Laserfiche WebLink
JOB NO.251045 <br />SHT 3b OF 6 <br />DATE 10/30/2025 <br />FOR Fan - Red Bull DES. BY AP <br />DESCRIPTION Fan Installation <br />Seismic Loads using ASCE 7-16 <br />Per correspondence with fan supplier, guy wire <br />break strength is over 1200 lbs.