Laserfiche WebLink
JJ <br />1 <br />1 <br />2 <br />2 <br />3 <br />3 <br />4 <br />4 <br />5 <br />5 <br />6 <br />6 <br />7 <br />7 <br />8 <br />8 <br />9 <br />9 <br />10 <br />10 <br />CC <br />DD <br />EE <br />FF <br />HH <br />FC <br />B3 <br />FC <br />B4 <br />FC <br />B5 <br />FC <br />B6 <br />FC <br />B7 <br />FC <br />B8 FC <br />B9 <br />FC <br />B10 <br />FC <br />B2 <br />FC <br />B11 <br />FC <br />B1 <br />M <br />LBM- 1 <br />M <br />LBM- 5 <br />LBM- 7 <br />M M <br />LBM- 9 <br />M <br />LBM- 11 LBM- 13 <br />M M M <br />LBM- 3 <br />M <br />M <br />LBM- 19 <br />M <br />1 1 1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />7 <br />3 <br />LBM- 2 LBM- 4 <br />LBM- 15 <br />LBM <br />LBA <br />LBB <br />LBL <br />LBM- 6 <br />6 <br />(TYP.) <br />SE-1 <br />SE-2 <br />2"C.O. FOR <br />CONTROLS3/4"C, 3#10 & <br />1#10GND 5 <br />SEWER EJECTOR <br />CONTROL PANEL <br />4 <br />2 <br />004 <br />6 <br />EF <br />B-2 <br />EF <br />B-1 <br />(TYP 2) <br />LBM- 38,40,42 <br />LBM- 10 <br />6 <br />FC <br />ELEV <br />FC <br />ELEC <br />LBM- 8 <br />6 <br />2 <br />2 <br />2 4 4 <br />4 <br />4 6 <br />6 <br />DDC <br />LBM-14 <br />3/4"C, 3#10 & 1#10GND <br />LBM-29&31 <br />7 <br />7 <br />LBM-33 <br />6 <br />6 <br />LBM- 17 <br />L2M-20,22,24 <br />M <br />L2M-26 <br />8 <br />9 <br />HPWH-1 <br />CP-1 <br />006 <br />10 <br />006 <br />VFDVFD <br />008 <br />009 <br />VFD <br />VFD <br />1 <br />#10 <br />LBM-32,34,36 <br />LBM-21 <br />VAV <br />B-1 <br />M <br />LBM-23 <br />#177 <br />RFI <br />I <br />U <br />E <br />I <br />H <br />U <br />9 <br />AS.O <br />A <br />FRANCN <br />4 0 8 0 <br />H <br />I <br />N <br />S <br />L11 <br />AL <br />E <br />CR <br />NDEN VA <br />,N I N G <br />CRAE <br />TCEI T <br />SC <br />S <br />N <br />N <br />G R O U P <br />7 <br />S <br />5 06 <br />C <br />07 18 <br />2 <br />P <br />R <br />A <br />O <br />90 <br />A <br />EU <br />C <br />+ <br />ER <br />4 <br />SHEET TITLE AND NO. <br />SHEET NOTES <br />N <br />ISSUE DATE <br />PROJECT: <br />CA REG. <br />Project Arch.---- <br />---- <br />22575-01 <br />26 CIVIC CENTER <br />PLAZA <br />SANTA ANA <br />CA 92701 <br />SANTA ANA <br />LIBRARY <br />RENOVATION <br />CITY OF SANTA ANA <br />26 CIVIC CENTER PLAZA <br />SANTA ANA, CA 92701 <br />ELECTRICAL-PLMUMBING-MECHANICAL <br />1920 MAIN STREET, SUITE 820 <br />IRVINE, CA92614 <br />TEL: 949.516.6480 <br />BID SET <br />FINAL PERMIT/CONFORM <br />SET <br />04/30/2024 <br />08/02/2024 <br />E2.5-1 <br />ELECTRICAL <br />REMODEL <br />BASEMENT <br />MECHANICAL <br />POWER PLAN <br />1/8" = 1'-0"1 ELECTRICAL REMODEL BASEMENT POWER MECHANICAL PLAN <br />1. ALL RECEPTACLES ON COMMON WALLS SHALL BE SEPARATE BOXES <br />AND OFFSET MINIMUM 24 INCHES. <br />2. ALL PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE <br />PROTECTED FROM SPREAD OF FIRE WITH AN APPROVED FIRESTOP <br />SYSTEM EQUAL OR GREATER THAN THE FIRE RATING OF THE WALL. <br />3. ALL DEVICE HEIGHTS SHALL BE VERIFIED WITH THE ARCHITECT PRIOR <br />TO ROUGH-IN. <br />4. EXPOSED CABLE/CONDUCTORS INSTALLED IN A PLENUM SPACE SHALL <br />CONFORM TO CEC, ARTICLE 300.22(C). <br />5. PROVIDE ADDITIONAL J-BOX NEAR PANEL FOR MULTIPLE HOMERUN <br />CIRCUITRY <br />6. POWER AND DATA CORE AND