My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
40130574 - Permit
PBA
>
Building
>
Permits
>
B
>
Bristol St
>
2830 S Bristol St
>
40130574 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 9:39:54 AM
Creation date
7/28/2021 9:39:43 AM
Metadata
Fields
Template:
Permit
Permit Number
40130574
Full Address
2830 S Bristol St
Permit ID
224583
Master ID Number
2016-132727
Project Name
Aldi Market TI
Street Number
002830
Street Direction
S
Street Name
Bristol
Street Suffix
St
Building Use Code
Retail/Service
Job Types
Tenant Improvement
Permit Type
Mechanical
Applied Date
11/8/2016
Issued Date
6/29/2017
Finalized Date
11/29/2017
Flood Zone
X-0602320259J
Description of Work
Note: Walk-in coolers are not part of this plan check and will require a separate permit
Nature of Work
TI
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TTIIG <br />Copor.tc <br />2992 E L. PrlrrE Av!. Sto- A <br />tu.h€im. CA 92806 <br />Tel: 71,1.632-2sog <br />F.\: 714.6ts2.297 4 <br />Oisp.tdr: 800.491.28O <br />lnl.nd Einplr. <br />1446-/ Mcririln Pklrry.. Brdg 2A <br />RiversiJo, CA92518 <br />Tel: 95i.e53.4999 <br />F.x: 95'l .653..1686 <br />Oispotch: 8(x).49'l -299) <br />S.n Oicgorl lrpcrial County <br />4295 Ferris Sqlaro sto. C <br />San D.Oo. CA 92121 <br />Tel: 456.537.3999 <br />Fax:858.537.399() <br />Oispotct: 8aa.E44.5O6O <br />DAILY INSPECTION <br />REPORT <br />lndb <br />14917 Gor C€rbr Phry., St.. t <br />lndb, CA 92201 <br />felT@i12.6n <br />Fzx'-7€x).342.4525 <br />Ctrspobh: d)O.,*91.29) <br />MTGL PRoJEcTt: 54{t3A1 9 <br />Pemrit c 10191322-17509 <br />Reporl a ![ Page I ot 1 <br />Speqal lnspeaton Repo.ts mud be dsfrituled b <br />Sep€r-ate repo,ls $alt be grpered far ea.n l}.!e <br />THE WORK WAS WAS NOT <br />ProjEct Architect <br />Strualulal Enginoor <br />OSA Reglon6l Ofilce <br />Sdrool Oisirid <br />f]:Il:s-5!1!ry *Tin 1 4 dayEla tlE n6p€dbo. Repo.t6 o, mcc.rnptiad cddtnrB mun D€ clgErured anmffi{yq 6p€oat nspecnon on a at6iy hlls Ead rEF.t sh.I becompteted and gln€d by th€ specbtnEpedd.o.d,-di.lo the <br />DSA,ICITY File + _ <br />OSA/OSHPO Appl- t. <br />DSA/LEA <br />' <br />- <br />THE WORK INSPECTED MET DID NOT MEET <br />Clear temp: 77 t <br />Sigr|ature Special lnspsctor <br />Maged Saad <br />Print <br />Ce.tifc€tion *: ICC-84574 <br />Ven[€d <br />dt- <br />lrBpecled in accgrdEnce with the r.qui.msnts of th. OSA/OSPHD/ <br />PROJECT approved documenB. <br />Th. r8qua.Ements ot the PROJECT docJm€ltE <br />Sampbs taken: <br />V\bathcr: <br />MATERIAL SAMPLING WASE WAS NOT[] N/A EI <br />Performod in accordance wth DSA/OSpHO/PROJECT appoved docunrenb.I <br />ContEcIor <br />Bullding Dep6rtnont <br />PRoJECT NAME: Aldi Mor Store # 34 oate: OBl29l2O17 <br />ARCHITECT: APD Architecture TIME ARRTvED. 7:30 PM TrME oEPARTED: 2:30 PM <br />ENGINEER B&B Associates TRAVEL TIME LUNCH TIME: - <br />CONTRAcToR: ED GRUSH SUA CONTRACTOR <br />INSPECTlON ADDR ADORESS OF PROJECT; 2830 S Brisu St, Santa Ana, <br />BACK FILL <br />TYPE OF INSPECTIOII <br />E ENGINEERED FILL <br />E FoUNDATToN <br />BATCH <br />PT CONCRETE <br />El sHorcRETE <br />CONCRETE <br />HIGH STRENGTH EOLTING <br />VVELDING <br />SHOPWELO <br />ANCHOR/DOWEL <br />FI NG <br />E NDE FIELD <br />E NDE SHoP <br />CEILING VURE <br />tr <br />APPROVED OOCUMENTS <br />PROJECT <br />PLANS Y N <br />AVAILABLE APPROVEO SOIL REPORT Y N <br />APPROVED SHOP ORAW|NG Y N <br />EOEUIPMENT USED BY CONTRACTOR: <br />l,,voRK AREA: First Floor <br />LUOE R HR NO, OR MATERIAL REPORTS)r NonnaI l,i\r€igtrt Concret€,MATERIALS USED CON <br />15 Cubic yard concrete 2,000 PSI in loadine Dock area in the following <br />24" thick concrete under footing on grid lines 7.g between lines 8.6 to C.6 <br />All areas of concrete placement were clean of all deleterious materials. <br />Concrete was mechanically vibrated. <br />All concrete placement insPected and detailed above has been completed as per approved plans and <br />code. <br />lnspected the placement of <br />locations: <br />EWOR KR PAS CEER oNT F ALL RWO TOK YDA ovo PERCENT PROJECT COMPLETE
The URL can be used to link to this page
Your browser does not support the video tag.