Laserfiche WebLink
Pbnning & Bullding Ag€ocy <br />&ilditro seftty DiYislqr <br />20 Civlc Gentar Plza <br />P.O. Box 1988 (U-19) <br />srta AlE, cA 9202 <br />ol4) 647-sut0 <br />uuw.santa.ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Onty <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11' x 17' size. lf answerinq NO to any of the auestions. Dlan check shall be required. <br />Project Address: <br />Contractor Company Name: <br />Contractor License Number: <br />YES NO <br />I tr tr <br />2 0tr <br />trtr <br />4. <br />5. <br />6. <br />tr <br />tr <br />tr <br />D <br />tr <br />7 trtr <br />8 trtr <br />9 trtr <br />10 trtr <br />I certify under penaltlt of perjury under the laws of the State of California that the above is true: <br />Print Name:Signature:Arrnando 53,.*-j',*YEa,, <br />Phone Number: <br />Email Address <br />Rev:'1111912015 <br />Brrrriaoa <br />,,., .SA\;A <br />l\i r.;, <br />Are the following applicable to the proposed projec-t? <br />Will the PV system layout provide the required thres.foot wide clear access pathways <br />per Section 605.11 of the Califomia Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will ttle PV system be installed with a space of 2" minimum to 10' maximum between <br />the urderside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-1l2 inch <br />embedment into roof rafters (with predrilled holes) and is this minimum embedrnent <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a Califomia <br />licensed professional engineea (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />Date:.l**to.d...l'r !y4d