My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26 Civic Center Plz - REV 5 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Civic Center Plz
>
26 Civic Center Plz
>
26 Civic Center Plz - REV 5 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 4:36:18 AM
Creation date
9/12/2025 5:00:04 AM
Metadata
Fields
Template:
Plan
Permit Number
20181364
20184057
30146548
40138556
40139543
101117272
101117273
101117274
101117275
101117276
101117286
101120941
101121751
Full Address
26 Civic Center Plz
Street Number
26
Street Name
Civic Center
Street Suffix
Plz
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Santa Ana Public Library Renovation <br />Group 4 Architecture Research + Planning, Inc. <br />Group 4 Project No. 22575-01 RFI #121 – April 16, 2025 <br /> <br /> <br />OPERABLE PARTITIONS 10 2226-1 <br />SECTION 10 2226 – OPERABLE PARTITIONS <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br />1.2 SECTION INCLUDES <br />A. Operable Partitions: Manually operated Electric, center stacking, top supported operable <br />wall with panels hinged in groups of two for Community Room. <br />1.3 RELATED SECTIONS <br />A. Section 05 1200 – Structural Steel Framing: Steel carrier beams for operable partition top <br />track. <br />1.4 ACTION SUBMITTALS <br />A. Product Data: Material descriptions, construction details, finishes, installation details, and <br />operating instructions for each type of operable panel partition, component, and accessory <br />specified. Included data on acoustical performance, surface-burning characteristics, and <br />durability. <br />B. Shop Drawings: Show location and extent of operable panel partitions. Include plans, <br />elevations, sections, details, attachments to other construction and accessories. Indicate <br />dimensions; weights; conditions at openings and for storage; and required installation, <br />storage, and operating clearances. Indicate location and installation requirements for <br />hardware and track, and direction of travel. Show blocking to be provided by others. Include <br />the following: <br />1. Calculations: Calculate requirements for supporting operable panel partitions and <br />verify capacity of carriers and track components to support loads; indicate deflection <br />limits for partition and adjacent construction. <br />C. Setting Drawings: For embedded items and cutouts required in other work, including support <br />beam-punching template. <br />D. Coordination Drawings: Reflected ceiling plans, drawn to scale, on which the following items <br />are shown and coordinated with each other, based on input from installers of the items <br />involved: <br />1. Suspended ceiling components. <br />2. Structural members to which suspension systems will be attached. <br />3. Size and location of initial access modules for acoustical tile. <br />4. Items penetrating finished ceiling, including the following: <br />a. Lighting fixtures. <br />b. HVAC ductwork, outlets, and inlets. <br />c. HVAC controls. <br />d. Interface with laser system, lighting and shading controls. <br />e. Speakers. <br />f. Sprinklers.
The URL can be used to link to this page
Your browser does not support the video tag.