Laserfiche WebLink
#1 <br />0 <br />1 <br />4 <br />5 <br />4 <br />- <br />1 <br />- <br />D <br />N <br />- <br />W <br />- <br />B <br />O <br />- <br />2 <br />0 <br />2 <br />2 <br />60 <br />0 <br /> <br />W <br />. <br /> <br />S <br />a <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br /> <br />B <br />l <br />v <br />d <br />. <br />, <br /> <br />S <br />u <br />i <br />t <br />e <br /> <br />1 <br />1 <br />1 <br />Sa <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />1 <br />FK <br />C <br /> <br />S <br />E <br /> <br />O <br />r <br />a <br />n <br />g <br />e <br /> <br />C <br />o <br />u <br />n <br />t <br />y <br />Pr <br />o <br />p <br />o <br />s <br />e <br />d <br /> <br />D <br />i <br />a <br />l <br />y <br />s <br />i <br />s <br /> <br />C <br />l <br />i <br />n <br />i <br />c <br /> <br />f <br />o <br />r <br />: <br />CA-530 <br />11.5.25 <br />Revisions <br />Dustin Curtis <br />Principal: <br />dustin.curtis@onearchitecture.us <br />James Farrell <br />Senior Project Manager: <br />james.farrell@onearchitecture.us <br />100% Construction Documents <br />8686 N. Central Avenue <br />Suite 166 <br />Phoenix, Arizona 85020 <br />Phone: 602.266.2712 <br />www.ONEa rchitecture.us <br />ARCHITECTURE <br />Sheet Name: <br />Sheet Number: <br />11.5.25 <br />Specifications <br />Santa Ana, CA 92701 <br />600 W. Santa Ana Blvd., Suite 111 <br />FKC SE Orange County <br />SEE SPECIFICATIONS BOOKLET FOR ADDITIONAL IMPORTANT INFORMATION RELATING TO BUILDING CODES, CITY ORDINANCES, MATERIALS, AND <br />METHODS. <br />DIVISION 1 - INSTRUCTIONS TO BIDDERS <br />1. THESE DOCUMENTS ARE TO BE BID AS AN ENTIRE PACKAGE. NO CONSIDERATION WILL BE GIVEN TO THE CONTRACTOR/SUBCONTRACTORS <br />FOR ITEMS OMITTED DUE TO BIDDING OF PARTIAL DOCUMENTS. <br />2. VISIT THE SITE BEFORE SUBMITTING YOUR FINAL BID. NO CONSIDERATION WILL BE GIVEN TO THE CONTRACTOR/SUBCONTRACTORS FOR ITEMS <br />OMITTED DUE TO LACK OF KNOWLEDGE OF EXISTING UNCONCEALED SITE CONDITIONS. <br />3. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS ALWAYS TAKE PRECEDENCE OVER THE SCALE OF A DRAWING. <br />4. INCLUDE IN YOUR BID THE FOLLOWING ADDITIONAL ITEMS: <br /> A. ITEMS TO BE REMOVED IN ORDER TO COMPLETE THE PROJECT. REFER TO DIVISION 2. <br /> B. ITEMS TO BE RELOCATED IN ORDER TO COMPLETE THE PROJECT. REFER TO OTHER DIVISIONS WITHIN THESE SPECIFICATIONS. <br />5. IF YOU SHOULD FIND APPARENT CONFLICTS IN, OR OMISSIONS FROM THESE DOCUMENTS OR BE IN DOUBT AS TO THEIR MEANING, CONTACT <br />ONE ARCHITECTURE IN WRITING PRIOR TO SUBMITTING A FINAL BID. <br />6. THE CONTRACTOR SHALL GIVE ONE ARCHITECTURE 48 HOURS TO RESEARCH AND REPLY