Laserfiche WebLink
Terminate the Unused End of the Cablea. Remove 60 mm (2.5") of the cable sheath from <br />the conductors. <br />-1 <br />b. Check that all terminator parts are present. <br />hex Wire <br />nut organizer <br />l l <br />c. Slide the hex nut onto the cable. <br />d. Insert the cable end all the way into the <br />wire organizer (up to the stop). <br />e. Attach the cap. <br />bend wires down <br />- into recesses of wire <br /> organizer and <br />trim to length <br />. place cap over <br />the wire organizer <br />1 - ho/d the cap <br />·. . 77 with the of/scon- <br />ned tool or a #2 <br />screwdriver <br />d'' j! 19 ,rotate the hex nut <br />1 21,0- with your hand or.> N.»\01 a wrench until the <br />latching mechanism <br />meets the base-do <br />not over torque <br />f. Attach the terminated cable end to the PV <br />racking with a cable clip or tie wrap. <br />0 <br />0/%53/6 ) <br />Connect the Cable to the AC Junction Box <br />Connect the cable into the AC branch circuit <br />junction box. See notes in Step Detai/s on back. <br />Complete the Installation Map <br />Build the map manually, or you can use the <br />ArrayGun feature from the Enphase Installer Toolkit <br />to build the system. For more information, go to <br />http://enphase.com/products/arravgun/. <br />To manually build the map, peel the removable se- <br />rial number label from each microinverter and affix <br />ill to the respective location on the map included <br />with this guide. <br />-/ =2==LIZE-serial - <br />number <br />/abets -1-1 <br />Connect the PV Modules <br />a. Mount the PV modules above the microinverters. <br />b. Connect the DC leads of each PV module to <br />the DC input connectors of their corresponding <br />microinverter. <br />60-cell PV <br />module <br />verify <br />polarity on <br />at least one <br />unit pair <br />Of'J <br />cap <br />0 <br />Never unscrew the hex nut. This action <br />can twist and damage the cable. <br />. <br />-4