Laserfiche WebLink
*,SANTA <br />NA <br />Plt\\l\c <br />I l[Lol\[ <br />lCI\II <br />Planning & Building Agency <br />Building Safety Oivision <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.santa-ana.org <br />RESIDENT!AL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soLol cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall fill in the address of the project, contractois <br />licensing informatron and answer questions 'l -10 below. Complete and sign the certification section <br />"lf answering NO to any of the questions, plan check shall be required.'* <br />Project Address 525 Eastside Ave., Santa Ana, Ca 92701 <br />2 <br />J <br />Contractor Company Name:Hosopo Corp DBA Horizon Solar Power <br />ContractorLicenseNumber.'1004233 <br />6 trtr <br />Are the following applicable to the proposed project? <br />Wll the PV anay be flush mounted to lhe existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Wll the PV system vveigh maximum 3 pounds per square feet or less? <br />Vvill the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Wll the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV system layout provide a three-foot wide clear access pathway per the <br />latest edition ol -Guideline for Fire Safety Elements of Solar Photovoltaic Syslems" <br />trtr <br />by OCFA? (Guideline available on the OCFA website: htto://www.ocfa.o rq) <br />Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />Do the plans show a minimum of 2-112 inch lag screw embedment into roof rafters? <br />Are ALL the struclural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific sit e a n, PV layout, <br />anchorage spacing, anchorage details and manufacturei support information.) <br />YES NOtrtr <br />trtrtrtr <br />trtr <br />trtr <br />4 <br />5 <br />7 <br />8 ElE9 Etr <br />10 EE <br />I certify unde. penahy of perjury undqr the laws of the <br />Pnnr name: fi\an Lrt\\€t s <br />State of <br />ignature <br />if tt above as true: <br />Phone Number: <br />Email Address <br />Rev V17ln15 <br />lA Il'Date: 'L