My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1435 S Borchard Ave - Misc. Permit
PBA
>
Building
>
Permits
>
B
>
Borchard Ave
>
1435 S Borchard Ave
>
Misc.
>
1435 S Borchard Ave - Misc. Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2021 11:22:42 AM
Creation date
7/27/2021 11:22:21 AM
Metadata
Fields
Template:
Misc. Permit
Full Address
1435 S Borchard Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning & Euilding Agency <br />Building Safety Division <br />20 Civic Cente. Plaza <br />P.O. Box 1988 (M.19) <br />Santa Ana, CA92702 <br />(714) 647-s8oo <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMtLy RESIDENCES Onty <br />lnslructions: The licensed contractor of record shall complete all sections, answer the ten qu€stions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerino NO to anv of the ouestlons. olan check shall be reoulred. <br />soL-01 c8c 2016 <br />Project Address:1435 South Borchard Ave <br />Contractor Company Name: Vivint Solar <br />Contractor Licen5s 11um6s1; 973756 <br />YES NOtrtr <br />trtr <br />trtr <br />Are lhe following applicabl6 to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.'11 of the Califomia Fire Code, and is lhis shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the rooP <br />Will the PV system weigh maximum 4 pounds psr square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to '10" maximum between <br />the underside of modules and the surface of lhe roof? <br />Will the PV system be installed without using any ballast system or counter-weaght <br />system? <br />Will the anchors be installed wilh a maximum honzontal anchor spacing of 6 feet <br />and is this maximum horizontal spaclng shown on the plans? <br />Wilt the minimum 5/16" lag screws be installed wilh a minimum of 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the struclural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including proiect specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacture/s PV support information.) <br />2 <br />3 <br />6 <br />4 <br />5 <br />7 <br />8 <br />trtrtrtr <br />trtr <br />ED <br />tr <br />o trtr <br />10.atr <br />I cartlfyr under penalty of perjury under tho laws of the State of <br />print Name: Noemi Brito Signature: <br />phone Number: 7 1 4-872-U76 <br />Email Address: <br />Rev: 8/29/19 <br />noemi.brito@vivintsolar.com <br />g,71s. 4l22l2o <br />la that the true: <br />@-,'-^\_
The URL can be used to link to this page
Your browser does not support the video tag.