TO ALL QUESTIONS. ONLY WRITTEN RESPONSES <br />FROM ONE ARCHITECTURE SHALL BE CONSIDERED VALID CHANGES TO THE SCOPE OF WORK. <br />CONTRACTOR'S RESPONSIBILITIES <br />1. THE CONTRACTOR SHALL FILE FOR ALL REQUIRED INSPECTIONS WITH ALL APPLICABLE AGENCIES. <br />DIVISION 17 - ACCESSIBILITY REQUIREMENTS <br />1. ALL WORK SHALL COMPLY WITH THE AMERICANS WITH DISABILITIES ACT ARCHITECTURAL GUIDELINES (ADAAG) AND ANSI STANDARDS A-117.1, <br />LATEST EDITION. <br />2. ALL THRESHOLDS SHALL BE A MAXIMUM 1/2" HEIGHT AND BEVELED. <br />3. ALL DOOR HANDLES SHALL BE LEVER TYPE. CENTER OF LEVER TO BE INSTALLED 36" ABOVE FINISH FLOOR. <br />4. LAVATORY FAUCETS SHALL BE LEVER TYPE. <br />5. FLUSH CONTROL VALVE AT WATER CLOSET SHALL BE ON THE WIDE SIDE OF THE CLOSET AND MOUNTED AT NO GREATER THAN 42" ABOVE THE <br />FINISH FLOOR. <br />FKC Location # 101454-1-DN-W-BO-2022 <br />TYPE OF PROJECT: <br /> DENOVO RELOCATION EXPANSION RENOVATION OTHER <br /> GREENFIELD NOCTURNAL ABOVE HABITABLE SPACE <br />FACILITY ROOM SPACE STANDARDS <br />STANDARD SPECIFICATIONS <br />RECS DOCUMENT REVISION DATE <br />STANDARD DETAILS <br />FKC FAMILY OF EXTERIOR SIGNAGE <br />COLOR & MATERIALS SELECTION FORM <br />CONTRACT DOCUMENT CHECKLIST <br />I DUSTIN CURTIS, ARCHITECT OF RECORD CERTIFY THAT TO THE BEST OF MY <br />KNOWLEDGE AND BELIEF, I HAVE INCORPORATED TO THE FULLEST EXTENT <br />PRACTICAL THE LATEST REVISION OF RECS DOCUMENTS, AS NOTED ABOVE, <br />INTO THE CONTRACT DOCUMENTS; AND THAT I HAVE REVIEWED THE <br />CONTRACT DOCUMENTS TO ENSURE THAT THEY MEET THE REQUIREMENTS <br />OF RECS CONTRACT DOCUMENT CHECKLIST, WHICH IS AVAILABLE UPON <br />REQUEST. <br />______________________________________ ____________ <br />NAME DATE <br />CERTIFICATION THAT THE CONTRACT DOCUMENTS <br />CONFORM TO FRESENIUS KIDNEY CARE'S <br />DIALYSIS CLINIC STANDARDS <br />NFPA 101, LIFE SAFETY CODE 2012 <br />CERTIFICATION <br />IF REQUIRED TO COMPLY, <br />I DUSTIN CURTIS, ARCHITECT OF RECORD CERTIFY THAT, TO THE BEST OF MY <br />KNOWLEDGE AND BELIEF, THE CONTRACT DOCUMENTS COMPLY WITH NFPA 101, <br />LIFE SAFETY CODE, CHAPTER 20 OR 21 AND ALL REFERENCED NFPA SECTIONS <br />AND CODES. <br />NAME DATE <br />FKC Certification <br />CMS Certification <br />THESE PLANS ARE ISSUED FOR BIDDING AND PERMITTING. FINAL PLANS FOR <br />CONSTRUCTION WILL BE ISSUED AFTER APPROVAL BY ALL GOVERNING AGENCIES. <br />AGENCY ITEMS AND ADDENDA ITEM, IF ANY, WILL BE ADDED TO FINAL PLANS AND <br />WILL BE PROPERLY NOTED AS SUCH. <br />Status of Documents <br />Project Scope of Work <br />THIS PROJECT IS AN TENANT IMPROVEMENT PLANS OF A SUITE IN AN EXISTING SHELL <br />BUILDING FOR A NEW DIALYSIS