Laserfiche WebLink
TUITG t <br />Coaporata <br />2SS2 E Lr P.ln Aw. Ste. A <br />Anah.irr cA 92E06 <br />Tel:7r4.8,22999 <br />Fax:7'14.eBz2€71 <br />Dbp€tch: 8U).tl912SrO <br />S.n Dicgorlmpcri.l County <br />6295 F.rris Sqr.ro sle. c <br />San Oiego, CA g2l2'l <br />Tol: 85E.537.3999 <br />Fax: tl5g.537.3BO <br />Dhpatdr: 886.E44.5o.x) <br />Irdb <br />44817 Go{ C€nEr tl(wy., Sle.l <br />tdb, cA 9?201 <br />l.L 7@.312.6n <br />Fzt T@342.1# <br />t)isprEi: o(x)./r91.2so <br />lnland Emplre <br />I ,t4g/ M.rilbn PtYry.. Bldg 2A <br />Rivoxih. CA 92518 <br />Tol: 951.63-,199) <br />Fax: 951 .65:r.4666 <br />Dispetdr: aq).49r.2s <br />MrcL PRoJECT': 5103A19 <br />P.",fl. I0l91322-17509 <br />R.pojrt1P.9. 1of 1 <br />Speqal lnspectm Reporb musi be disfituted b tle Frties lisl€d b€b/v wifin 11da)6 dthe insdh Reports d nm{ompNant coodiths mLd be d6tibuted immedialely <br />Separdte rcF.ts shatl be pGpar€d hi e&h lyF of sp€oal an6pedbn on a dsily b6l5. Esdr epon shal De ctmpleH 6m 90ned !ry Ule 6peclal anspedo. co.xnrdilE lhe <br />THE WORK WAS WAS NOT MET OID NOT MEET <br />lnspec{ed in accordance with tllo rcquirsments of the DSA/OSPHD/ <br />PROJECT approved docrjmenta. <br />Th€ requirements ofthe PROJECT documenE <br />S.mpL! t.kcn: <br />Vl/EatheI: <br />MATERIAL SAMPLING WASO WAS NOTE] N/A EI <br />Perform€d in accDrdsnce wl$ oSA/OSPHD/PRoJEcT aPp{oved doqrm€nti <br />Clear remp: 86 f <br />DAILY INSPECTION <br />REPORT <br />DSATCIIY Fil6 * <br />- <br />OSATOSHPO APpl. t <br />DSA'LEA ' <br />- <br />cc <br />Signsture ol Special lnsPector <br />Maged SaadContractor <br />BLilding Deparbnetn <br />olN,trer <br />Proied Arrhitecl <br />Slrudtral En€inect <br />DSA Regk nal Ofic. <br />SchoolDhlrict <br />Prlnr <br />certlllcatlon r: ICC+4574 <br />Vedfed <br />Date: 08/2912017PROJECT NAME: AIdi MOT STOTE # 34 <br />TIME DEPARTED: 3;00 PMTIME ARRIVED O8:OO AMARCHITECT: APD <br />LUNCH TIME: .TRAVEL TIME:ENGTNEER: BEB AsSOCiAtES <br />SUB CONTRACTORcoNTRAcToR: ED GRUSH <br />ADDRESS oF PRoJECT: 2830 S. Bristol St, Santa ADa CAINSPECNON AODRESS: <br />EI NDE FIELD <br />E NOE SHOP <br />FIREPROOFING <br />ANCHOR/OOWEL <br />CEILING \MREtrtr <br />Dtr <br />oootr <br />EATCH PLANT <br />PT CONCRETE <br />SHOTCREIE <br />CONCRETE <br />MASONRY <br />HIGH STRENGTH AOLTING <br />WELDII'IG <br />SHOP WELD <br />trtr <br />EItroo <br />TYPE OF INSPECTION <br />O ENGINEERED FILL <br />FOUNDATIOI{ <br />BACK FILL -sFEES'YETIT <br />APPROVED SHOP DRAWINCY E N ESOIL REPORT Y ff N f]DS!/OSHPO PROJECT <br />APPROVEO DOCUMENTS <br />AVAILABLE APPROVED <br />PLANSYEINE <br />MATERI,ALS USiD BY.ONTRACTOR ONCLUDE RESEARCH REPORT I'IO, OR MATERIALTEST REPORTS) <br />EoEUtptrrENr USEO By CoNTRACToR: BOOm lift, Hamess, Ghipping hammers, Wire brush and welding machines. <br />vroRK AREA First FlOor rOOf <br />t{ornral u,oigti Concrete, tIlcrade Mix <br />Completed welds were visually inspected in the following locations: <br />-Reinforcing joist between lines [& ! a nd lines 5.2 and 7 to angel and L/2" rod as per detail C2 on sheet # <br />5-405 !Joists were completed from one side ( axe D side). <br />Welds were inspected for size, length, location and free of visible defects. <br />All welding was performed as per approved plans and code. <br />Verified welders certificates as: Jeffery Rodgers license #PSF 044 Boris Quinanilla AWS and Divan Michell <br />license # PSF 149. <br />All work detailed above is still in progress as per approved plans and code' <br />PERCENT PROJECT COMPLETE:REWORK AS PERCENT OF ALL WORK TODAY: 0%