Laserfiche WebLink
TASAI\ <br />Al\A <br />Planning & Building Agency <br />Building Safety Divbion <br />20 Civic Cenbr Plaza <br />P.O. Box 1988 (U-19) <br />Santa Ana, CA 9zl02 <br />Fr4) 647-s8oo <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 1'1' x 't7" size. lf answerinq NO to anv of the ouestions. Dlan check shall be reouired. <br />Contractor Company Name: <br />Contractor Licansa Number: <br />YES NO Are th6 following applicable to the proposed projec{? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the Califomia Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV anay be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2' minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16'lag screws be installed with a minimum of 2-'ll2 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structurat pages of the plans stamped and signed by a Califomia <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />1 tr <br />trtr <br />trtr <br />BDtrtr <br />tr <br />tr <br />tr <br />10 trtr <br />I certify under penalty of perjury under the laws of the State of Califomia that the .bove is tue: <br />Signature:ArrnrndnPrint Name: <br />Phone Number: <br />Email Address <br />Rev: 1'll19/2015 <br />Date:Burciaoa <br />Proiect Address: <br />trtr <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9.