AND RENAL FACILITY FOR FRESENIUS KIDNEY CARE, INC. <br />THE PREVIOUSLY IN THIS SUITE WAS THE ORANGE COUNTY PUBLIC DEFENDER OFFICE. <br />THIS PROJECT ON THE FIRST FLOOR OF AN 11 STORY OFFICE BUILDING AND WILL <br />PROVIDE KIDNEY DIALYSIS SERVICES TO 37 PATIENTS PER SHIFT WITH UP TO 3 SHIFTS A <br />DAY. THE CLINIC IS OPEN MONDAY - STAURDAY, 6 AM TO 6 PM. <br />THE PROJECT INCLUDES EXTERIOR RAMP, NEW ENTRY WITH STORM DRAINAGE, A NEW <br />PATIENT DROP OFF ALONG 3RD STREET, A NEW 3 INCH WATER LINE AND METER. <br />INTERIOR WORK TO HOUSE 37 STATIONS, A DOCTOR'S OFFICE/EXAM ROOM, A <br />CONFERENCE ROOM, AND VARIOUS OTHER SUPPORT OFFICES. <br />THIS PROJECT WILL NOT HAVE A ATS AND A CAMLOCK ON SITE. THIS SCOPE AS BEEN <br />REMOVED FROM THE PROJECT <br />About this project... <br />THIS PROJECT IS A TENANT IMPROVEMENT PROJECT OF AN EXISTING SHELL SPACE. <br />PROPOSED WORK INCLUDES: <br />DEMOLITION:- INTERIOR RAMPS, STOREFRONTS, EXTERIOR SIDEWALK, AND REQUIRED. <br />IMPROVEMENTS AS NECESSARY, SEE DIVISION 2 OF SPECIFICATIONS. <br />EXTERIOR:- RAMP, DOORS, SIDEWALK , WALLS. ALL EXTERIOR SIGNAGE UNDER <br />SEPARATE PERMIT. <br />INTERIOR:- NON-LOAD BEARING INTERIOR PARTITIONS <br />- ROOM FINISHES TO INCLUDE PAINT, FLOORING, CEILINGS, AND WALL <br />FINISHES. <br />MECHANICAL:- DISTRIBUTION OF AIR INCLUDING DUCTWORK AND REGISTERS. <br />PLUMBING:- RESTROOMS FIXTURES, SINKS, MOP SINKS, AND DRINKING FOUNTAIN. <br />ELECTRICAL:- OUTLETS FOR GENERAL USE <br />- LIGHT FIXTURES <br />- ELECTRICAL PANELS <br />FIRE SPRINKLER:- NOT INCLUDED UNDER THIS PERMIT. SEE GENERAL NOTES THIS <br />SHEET. <br />FIRE ALARM:- NOT INCLUDED UNDER THIS PERMIT. SEE GENERAL NOTES AND <br />DEFERRED SUBMITTAL THIS SHEET. <br />ATS & CAMLOCK: REMOVED FROM THE PROJECT. <br />(SEE PLANS FOR FULL DESCRIPTION OF WORK) <br />Project Team Project Information <br />600 W. SANTA ANA BLVD.,SUITE 111, CA 92701 <br />I-A, FULLY SPRINKLED PER NFPA-13 <br />B - BUSINESS <br />11,859 s.f. <br />ADDRESS: <br />SUITE AREA: <br />EXISTING OCCUPANCY TYPE: <br />OCCUPANT LOAD: <br />CONSTRUCTION TYPE: <br />4EXITS PROVIDED: <br />EXITS REQUIRED:2 <br />'B' BUSINESS AREA <br />BUSINESS AREAS: 3,076/ 150 = 20.51 <br /> INSTITUTIONAL - OUTPATIENT: 6,158 / 100 = 61.58 <br />ASSEMBLY - UNCONCENTRATED: 783 / 15 = 52.20 <br />TOTAL 134.29 USE 135 <br />'S-2' STORAGE AREA <br />STORAGE:1842 / 300 =6.14 <br />TOTAL 6.14 USE 7 <br />TOTAL (ENTIRE SUITE): 142 <br />ONE ARCHITECTURE, PLC. <br /> DUSTIN CURTIS - ARCHITECT OF RECORD <br /> JAMES FARRELL - SR. PROJECT MANAGER <br /> 8801 N. CENTRAL AVENUE, SUITE 101 <br /> PHOENIX, ARIZONA 85020 <br /> PHONE: 602.266.2712, EXT. 104 <br /> FAX: 602.266.1688 <br />SUTTON ENGINEERING, LLC <br />MECHANICAL / PLUMBING / ELECTRICAL <br /> 5600 TENNYSON PARKWAY <br /> SUITE 240 <br /> PLANO, TX 75024 <br />CARUSO TURLEY SCOTT INC. - <br />STRUCTURAL ENGINEERING <br /> 1215 WEST RIO SALADO PARKWAY <br /> SUITE 200 <br /> TEMPE, ARIZONA 85281 <br />G&G ENGINEERING - <br />CIVIL ENGINEERING <br /> 1251 N. MANASSERO STREET <br /> SUITE 402 <br /> ANAHEIM, CA 92807 <br />FRESENIUS KIDNEY CARE, INC. - CLIENT <br /> TOM CASTELLANI - SR. PROJECT MANAGER <br /> 1340 S. DAMEN <br /> SUITE 100 <br /> CHICAGO, IL 60608 <br /> PHONE: 312.385.9728 <br />Site Location Plan - NTS <br />Vicinity Map - NTS <br />General Notes <br />A. INTERIOR WALL AND CEILING FINISHES MUST COMPLY WITH CLASS A FIRE/SMOKE DEVELOPMENT IN SPACES LEADING TO AN EXIT AND ENCLOSED <br />CORRIDORS, AND CLASS A IN OFFICES. SUBMIT RECORDS AND DOCUMENTATION OF MATERIALS FIRE/SMOKE DEVELOPMENT CLASSIFICATION AT <br />SUBMITTAL PHASE AND FOR THE OWNER'S CLOSE OUT RECORDS. <br />B. FIRE CAULKING SHALL BE PERFORMED AND CERTIFIED BY A SINGLE SOURCE CONTRACTOR FOR PENETRATIONS OF STRUCTURAL, <br />MECHANICAL,ELECTRICAL, AND ARCHITECTURAL ELEMENTS. <br />C. SITE IMPROVEMENTS, LANDSCAPING, PARKING, SHELL STRUCTURE, WATER AND SEWER MAIN LINES, AND ELECTRICAL DISTRIBUTION ARE <br />EXISTING SYSTEMS AND ARE TO BE MODIFIED ONLY TO THE EXTENT SHOWN IN THESE DOCUMENTS. <br />D. ALL PRODUCTS LISTED BY ICBO NUMBERS SHALL BE INSTALLED PER THE REPORT AND MANUFACTURER'S WRITTEN INSTRUCTION. PRODUCT <br />SUBSTITUTION FOR PRODUCTS LISTED SHALL ALSO HAVE AN ICBO APPROVED EVALUATION REPORT OR BE APPROVED AND LISTED BY OTHER <br />NATIONALLY RECOGNIZED TESTING AGENCIES. <br />E. FIRE SPRINKLER APPROVALS ARE NOT INCLUDED UNDER THIS PERMIT. BEFORE COMMENCING ANY WORK ON THE SPRINKLER SYSTEM, PLANS <br />MUST BE SUBMITTED TO AND APPROVED BY THE BUILDING DEPARTMENT. THE SYSTEM MUST BE INSPECTED AND APPROVED BY THE BUILDING <br />DEPARTMENT PRIOR TO A CERTIFICATE OF OCCUPANCY. <br />F. FIRE ALARM SYSTEM APPROVALS ARE NOT INCLUDED UNDER THIS PERMIT. BEFORE COMMENCING ANY WORK ON THE ALARM SYSTEM, PLANS <br />AND CUT SHEETS MUST BE SUBMITTED TO AND APPROVED BY THE BUILDING DEPARTMENT. THE SYSTEM MUST BE INSPECTED AND APPROVED BY <br />THE BUILDING DEPARTMENT PRIOR TO A CERTIFICATE OF OCCUPANCY. <br />How to read these plans. <br />THESE PLANS ARE DRAWN USING A LEGEND FORMAT. THE LEGENDS ON EACH SHEET <br />EXPLAIN THE MANY SYMBOLS USED THROUGHOUT THE PLANS. <br />A SYMBOL SHOWN IN A LEGEND DOES NOT NECESSARILY MEAN THAT THE ITEM OCCURS <br />WITHIN THE SCOPE OF THIS PROJECT. REVIEW THE PLANS AND SPECIFICATIONS <br />CAREFULLY TO DETERMINE