My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10195685 - Permit
PBA
>
Building
>
Permits
>
E
>
Eastside Ave
>
525 N Eastside Ave
>
10195685 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2021 10:49:26 AM
Creation date
7/27/2021 10:49:25 AM
Metadata
Fields
Template:
Permit
Permit Number
10195685
Full Address
525 N Eastside Ave
Permit ID
238852
Master ID Number
2018-141696
Project Name
Miscellaneous Counter1 Permit
Street Number
000525
Street Direction
N
Street Name
Eastside
Street Suffix
Ave
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Building
Applied Date
2/27/2018
Issued Date
2/27/2018
Finalized Date
5/22/2018
Flood Zone
X-0602320163J
Description of Work
Install solar panels
Nature of Work
Solar
Document Relationships
10195685 - Plan
(Plan)
Path:
\Building\Plans\E\Eastside Ave\525 N Eastside Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
*,,SANTA <br />NA,'l'lill <br />I <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />wvyw.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL{l cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIOENCES Only <br />lnstructions: The licensed contractor of record shall fill in the address of the project, contracto/s <br />licensing information and answer questions 1 -10 below. Complete and sign the certification sectron <br />'*lf answering NO to any of the questions, plan check shall be required." <br />Project Address:525 Eastside Ave., Santa Ana, Ca 92701 <br />1 <br />Hosopo Corp DBA Honzon Solar Power <br />ContractorLicenseNumber. 1004233 <br />Are the following applicable to the proposed project? <br />Will the PV anay be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Wll the PV system \4/eigh maximum 3 pounds per square feet or less? <br />Wll the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2'minimum to 10" maximum between <br />the underside of modules and lhe surface of the rooP <br />Wll the PV system be installed without using any ballast system or counter-weight <br />syslem? <br />Wll the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />\Mll the PV system layout provide a three-foot wide clear access pathway per the <br />latest edition ol'Guideline for Fire Safety Elements of Solar Photovoltaic Systems" <br />YES NO <br />Eltr <br />Eu <br />Etr <br />Ettr <br />8tr <br />2 <br />3 <br />4 <br />5 <br />a trtr <br />s. &E <br />ro EIE <br />o Eltr <br />trtr7 <br />by OCFA? (Guideline available on the OCFA website httor//www ocfa. oro) <br />Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />Do the plans show a minimum ot 2-112 inch lag screw embedment into roof rafters? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturels PV support information.) <br />I certify under penalty of peFjury undef the laws of t <br />Print name: R \i; f , G'\\< * <br />he State of <br />Signature <br />Californ the above is true: <br />Phone Number: m qL(' lltv Dare <br />Email Address <br />Re\r Z17ln15 <br />Contractor Company Name:
The URL can be used to link to this page
Your browser does not support the video tag.