FACEPLATES TO MATCH COLOR OF <br />ADJACENT WALL. <br />7. WHEN EXPOSED CEILINGS OR OPEN GRID CONDITIONS OCCUR, THE <br />CONTRACTOR SHALL PROVIDE THE FOLLOWING: <br /> 7.1 ALL BRANCH CIRCUITS SHALL BE IN EMT CONDUITS. <br /> 7.2 ALL BRANCH CIRCUITS SHALL BE ROUTED, NEATLY AND IN <br />PARALLEL TO STRUCTURES OR DUCT WORK. <br /> 7.3 VISUALLY OBJECTIONABLE BRANCH CIRCUITS SHALL BE <br />REROUTED AT THE REQUEST OF THE ARCHITECT AT NO ADDITIONAL <br />COST. <br />8. PROVIDE DEDICATED NEUTRAL FOR EACH NEW CIRCUIT, EXCEPT <br />WHERE OTHERWISE NOTED. HOME RUN CONDUCTORS MAY BE <br />COMBINED INTO ONE CONDUIT. NO RACEWAY OR CABLE SHALL <br />CONTAIN MORE THAN NINE (9) CURRENT CARRYING <br />CONDUCTORS.WHERE MULTIPLE CONDUCTORS IN EXCESS OF THREE <br />(3) ARE INDICATED ON THESE DRAWINGS, THEY HAVE BEEN DERATED <br />AS REQUIRED BY CEC ARTICLE 310 REQUIREMENTS. <br />9. NO EQUIPMENT, J-BOXES, ETC. REQUIRING ACCESS SHALL BE LOCATED <br />IN HARD LID CEILING AREAS (UNLESS ACCESS PANEL IS PROVIDED. <br />COORDINATE WITH ARCHITECT.) RELOCATE ANY EXISTING EQUIPMENT, <br />J-BOXES, ETC. TO ACCESSIBLE CEILING AREA. <br />10. UNLESS SPECIFICALLY SHOWN AS (E), (R), (ER), (D), EXISTING OR NON- <br />BOLD, ALL ELECTRICAL DEVICES SHOWN ARE NEW. <br />11. CONTRACTOR TO PROVIDE 1/2"CONDUIT WITH PULLSTRING TO ALL NEW <br />THERMOSTAT LOCATIONS. COORDINATE SCOPE OF WORK WITH <br />MECHANICAL DRAWINGS. <br />3 CONTRACTOR TO PROVIDE 120V POWER CONNECTION TO SERVE AHU UV <br />LIGHTS. COORDINATE EXACT LOCATION OF POWER FEED IN FIELD. <br />2 CONTRACTOR TO PROVIDE 120V POWER CONNECTION TO SERVE <br />LIGHTING AND RECEPTACLES INSIDE AHU. COORDINATE EXACT <br />LOCATION OF NEW POWER FEED IN THE FIELD. <br />1 CONTRACTOR TO PROVIDE POWER CONNECTION AND MOTOR RATED <br />SWITCH FOR FAN COIL UNIT. COORDINATE EXACT LOCATION OF SWITCH <br />IN THE FIELD AND WITH MECHANICAL DRAWING M2.1-1 <br />GENERAL NOTES <br />KEY NOTES <br />4 PROVIDE PANELS WITH OVERCURRENT PROTECTION DEVICES FOR NEW <br />PUMPS. PROVIDE CONTROL PANEL AND EXISTING CONTROLS ARE <br />EXISTING TO REMAIN.ALARM IS SIREN WITH STROBING LIGHT ON THE <br />PANEL. <br />5 PROVIDE 250V, 30AS/10AF, 3-PHASE, 3-WIRE & GND FUSED DISCONNECT <br />SWITCH TO SERVE SUMP PUMP. LOCATE WITHIN SIGHT OF PUMP. <br />6 CONTRACTOR TO PROVIDE 120V POWER CONNECTION AND GFCI <br />RECEPTACLE TO SERVE FAN COIL UNIT CONDENSATE PUMP. <br />COORDINATE EXACT LOCATION OF NEW RECEPTACLE IN THE FIELD. <br />7 POWER TO FAN COIL UNIT FROM OUTSIDE, ROOF MOUNTED, <br />CONDENSING UNIT. CONTRACTOR TO PROVIDE 3/4"C AND CONNECTION <br />TO ROOF MOUNTED CONDENSING UNIT. COORDINATE SCOPE OF WORK <br />WITH SHEET E2.4-4. <br />8 CONTRACTOR TO PROVIDE 30AS/30AF, 250V, 3-PHASE & GROUND <br />DISCONNECT SWITCH TO SERVE WATER HEATER. <br />9 CONTRACTOR TO PROVIDE 120V POWER CONNECTION AND MOTOR <br />RATED SWITCH TO SERVE NEW CIRCULATION PUMP. COORDINATE SCOPE <br />OF WORK IN THE FIELD AND WITH PLUMBING DETAILS ON SHEET P2.5-1. <br />10 CONTRACTOR TO PROVIDE 120V POWER CONNECTION AND MOTORATED <br />SWITCH FOR VAV CONTROLS. EXTEND CIRCUITING TO ALL LOCATIONS IN <br />THE FIELD AND COORDINATE WITH MECHANICAL DRAWINGS, USING <br />3/4"C, 2/12 & 1#12GND. <br />REV # DESCRIPTION DATE <br />#020 ASI 03.21.2025 <br />#177 RFI 05.21.2025