Laserfiche WebLink
*,,SANTA <br />NA,'l'lill <br />I <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />wvyw.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL{l cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIOENCES Only <br />lnstructions: The licensed contractor of record shall fill in the address of the project, contracto/s <br />licensing information and answer questions 1 -10 below. Complete and sign the certification sectron <br />'*lf answering NO to any of the questions, plan check shall be required." <br />Project Address:525 Eastside Ave., Santa Ana, Ca 92701 <br />1 <br />Hosopo Corp DBA Honzon Solar Power <br />ContractorLicenseNumber. 1004233 <br />Are the following applicable to the proposed project? <br />Will the PV anay be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Wll the PV system \4/eigh maximum 3 pounds per square feet or less? <br />Wll the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2'minimum to 10" maximum between <br />the underside of modules and lhe surface of the rooP <br />Wll the PV system be installed without using any ballast system or counter-weight <br />syslem? <br />Wll the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />\Mll the PV system layout provide a three-foot wide clear access pathway per the <br />latest edition ol'Guideline for Fire Safety Elements of Solar Photovoltaic Systems" <br />YES NO <br />Eltr <br />Eu <br />Etr <br />Ettr <br />8tr <br />2 <br />3 <br />4 <br />5 <br />a trtr <br />s. &E <br />ro EIE <br />o Eltr <br />trtr7 <br />by OCFA? (Guideline available on the OCFA website httor//www ocfa. oro) <br />Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />Do the plans show a minimum ot 2-112 inch lag screw embedment into roof rafters? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturels PV support information.) <br />I certify under penalty of peFjury undef the laws of t <br />Print name: R \i; f , G'\\< * <br />he State of <br />Signature <br />Californ the above is true: <br />Phone Number: m qL(' lltv Dare <br />Email Address <br />Re\r Z17ln15 <br />Contractor Company Name: