Laserfiche WebLink
,-,'SANTA <br />NA,',il'i,il$ <br />Planning & Building Agsflcy <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol,01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall flll in the address of the project, contractois <br />licensing information and answer questions 1 -10 below. Complete and sign the certafication section*lf answering NO to any of the questions, plan check shall be required." <br />Projec tAddress: 2621 SOUTH TOWNER STREET SANTA ANA, CA92707 <br />Contractor Company Name: <br />Contractor License Numbea: <br />trtr <br />Etr <br />I certify under <br />Print name: <br />2 <br />3 <br />P G S SOI-AR <br />#r025r ls (c-46) <br />Are the following applicable to the proposed project? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 3 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Wll the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV system layout provide a thresfoot wide clear access pathway per the <br />latest edition ol "Guideline for Fke Safety Elements of Solar Photovoltaic Systems" <br />by OCFA? (Guideline available on the OCFA website: htlo://www.ocfa.orq) <br />Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />Do the plans show a minimum ol2-112inch lag screw embedment into roof rafters? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />Ity of perjury under the laws of the State of Califo that th above is true: <br />Phone Number q€/ zs? s654 <br />Signature: <br />Date: <br />Email Address <br />YES NOtrtr <br />Eltrtrtr <br />trtr <br />trtr <br />4 <br />5 <br />6 <br />7 <br />8 Eltre Eltr <br />10 EIE <br />Re\r:211712015 <br />/L/4