THE COMPLETE SCOPE OF WORK. <br />JANUARY 2021 & MAY 2023 <br />T-1.0 <br />Title Sheet <br />Date: 1.23.25 <br />10.30.23 <br />10.30.23 <br />N <br />FKC - Project Responsibility Schedule (AG-19 & AG19a) <br />SANITARY SEWER LINE TO BUILDING <br />PRIMARY POWER TO BUILDING <br />CITY WATER SUPPLY TO BUILDING <br />BACKFLOW PREVENTER-DOMESTIC WATER <br />EXIT LIGHTING-EXTERIOR <br />HVAC UNITS <br />GAS SUPPLY TO HVAC UNITS <br />TENANT DEMISING WALL <br />EXTERIOR DOORS <br />AUTOMATIC TRANSFER SWITCH <br />MAIN DISTRIBUTION PANEL <br />SITE LIGHTING <br />PORTE COCHERE <br />WALL INSULATION <br />DUMPSTER <br />UNDERSLAB PLUMBING <br />SLAB <br />SPRINKLER SERVICE, RISER, BRANCH LINES <br />EXIT LIGHTING & SIGNS-INTERIOR <br />FIRE ALARM SYSTEM <br />HVAC DUCTWORK AND DAMPERS <br />BACKFLOW PREVENTERS-PROCESS WATER <br />EMERGENCY WATER CONNECTION <br />PROCESS WATER HEATER <br />DOMESTIC WATER HEATER <br />TEMPERATURE CONTROL SYSTEM <br />LIGHT FIXTURES <br />PLUMBING FIXTURES <br />STAFF LOCKERS <br />DATA CABLING <br />RO & SDS MONITOR WIRING <br />GC TO INSTALL MICROWAVE <br />TELEPHONE CABLING & JACKS <br />TIME CLOCK-CABLING <br />INNER VESTIBULE DOOR <br />EXT. WALL VAPOR BARRIER <br />EXT. WALL GYPSUM BOARD <br />INTERCOM SYSTEM <br />VALVE PANELS <br />WALL MOUNTED FOLDING SCALE <br />NETWORK RACKS <br />SECURITY SYSTEM <br />PHONE SYSTEM <br />TELEVISION/ENTERTAINMENT SYSTEM <br />GENERATOR <br />GENERATOR ANNUNCIATOR <br />TIME CLOCK <br />LOUNGE APPLIANCES <br />FURNITURE <br />CRASH CART <br />DIALYSIS MACHINES <br />OXYGEN CONCENTRATORS <br />OXYGEN CYLINDER STORAGE CONTAINER <br />HOYER LIFT <br />MULTI FUNCTION PRINTER <br />WATER TREATMENT EQUIPMENT <br />SDS & GRANUFLO EQUIPMENT <br />RO & SDS MONITORS <br />TECH REPAIR VALVE BOX ASSEMBLY <br />(WATER VENDOR TO MAKE PLUMBING CONNECTIONS) <br />(TV VENDOR TO MAKE ALL TERMINATIONS) <br />MILLWORK <br />TEMPORARY SITE SIGN <br />01 <br />01 <br />01 <br />01 <br />01 <br />01 <br />01 <br />01 <br />01 <br />01 <br />01 <br />01 <br />LOCATION SPECIFIC01 <br />01 <br />01 <br />01 <br />01 <br />01 <br />01 <br />02 <br />SEE SHEET A-2.4 FOR CLARIFICATION <br />SEE SHEET A-2.4 FOR CLARIFICATION <br />SEE SHEET A-2.4 FOR CLARIFICATION <br />SEE SHEET A-2.4 FOR CLARIFICATION <br />SEE SHEET A-2.4 FOR CLARIFICATION <br />SEE SHEET A-2.4 FOR CLARIFICATION <br />SEE SHEET A-2.4 FOR CLARIFICATION <br />SEE SHEET A-2.4 FOR CLARIFICATION <br />SEE SHEET A-2.4 FOR CLARIFICATION <br />SEE SHEET A-2.4 FOR CLARIFICATION <br />SEE SHEET A-2.4 FOR CLARIFICATION <br />SEE SHEET A-2.4 FOR CLARIFICATION <br />SEE SHEET A-2.4 FOR CLARIFICATION <br />SEE SHEET A-2.4 FOR