Laserfiche WebLink
Installation Instructions <br />* Use for vertical adjustment when leading edge of flashing hits nails in upper shingle courses <br />1. Slide flashing up undershingles until leading edge <br />engages nails. Measure remaining distance to adjust <br />upslope. <br />A Nails beneath shingle <br />2. Remove flashing and cut V notch at marks where nail shafts <br />engaged leading edge of flashing the distance desired in Step 1. <br />Notch depth not to exceed 2" length by 1/2"width. <br />Placement of"V" notchA <br />2314¢U <br />tr <br />3. Reinstall flashing with notched area upslope.4. Position notched leading edge underneath nail heads as shown. <br />5 <br />877-859-3947 Committed to the Support of Renewable Energy ©Ecofasten Solar'All content protected under copyright. All rights reserved, 04/8/14