My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26 Civic Center Plz - REV 5 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Civic Center Plz
>
26 Civic Center Plz
>
26 Civic Center Plz - REV 5 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 4:36:18 AM
Creation date
9/12/2025 5:00:04 AM
Metadata
Fields
Template:
Plan
Permit Number
20181364
20184057
30146548
40138556
40139543
101117272
101117273
101117274
101117275
101117276
101117286
101120941
101121751
Full Address
26 Civic Center Plz
Street Number
26
Street Name
Civic Center
Street Suffix
Plz
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Santa Ana Public Library Renovation <br />Group 4 Architecture Research + Planning, Inc. Allegion <br />Group 4 Project No. 22575-01 May 07, 2025 <br /> <br /> <br />DOOR HARDWARE 087100-1 <br />SECTION 08 71 00 - DOOR HARDWARE <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of Contract, including General and Supplementary Conditions <br />of Division 1 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. This Section includes items known commercially as finish or door hardware that are required for <br />swing, sliding, and folding doors, except special types of unique hardware specified in the same <br />sections as the doors and door frames on which they are installed. <br />B. This Section includes the following, but is not necessarily limited to: <br />1. Door Hardware, including electric hardware. <br />2. Storefront and Entrance door hardware. <br />3. Thresholds, gasketing and weather-stripping. <br />C. Related Sections: The following sections are noted as containing requirements that relate to this <br />Section, but may not be limited to this listing. <br />D. <br />1. Division 8: Section – Hollow Metal Doors and Frames. <br />2. Division 8: Section - Flush Wood Doors. <br />3. Division 8: Section - Aluminum Storefront. <br />4. Division 28: Section - Fire/Life-Safety Systems & Security Access Systems. <br />1.3 REFERENCES (USE DATE OF STANDARD IN EFFECT AS OF BID DATE.) <br />A. 2022 California Building Code, CCR, Title 24. <br />B. BHMA – Builders’ Hardware Manufacturers Association <br />C. CCR – California Code of Regulations, Title 24, Part 2, California State Accessibility Standards. <br />D. DHI – Door and Hardware Institute <br />E. NFPA - National Fire Protection Association. <br />1. NFPA 80 - Fire Doors and Other Opening Protectives <br />2. NFPA 105 - Smoke and Draft Control Door Assemblies <br />F. UL - Underwriters Laboratories. <br />1. UL 10C - Fire Tests of Door Assemblies <br />2. UL 305 - Panic Hardware <br />G. WHI - Warnock Hersey Incorporated <br />H. SDI - Steel Door Institute
The URL can be used to link to this page
Your browser does not support the video tag.