My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
40130574 - Permit
PBA
>
Building
>
Permits
>
B
>
Bristol St
>
2830 S Bristol St
>
40130574 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 9:39:54 AM
Creation date
7/28/2021 9:39:43 AM
Metadata
Fields
Template:
Permit
Permit Number
40130574
Full Address
2830 S Bristol St
Permit ID
224583
Master ID Number
2016-132727
Project Name
Aldi Market TI
Street Number
002830
Street Direction
S
Street Name
Bristol
Street Suffix
St
Building Use Code
Retail/Service
Job Types
Tenant Improvement
Permit Type
Mechanical
Applied Date
11/8/2016
Issued Date
6/29/2017
Finalized Date
11/29/2017
Flood Zone
X-0602320259J
Description of Work
Note: Walk-in coolers are not part of this plan check and will require a separate permit
Nature of Work
TI
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
]IITG I <br />Corporata <br />2992 E La PllnF Av.- Slo. A <br />Anahei& CA 92806 <br />Tel:714.63219S <br />F er'. 711.632.2971 <br />Oiipatch: 8OO.491.2990 <br />&n Dicgorlmperirl Cour y <br />6295 Ferrb Squ.ro $o. C <br />San Oielo. CA 92121 <br />Tel: 856.537.3999 <br />Fax:8s8.537.3SO <br />Oispatch: 888.8.44.50@ <br />Indio <br />4,19 7 Gof C.ntor Phvy., ste.1 <br />lr&. CA 92201 <br />f ot 7fi.U2A6n <br />F.r:760.342.4525 <br />Dqpebh: EOO.491 .2990 <br />lnland Empire <br />1i1467 Ueridi.n Ptwy., Bldg 2A <br />RivorsH€. CA 9251E <br />Tel: 951.653-,l(m <br />Frx: 51.ei3.4666 <br />Oisp.tch: 800.,191.29S <br />MrcL PRoJECTI: 5f03A19 <br />Permit* 10191322-17509 <br />RoportrSPage 1of I <br />Sral lrEpedixl Repsb mud b dEffirted b he pdtr€s lded beb., wihm 14 daF d l}E rEpedirn. Reports d non-comp6ant condRtoars mird be d6turted FnmedEtely <br />Separate teoods $Ell be preDar€d f(r each type d specal ansDedrq| on a daily hir Edr repat shall be cooplebd ard sroned by the special i69€dor cDrdudrrg lhe <br />THE WORK WAS WAS NOT THE INSPECTED MET DID NOT MEET <br />lnsp.clcd ln ac{ord8ncs rdth thq requiremenb ofthe DSI'/OSPHO/ <br />PROJECT approved do(,rm6nts. <br />TtE requiremenls of the PROJECT documentB <br />Sampbs taken: <br />VVbather: <br />MATERIAL SAMPLING WASE WASNOTE N/A E <br />Performod in acaordanca with DSA,/OSPHD,,PROJECT tppoved documentg <br />Clear lemp: 86 f <br />sigmture ot Spedal lnsp€dor <br />Maged Saad <br />DA]LY INSPECTION <br />REPORT <br />osA/crrY Flh t _ <br />OSAiOSHPD Appl. t. <br />DST./LEA <br />' <br />- <br />Proiect Archrtcct <br />Studurdl Engineer <br />DSA R.gion6l Offic. <br />Sdlool ohtrid <br />Conlroador <br />Euilding OeFdmern <br />C ertilication *: 1CC"8457479 <br />?+ <br />PRoJECT NAME: Aldi Mor Store # 34 Date: 08130/2017 <br />ARcnlTEcT: AFD TIME ARRIvEDi 7:30 AM rrrre oeeanreo. 2:30 PM <br />LUNCH IIME: .ENGINEER: B&B AssociAtes TRAVEL TIME: <br />coNTRACToR: ED GRUSH SUB CONTRACTOR <br />INSPECTION ADDRESS ADDRESS oF PRoJECT: 2830 S. Bristol St, Santa Ana, Ca <br />TYPE OF INSPECTION <br />E ENGINEEREo FILL <br />E FoUNDATIoN <br />D BACK F|LL <br />E] BATCH PLANT <br />D PT coNcRETE <br />E SHoTcRETE <br />E coNcRETE <br />atrtr <br />E sHoP WELD <br />MASONRY <br />HIGH STRENGTH BOLTINC <br />VI'ELOING <br />trtro <br />E NDE sHoP <br />FIREPROOFING <br />ANCHOR/I]OWEL <br />NDE FIELO <br />CEILING vvlRED <br />D <br />DSA/OSHPD PRO.IECT <br />APPROVED DOCUMENTS <br />AVAILAALE APPROVED <br />PLANSYENE <br />SOILREPORTYEND SPECS:YEfNEI <br />APPROVEO SHOP DRAWING Y E N EI <br />MATERIALS USED BY CONTRACTOR (INCLUOE RESEARCH REPORT No. OR ttATERIAL TEST REPORTS): Nonrlal V\blght Concrele, HH3reds Mix <br />EOEUIPiIENT USEO SY CONTRACTOR: <br />ri\oRK AREA Foundation Floor <br />lnspected the laying up of 8" & 12" CMU wall in the following locations: <br />On grid line A between line 7 and 7.4 from Foundation level for 8 courses in average. <br />On grid line 7.4 between line A and A.8 from Foundation level for 8 courses in aveEige. <br />lnspected masonry unit for conformance to specification and Code. <br />lnspected masonry mortar for proper mixing and handling. <br />lnspected reinforcing steel for size, grade, type, lab splice, secured locations and clearcnce <br />All above work is still in progress as per approved plans and code. <br />REWORK AS PERCENT OF ALL WORK TOOAY: oon PERCENT PROJECT COMPLETE
The URL can be used to link to this page
Your browser does not support the video tag.