My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26 Civic Center Plz - REV 5 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Civic Center Plz
>
26 Civic Center Plz
>
26 Civic Center Plz - REV 5 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 4:36:18 AM
Creation date
9/12/2025 5:00:04 AM
Metadata
Fields
Template:
Plan
Permit Number
20181364
20184057
30146548
40138556
40139543
101117272
101117273
101117274
101117275
101117276
101117286
101120941
101121751
Full Address
26 Civic Center Plz
Street Number
26
Street Name
Civic Center
Street Suffix
Plz
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Santa Ana Public Library Renovation <br /> Group 4 Architecture Research + Planning, Inc. <br />RFI #121 – April 16, 2025 Group 4 Project No. 22575-01 <br /> <br /> <br />10 2226-2 OPERABLE PARTITIONS <br />g. Smoke detectors. <br />h. Access panels. <br />i. Ceiling fans. <br />E. Samples for Verification: For each type of exposed material, finish, covering, or facing <br />indicated, prepared on Samples of size indicated below: <br />1. Textile: Full width by not less than 36-inch- (914-mm-) long section of fabric from dye <br />lot to be used for the Work, with specified treatments applied. Show complete pattern <br />repeat. <br />2. Panel Edge Material: Not less than 3 inches (75 mm) long. <br />1.5 INFORMATIONAL SUBMITTALS <br />A. Submit acoustical test reports showing product conformance with ASTM E90 and <br />ASTM C423. <br />B. Seismic Qualification Certificates: For operable panel partitions, accessories, and <br />components, from manufacturer. <br />1. Basis for Certification: Indicate whether withstand certification is based on actual test <br />of assembled components or on calculation. <br />2. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate <br />and describe mounting and anchorage provisions. <br />3. Detailed description of equipment anchorage devices on which the certification is <br />based and their installation requirements. <br />C. Product Certificates: Submit letter signed by manufacturer certifying that operable walls to be <br />furnished on this project comply with the requirements of the specification. <br />D. Product Test Reports: From an independent testing agency indicating that each operable <br />panel partition complies with requirements. Submit the following: <br />1. Report for STC. <br />2. Proof load testing of track/trolley/bracket/hanger rod assembly. <br />3. Other proof load tests as may be identified in 'PART 2 of this Section. <br />E. Field Test Reports: Indicate and interpret test results for compliance with performance <br />requirements. <br />1. The City reserves the right to field sound test the operable wall within 60 days of the <br />date of Project Acceptance. Cost for field sound testing shall the responsibility of the <br />City. <br />1.6 CLOSEOUT SUBMITTALS <br />A. Operation and Maintenance Data: For operable panel partitions to include in maintenance <br />manuals. In addition to items specified in Division 1 Section "Operation and Maintenance <br />Data," include the following: <br />1. Panel finish facings and finishes for exposed trim and accessories. Include <br />precautions for cleaning materials and methods that could be detrimental to finishes <br />and performance. <br />2. Seals, hardware, track, carriers, and other operating components. <br />B. Warranty: Executed special warranty specified in this Section.
The URL can be used to link to this page
Your browser does not support the video tag.