MAX. <br />2" <br />2" <br />TYP. 12GA. HANGER WIRE <br />ATTACHED TO STRUCTURE <br />ABV. COMPRESSION STRUT. <br />ANGLE CLIP-PINNED TO <br />CEILING STRUCTURE AND <br />BOLTED TO VERTICAL <br />COMPRESSION STRUT <br />TYP. 12 GA. HANGER WIRE @ <br />4' O.C. + W/IN 8" OF PERIM. <br />WALL OR CLNG. <br />DISCONTINUITY. ADD. WIRES <br />W/IN 3" OF EA. CORNER OF <br />EA. FIXTURE + 2 ADD. WIRES <br />ATTACHED TO OPP. <br />CORNERS OF FIXTURES. <br />COMPRESSION STRUT SEE <br />STRUT CONNECTION DETAIL <br />3/A9.2-1 FOR ATTACHMENT TO <br />STRUCTURE ABOVE. LOCATE <br />ON MAIN RUNNER ON CENTER <br />OF 12x24 FIELD GRID, STARTING <br />AT MAX. OF 6'-0" FROM <br />PERIMETER.• <br />• <br />• <br />NOTES: <br />1. AREA OF CEILING PER EACH BRACE NOT TO <br />EXCEED 144 SQ. FT <br />2. FIRST BRACING POINT WITHIN 6 FT. OF EACH <br />WALL. <br />3. BRACE POINT ON MAIN RUNNER NOT TO EXCEED <br />2" DISTANCE FROM CROSS RUNNER. <br />4. COMPLY WITH CBC 2022 FOR CEILING SUPPORT. <br />5. AT LIGHT FIXTURES PROVIDE SAFETY CLIPS TO <br />TIE TO CLNG. LIGHT FIXTURE (ALL TYPES) <br />MECHANICALLY ATTACHED TO GRID (TWO PER <br />FIXTURE UNLESS INDEPENDENTLY SUPPORT), <br />REQUIRED FOR: <br />- PENDANT-HUNG FIXTURES DIRECTLY SUPPORTED <br />FROM STRUCTURE WITH 9 GA. WIRE <br />- RIGID LAY-IN OR CAN FIXTURES: <br />LESS THAN OR EQUAL TO 10LBS, ONE WIRE <br />TO STRUCTURE <br />11-56 LBS: TWO WIRES FROM HOSUING TO <br />STRUCTURE <br />EQUAL TO OR GREATER THAN 57 LBS: <br />SUPPORTED DIRECTLY TO STRUCTURE <br />TOP CLIP (MECHANICALLY FASTENED) <br />SPRING CLIP <br />VERTICAL HANGER WIRE <br />BULB CLIP (MECHANICALLY FASTENED) <br />"T" BAR CROSS TEE <br />"T" BAR MAIN RUNNER <br />TEGULAR ACOUSTIC PANEL <br />WIRE HANGER <br />NOTES: <br />1. SEE SCHEDULE FOR FINISH CEILING TYPE <br />2. USE MANUFACTURER RECOMMENDED SEISMIC PERIMETER <br />CONNECTION AT TWO ADJACENT WALLS. AT THE TWO REMAINING <br />WALLS, SECURE THE MAIN AND CROSS TEES TO THE WALL ANGLE TO <br />FORM A FIXED CONNECTION <br />ELEVATION <br />SCHEDULED SUSPENDED <br />CEILING SYSTEM <br />3/4" MIN8" <br />BRACING WIRES, 12 <br />GAUGE MIN. <br />PLAN <br />8"6'-0" MAX 12'-0" O.C. <br />6' <br />- <br />0 <br />" <br /> <br />M <br />A <br />X <br />12 <br />' <br />- <br />0 <br />" <br /> <br />O <br />. <br />C <br />. <br />90°90° <br />3/4" MIN. CLEAR <br />CROSS RUNNER OR <br />MAIN RUNNERRIGID VERTICAL STRUT @ 12'-0" O.C. <br />I.C.B.O. #2244, SEE DET. 2, 3/A9.4-1 <br />NOTE: <br />TIE MAIN AND CROSS RUNNER TO TWO ADJACENT WALLS THAT WITH FIXIED <br />CONNECTIONS, 7/A9. 