Laserfiche WebLink
*-SANTA <br />NA <br />ILi\$C <br />{riltDrrc <br />lCIIfl <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol{1 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall fill in the address ofthe project, contracto/s <br />licensing information and answer questions 1 -10 below. Complete and sign the certification section*lf answering NO to any of the guestions, plan check shall be required.'" <br />Proi ect Address: 2621 SOUTH TOWNER STREET SANTA ANA, CA 92707 <br />Contractor Company Name: PGSSOI.AR <br />Contractor License Number:#10251l5 (c-46) <br />2 <br />3 <br />YES NOtrtr <br />Etrtrtr <br />Btr <br />trtr <br />Are the following applicable to the proposed project? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 3 pounds per square feet or less? <br />Will the PV system be installed where the modules do not ovedlang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed wthout using any ballast system or counter-weight <br />system? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV syslem layout provide a three.foot wide clear access pathway per the <br />latest edition ol "Guideline for Fte Safety Elements of Solar Photovoltaic Systems" <br />by OCFA? (Guideline available on the OCFA website: htlp://www ocfa oro) <br />Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />Do the plans show a minimum of 2-112 inch lag screw embedment into roof raflers? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturels PV support information.) <br />4 <br />5 <br />b <br />7 <br />trtr <br />Etr <br />8 trtr <br />9 Etr <br />10 EIE <br />I certify under penalty ol periury under the laws of the State of Ca ia that the above is true: <br />Printname: ltc UuN/+Signature <br />phone Number; f5/ 2S? €656 Date 30 <br />Reu 2t17t2115 <br />Emait Address: /,/Lu il4a g (o /Jo7r/7,4/. ' oo //4