CLARIFICATION <br />03 <br />06 <br />06 <br />06 <br />07 <br />07 <br />08 <br />08 <br />09 <br />10 <br />10 <br />13 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />15 <br />16 <br />16 <br />16 <br />16 <br />16 <br />16 <br />16 <br />16 <br />16 <br />16 <br />16 <br />16 <br />16 <br />16 <br />16 <br />16 <br />16 <br />16 <br />16 <br />POWER SUPPLY TO HVAC UNITS <br />TELEVISION SYSTEM-COAX CABLES <br />TELEVISION SYSTEM-AUDIO CABLES (TV VENDOR TO MAKE ALL TERMINATIONS) <br />IN <br />S <br />T <br />A <br />L <br />L <br />E <br />D <br />FU <br />R <br />N <br />I <br />S <br />H <br />E <br />D <br />IN <br />S <br />T <br />A <br />L <br />L <br />E <br />D <br />FU <br />R <br />N <br />I <br />S <br />H <br />E <br />D <br />IN <br />S <br />T <br />A <br />L <br />L <br />E <br />D <br />FU <br />R <br />N <br />I <br />S <br />H <br />E <br />D <br />IN <br />S <br />T <br />A <br />L <br />L <br />E <br />D <br />FU <br />R <br />N <br />I <br />S <br />H <br />E <br />D <br />IN <br />S <br />T <br />A <br />L <br />L <br />E <br />D <br />FU <br />R <br />N <br />I <br />S <br />H <br />E <br />D <br />EX <br />I <br />S <br />T <br />I <br />N <br />G <br />CS <br />I <br /> <br />D <br />I <br />V <br />I <br />S <br />I <br />O <br />N <br />STOW AWAY SCALE01 <br />HIGH DENSITY STORAGE01 <br />INTERIOR SIGNAGE10 <br />SPRINKLER SYSTEM PIPING AND HEADS 13 <br />N <br />NAME DATE <br />10.30.23 <br />I DUSTIN CURTIS, ARCHITECT OF RECORD CERTIFY THAT, TO THE BEST OF MY KNOWLEDGE AND BELIEF, THE FKC PROJECT RESPONSIBILITY <br />SCHEDULE IS COMPLETE AND PROJECT SPECIFIC, AFTER REVIEWING THE SHELL BUILDING LEASE AND CONSULTING WITH THE FKC PROJECT <br />MANAGER. <br />ACCORDING TO THE CMS FINAL RULE CONCERNING ESRD FACILITY COMPLIANCE <br />WITH THE LIFE SAFETY CODE, THIS PROJECT <br /> IS REQUIRED IS NOT REQUIRED TO COMPLY <br />JANUARY 2021 & MAY 2023 <br />JANUARY 2021 & MAY 2023 <br />FEBRUARY 2017 <br />MAY 2023 <br />JANUARY 2021 & MAY 2023 <br />DO NOT POST THESE <br />DRAWINGS ON ANY <br />PUBLIC WEBSITE. <br />(P) PROFESSIONALEXISTING ZONING: <br />398-221-24PARCEL #: <br />THIS PROJECT SHALL ADHERE TO THE FOLLOWING CODES: <br />2022 CALIFORNIA BUILDING CODE <br />2022 CALIFORNIA MECHANICAL CODE <br />2022 CALIFORNIA PLUMBING CODE <br />2022 CALIFORNIA ELECTRICAL CODE <br />2022 CALIFORNIA FIRE CODE <br />2022 STATE OF CALIFORNIA ENERGY CODE <br />2022 CALIFORNIA GREEN BUILDING CODE <br />C of Saa Aa Coco Co <br />THIS <br />PROJECT <br />THIS PROJECT <br />SUITE #111 <br />Drawing Index <br />ARCHITECTURAL <br />COPYRIGHT © 2025, ONE ARCHITECTURE , PLC. <br />ENGINEERING <br />DA <br />T <br />E <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br /> <br /># <br />DA <br />T <br />E <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br /> <br /># <br />DE <br />L <br />T <br />A <br /> <br /># <br />1 <br />DE <br />L <br />T <br />A <br /> <br /># <br />2 <br />DE <br />T <br />L <br />A <br /> <br /># <br />4 <br />DE <br />L <br />T <br />A <br /> <br /># <br />5 <br />-- <br />1. <br />2 <br />3 <br />. <br />2 <br />5 <br />DE <br />L <br />T <br />A <br /> <br /># <br />2 <br />2. <br />1 <br />8 <br />. <br />2 <br />5 <br />DE <br />L <br />T <br />A <br /> <br /># <br />3 <br />4. <br />2 <br />8 <br />. <br />2 <br />5 <br />DE <br />L <br />T <br />A <br /> <br /># <br />4 <br />6. <br />1 <br />2 <br />. <br />2 <br />5 <br />DE <br />L <br />T <br />A <br /> <br /># <br />5 <br />-- <br />-- <br />SHEET # TITLE SHEET <br />41 - 1 of 4 CIVIL - TITLE SHEET <br />42 - 2 of 4 CIVIL - TOPO AND DEMO <br />43 - 3 of 4 CIVIL - ADA ACCESS <br />44 - 4 of 4 CIVIL - WATER PLAN <br />45 - S-1.1 GENERAL STRUCTURAL NOTES <br />46 - S-1.2 TYPICAL DETAILS <br />47 - S-2.1 FOUNDATION AND GROUND LEVEL PLAN <br />48 - S-2.2 CEILING FRAMING PLAN <br />49 - S-3.1 FOUNDATION DETAILS <br />50 - S-4.1 ROOF FRAMING DETAILS <br />51 - S-5.1 SECTIONS <br />52 - M1.0 MECHANICAL SCHEDULES <br />53 - M2.0 MECHANICAL FLOOR PLAN <br />54 - M2.1 MECHANICAL ROOF PLAN <br />55 - M3.0 MECHANICAL DETAILS <br />56 - P1.0 PLUMBING FIXTURE SCHEDULE <br />57 - P1.1 PLUMBING SCHEDULES <br />58 - P2.0 DOMESTIC WATER AND GAS PLAN <br />59- P2.1 DOMESTIC WATER & GAS RISER ISOMETRIC <br />60 - P2.2 SANITARY DRAIN PLAN <br />61 - P2.2a GARAGE LEVEL - SANITARY DRAIN PLAN <br />62 - P2.3 SANITARY DRAIN RISER ISOMETRIC <br />63 - P2.4 PROCESS WATER SLEEVE PLAN <br />64 - P2.5 DIMENSIONAL CONTROL DRAWING <br />65 - P2.6 ROOF PLAN - PLUMBING <br />66 - P3.0 PLUMBING DETAILS <br />67 - P3.1 PLUMBING DETAILS <br />68 - P5.0 PLUMBING DETAILS <br />69 - E1.0 BASEMENT PLAN - ELECTRICAL <br />70 - E2.0 LIGHTING PLAN <br />71 - E2.1 POWER PLAN <br />72 - E2.2 COMMUNICATIONS PLAN <br />73 - E2.3 ROOF PLAN - ELECTRICAL <br />74 - E2.4 FLOOR PLAN PHOTOMETRICS <br />75 - E3.0 ELECTRICAL RISER <br />76 - E3.1 POWER PANEL SCHEDULES <br />77 - E4.0 TELECOM SYSTEM RISERS AND DETAILS <br />78 - E4.1 SPECIAL SYSTEM RISERS AND DETAILS <br />79 - E4.2 ELECTRICAL DETAILS <br />80 - E4.3 ELECTRICAL DETAILS <br />81 - E5.0 IECC SHEETS <br />82 - FP-2.0 FIRE PROTECTION PLAN <br />83 - ME-1.0 R.O. PROCESS WATER DISTRIBUTION SCHEM. <br />84 - ME-1.1 R.O. PROCESS WATER DISTRIBUTION DETAILS <br />85 - 1 of 1 ADA ACCESSIBLE PLAN <br />1. <br />8 <br />. <br />2 <br />4 <br />1. <br />2 <br />3 <br />. <br />2 <br />5 <br />4. <br />2 <br />. <br />2 <br />5 <br />6. <br />1 <br />2 <br />. <br />2 <br />5 <br />-- <br />-- <br />-- <br />-- <br />-- <br />-- <br />-- <br />-- <br />-- <br />SHEET # SHEET NAME <br />1 - T-1.0 TITLE SHEET <br />2 - D-1.0 DEMOLITION FLOOR PLAN <br />3 - D-1.1 DEMOLITION SHELL FLOOR PLAN <br />4 - LS-1.0 LIFE SAFETY PLAN <br />5 - LS-2.0 PARTITION TYPES SCHEDULE <br />6 - LS-3.0 PARTITION DETAILS <br />7 - LS-4.0 PENETRATIONS DETAILS SHEET <br />8 - A-1.0 PARTIAL DEMOLITION SITE PLAN & SITE PLAN <br />9 - A-1.1 PARTIAL SITE PLAN - CONSTRUCTION BARRICADE <br />10 - A-2.0 FLOOR PLAN <br />11 - A-2.0a SHELL FLOOR PLAN <br />12 - A-2.0b GARAGE FLOOR PLAN <br />13 - A-2.0c GARAGE FLOOR PLAN- CONSTRUCTION BARRICA. <br />14 - A2.1 DIMENSIONED FLOOR PLAN <br />15 - A-2.2 ENLARGED FLOOR PLANS <br />16 - A2.2a ENLARGED FLOOR PLANS <br />17 - A-2.3 FINISH FLOOR PLAN <br />18 - A-2.4a OWNER FURNISHED ITEMS PLAN <br />19 - A-2.4b INTERIOR SIGNAGE PLAN <br />20 - A-2.5 REFLECTED CEILING PLAN <br />21 - A2.5a SHELL REFLECTED CEILING PLAN <br />22 - A-2.6 ROOF PLAN <br />23 - A-2.7 DOOR & WINDOW DETAILS & SCHEDULES <br />24 - A-2.8 ROOM FINISH & COLOR PALETTE SCHEDULES <br />25 - A-2.9 DOOR HARDWARE SETS & KEYING SCHEDULE <br />26 - A-3.0 EXTERIOR BUILDING ELEVATIONS <br />27 - A-4.0 BUILDING CROSS SECTIONS <br />28 - A-6.0 TREATMENT ROOM ELEVATIONS <br />29 - A-6.2 INTERIOR ELEVATIONS & DETAILS <br />30 - A-6.3 INTERIOR ELEVATIONS & DETAILS <br />31 - A-6.4 INTERIOR ELEVATIONS & DETAILS <br />32 - A-6.5 FKC STANDARD DETAILS <br />33 - A-7.0 CONSTRUCTION DETAILS <br />34 - A8.0 MILLWORK KEY PLAN <br />35 - A8.1 INTERIOR ELEVATIONS <br />36 - A8.2 INTERIOR ELEVATIONS <br />37 - A8.3 INTERIOR ELEVATIONS <br />38 - A8.4 INTERIOR ELEVATIONS <br />39 - A8.5 INTERIOR ELEVATIONS <br />40 - A8.6 INTERIOR ELEVATIONS <br />PARTIAL DEMOLITION SITE <br />SEE PARTIAL SITE PLAN & <br />PLAN ON SHEET A-1.0 <br />SPECIFICATIONS BOOKLET <br />STRUCTURAL CALCULATION BOOKLET <br />1.8.24 <br />Bid RFI Clarifications <br />1 <br />1 <br />1 <br />DE <br />L <br />T <br />A <br /> <br /># <br />1 <br />1. <br />8 <br />. <br />2 <br />4 <br />1 <br />1.23.25 <br />City Comments <br />2 <br />2 <br />2 <br />B - AMBULATORY CARE FACILITY - OSHPD 3PROPOSED OCCUPANCY TYPE: <br />2 <br />3 <br />2. <br />1 <br />8 <br />. <br />2 <br />5 <br />DE <br />L <br />T <br />A <br /> <br /># <br />3 <br />2.18.25 <br />City Revisions <br />3 <br />3 <br />3 <br />4.2.25 <br />Revision <br />4 <br />4 <br />4 <br />6.12.25 <br />ME-1 Coordination5 <br />11.5.25 <br />Accessible Path Revisions <br />6 <br />6 <br />6