4-1. THE OTHER TWO ADJACENT WALLS SHALL BE A SLIPPED <br />CONNECTION, 1/A9.4-1 <br />. <br />45 <br />, <br />0 <br />0 <br />° <br />. <br />PERIMETER VERTICAL HANGER WIRES, TYP. <br />ATTACH <br />SCREW <br />THROUGH <br />EITHER TOP <br />FASTENER <br />OPENING <br />8 MAX. <br />PERIMETER <br />HANGER <br />WIRE <br />7/8" <br />SEISMIC <br />CLIP (USG <br />ACM7) <br />PERIMETER <br />CLOSURE <br />(MOLDING) <br />2 <br />ALIGN <br />.25" MOUNTING HOLE <br />CAM LATCH <br />.625" RECESS <br />PLASTIC GROMMET <br />ADHESIVE MASTIC <br />DRYWALL BEAD <br />HINGE <br />PANEL WIDTH AS SPECIFIED <br />0' <br /> <br />- <br /> <br />2 <br /> <br />1 <br />/ <br />2 <br />" <br />ALIGN <br />EDGE MOULDING <br />HANGER WIRE, SEE A9.4-1 & <br />A9.4-2 FOR CONNECTION AND <br />MIN. SPACING REQUIREMENTS <br />SUSPENDED SOFFIT <br />ACT CEILING, SEE RCP <br />B.O. CLG. <br />SEE R.C.P. <br />SOFFIT <br />COLUMN W/ <br />FIREPROOFING, S.S.D. <br />L TRIM 2-1/2 INCH DRML-300 <br />#10 SMS, TYP. <br />2-1/2" C-CHANNEL <br />ACT CEILING, WHERE OCCURS, <br />SEE RCP <br />SLIP CONNECTION <br />HANGER WIRE, SEE A9.4-1 & <br />A9.4-2 FOR CONNECTION AND <br />MIN. SPACING REQUIREMENTS <br />1. SIM. REVEALS @ STRUCTURAL PENETRATION OF ACT CLG. <br />2. 4" ACT. TRIM IN LIEU OF 2 1/2 L TRIM @ ACT CLG. <br />B.O. CLG <br />SEE RCP <br />PER R.C.P. <br />2 <br />1 <br />/ <br />2 <br />" <br />2"2" <br />SOFFIT <br />COLUMN W/ <br />FIREPROOFING, S.S.D. <br />L TRIM 2-1/2 INCH DRML-300 <br />#10 SMS, TYP. <br />2-1/2" C-CHANNEL <br />ACT CEILING, WHERE OCCURS, <br />SEE RCP <br />SLIP CONNECTION <br />HANGER WIRE, SEE A9.4-1 & <br />A9.4-2 FOR CONNECTION AND <br />MIN. SPACING REQUIREMENTS <br />1. SIM. REVEALS @ STRUCTURAL PENETRATION OF ACT CLG. <br />2. 4" ACT. TRIM IN LIEU OF 2 1/2 L TRIM @ ACT CLG. <br />B.O. CLG <br />SEE RCP <br />PER R.C.P. <br />2 <br />1 <br />/ <br />2 <br />" <br />2"2" <br />JOIST STUD AS NEEDED SEE <br />04/A9.4-3 <br />SOFFIT FRAMING, <br />#10 SMS, TYP. <br />#142.1 <br />RFI <br />TRANSITION TRIM <br />HANGER WIRE <br />TO <br />STRUCTURE <br />CROSS TEE <br />\MAIN BEAM <br />ACOUSTICAL LAY-IN PANEL <br />HANGER WIRE <br />TO <br />STRUCTURE <br />MAIN BEAM <br />ACOUSTICAL LAY-IN PANEL <br />CROSS TEE <br />ST <br />09-30-2025 <br />O <br />ARCHITECT <br />FOFCALE <br />REN. <br />AT ARN <br />NO. <br />SE <br />LICNE <br />C-27893 <br />D <br />T <br />EC <br />HIT <br />ARC <br />DAVID SCHNEE <br />I <br />U <br />E <br />I <br />H <br />U <br />9 <br />AS.O <br />A <br />F R A N CN <br />4 0 8 0 <br />H <br />I <br />N <br />S <br />L11 <br />AL <br />E <br />CR <br />N D E N VA <br />,N I N G <br />CRAE <br />TCEIT <br />S C <br />S <br />N <br />N <br />G R O U P <br />7 <br />S <br />5 06 <br />C <br />0718 <br />2 <br />P <br />R <br />A <br />O <br />90 <br />A <br />EU <br />C <br />+ <br />ER <br />4 <br />SHEET TITLE AND NO. <br />SHEET NOTES <br />ISSUE DATE <br />PROJECT: <br />CA REG. <br />Project Arch.---- <br />---- <br />PERMIT SET 1ST ISSUANCE <br />BID SET <br />FINAL PERMIT/CONFORM SET <br />09/29/2023 <br />04/30/2024 <br />08/02/2024 <br />22575-01 <br />26 CIVIC CENTER <br />PLAZA <br />SANTA ANA <br />CA 92701 <br />SANTA ANA <br />LIBRARY <br />RENOVATION <br />CITY OF SANTA ANA <br />26 CIVIC CENTER PLAZA <br />SANTA ANA, CA 92701 <br />REV # DESCRIPTION DATE <br />1 BACKCHECK REV-1 03.01.2024 <br />2 CITY REVIEW REV-1 08.02.2024 <br />3 CITY REVIEW REV-2 10.18.2024 <br />4 CITY REVIEW REV-3 01.27.2025 <br />5 CITY REVIEW REV-4 04.07.2025 <br />6 CITY REVIEW REV-5 06.27.2025 <br /> <br />REVIEWED FOR CONSTRUCTABILITY: <br /> 80470 <br />SEAN THOMAS. P.E. RCE NO: <br />PRINCIPAL CIVIL ENGINEER <br />DATE: <br />RECOMMENDED FOR CONSTRUCTION: <br /> 62968 <br />JASON GABRIEL. P.E. RCE NO: <br />PRINCIPAL CIVIL ENGINEER <br />DATE: <br />A9.4-1 <br />INTERIOR DETAILS- <br />CEILINGS <br /> 6" = 1'-0"1 ICL- SUSPENDED CLG- SLIP CONNECTION @ PERIMETER <br /> 3" = 1'-0"2 ICL- SUSPENDED CLG <br /> 3" = 1'-0"3 ICL- SUSPENDED CLG COMPRESSION STRUT <br /> 6" = 1'-0"4 ICL- SUSPENDED CLG AT GRID <br /> 3" = 1'-0"5 ICL- SUSPENDED CLG PLAN AND ELEVATION <br /> 6" = 1'-0"7 ICL- SUSPENDED CLG AT FIXED PERIMETER <br /> 3" = 1'-0"8 ICL- ACCESS PANEL AT GYP. BD. CLG <br /> 3" = 1'-0"11 ICL - TYP. ACT @ GYP. SOFFIT <br /> 1 1/2" = 1'-0"12 ICL - COLUMN @ GYP. SOFFIT CROSS SECTION <br /> 1 1/2" = 1'-0"14 ICL - COLUMN @ GYP. SOFFIT CROSS SECTION LONG SPAN <br />#020 <br />ASI <br />#60 <br />RFI <br /> 3" = 1'-0"9 ICL - ACOUSTIC CEILING FLOATING EDGE <br /> 3" = 1'-0"6 ICL- ACT TRANSITION AT DIFFERENT HEIGHTS <br />#159.1 <br />RFI
The URL can be used to link to this page
Your browser does not support the video tag.