1. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, LICENSES, CONSTRUCTION TAXES AND FEES REQUIRED BY CITY, COUNTY AND STATE <br />LAWS EXCEPT THE GENERAL BUILDING PLANCHECK FEE AND REQUIRED REFUNDABLE DEPOSITS WHICH WILL BE PAID BY THE OWNER. <br />CONTRACTOR SHALL ARRANGE FOR ALL METER INSTALLATIONS AND PAY ALL FEES FOR SAID METERS. CONTRACTOR SHALL PROVIDE <br />TEMPORARY TOILET FACILITIES AND EROSION CONTROL MEASURES AS REQUIRED BY STATE AND LOCAL BUILDING CODE. <br />2. CONTRACTOR SHALL BE RESPONSIBLE FOR HAVING COMPLETE KNOWLEDGE OF EXISTING CONDITIONS. CONTRACTOR SHALL VERIFY EXISTING <br />CONDITIONS WITH THOSE SHOWN ON THE DRAWINGS AND SHALL VERIFY GRADES, CONDITIONS AND DIMENSIONS PRIOR TO COMMENCING <br />DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY VERBALLY AND IN WRITING OF DISCREPANCIES <br />BETWEEN ACTUAL CONDITIONS AND THOSE DEPICTED IN THE CONTRACT DOCUMENTS. CONTRACTOR SHALL NOTIFY ARCHITECT IMMEDIATELY <br />VERBALLY AND IN WRITING OF ANY DISCREPANCIES FOUND WITHIN THE DRAWINGS AND SPECIFICATIONS. <br />3. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE ACCURACY OF DETAILS; FOR CONFIRMING AND COORDINATING ALL QUANTITIES AND <br />DIMENSIONS; FOR SELECTING FABRICATION PROCESSES; FOR TECHNIQUES OF ASSEMBLY AND PERFORMANCE OF ALL WORK IN A SAFE AND <br />SATISFACTORY MANNER. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF ALL WORK INCLUDING THAT OF THE SUB- <br />CONTRACTORS. CONTRACTOR SHALL PROVIDE SUPERVISION OF THE JOB DURING ALL PHASES OF CONSTRUCTION ACTIVITIES. A COMPETENT <br />SUPERINTENDENT SHALL BE SELECTED BY THE CONTRACTOR AND SHALL BE IN CHARGE OF THE JOB UNTIL ITS COMPLETION. CONTRACTOR <br />AGREES TO BIND EVERY SUB-CONTRACTOR BY THE TERMS OF THE CONTRACT AS FAR AS SUCH TERMS ARE APPLICABLE TO THE SUB- <br />CONTRACTOR'S WORK. <br />4. CONTRACTORS SHALL BE RESPONSIBLE FOR THE DAILY REMOVAL OF ALL DEBRIS ACCUMULATED AS A RESULT OF THEIR OPERATIONS. ALL <br />SCRAP DEBRIS AND OTHER EXCESS MATERIAL SHALL BE LAWFULLY REMOVED FROM THE SITE, UNLESS OTHERWISE DIRECTED BY THE <br />CONTRACTOR. <br />5. CONTRACTOR SHALL GUARANTEE ALL WORK, MATERIALS AND PRODUCTS FOR ONE YEAR AFTER THE DATE OF ACCEPTANCE OF THE WORK AND <br />CONTRACTOR SHALL REPAIR OR REPLACE, OR CAUSE TO BE REPAIRED OR REPLACED ANY OR ALL SUCH WORK TOGETHER WITH ANY OTHER <br />WORK WHICH MAY BE DISPLACED IN DOING SO, THAT MAY PROVE DEFECTIVE WITHIN ONE YEAR, WITHOUT ADDITIONAL EXPENSE; ORDINARY <br />WEAR AND TEAR, UNUSUAL ABUSE OR NEGLECT IS EXCEPTED. EXCEPTIONS TO ONE YEAR GUARANTEE ARE SPECIFIED IN OTHER SECTIONS OF THE <br />PROJECT MANUAL OR DRAWINGS. STATE LAW, OR MANUFACTURER'S GUARANTEE SHALL GOVERN IF LENGTH AND TYPES OF GUARANTEES ARE <br />MORE STRICT OR FOR LONGER PERIODS. <br />6. THAT IS RESPONSIBILITY OF CONTRACTOR TO PROVIDE MATERIALS AND CONSTRUCTION WHICH WILL YIELD A REASONABLE VALUE OVER A <br />PERIOD OF TIME WHICH MAY EXCEED THE SPECIFIED GUARANTEE AND WARRANTY PERIODS. <br />7. CONTRACTOR SHALL BE RESPONSIBLE FOR A WEATHER TIGHT BUILDING, FREE FROM DEFECTS OF MATERIALS AND WORKMANSHIP. EACH SUB- <br />CONTRACTOR SHALL PROVIDE A WRITTEN GUARANTEE STATING THAT WORK EXECUTED BY HIM IS FREE AND WILL REMAIN FREE FROM DEFECTS <br />OF MATERIALS AND WORKMANSHIP FOR ONE YEAR FROM DATE OF ACCEPTANCE OF HIS WORK BY OWNER, AND THAT REPAIR AND REPLACEMENT <br />OF SUCH DEFECTIVE WORK AND ALL OTHER WORK DAMAGED AS A RESULT THEREBY WILL BE EXECUTED IN A TIMELY MANNER AT THE <br />CONVENIENCE OF THE OWNER AND WITHOUT COST TO OWNER. <br />8. THE ARCHITECT WILL NOT ACT AS THE OWNER'S REPRESENTATIVE DURING CONSTRUCTION. ARCHITECT WILL ADVISE AND CONSULT WITH <br />OWNER. ARCHITECT WILL OBSERVE CONSTRUCTION PER HIS AGREEMENT WITH OWNER AND RENDER INTERPRETATIONS NECESSARY FOR THE <br />PROPER EXECUTION OR PROGRESS OF THE WORK IN ACCORDANCE WITH THE INTENT OF THE PLANS AND SPECIFICATIONS. ARCHITECT WILL NOT <br />BE RESPONSIBLE OR HAVE CONTROL OR CHARGE OVER THE ACTS OR OMISSIONS, CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES <br />OR PROCEDURES, OR FOR SAFETY PRECAUTIONS AND PROGRAMS, OF THE CONTRACTOR, SUB-CONTRACTORS, OR ANY OF THEIR AGENTS OR <br />EMPLOYEES, OR ANY OTHER PERSONS PERFORMING ANY OF THE WORK. <br />ANY VERBAL INSTRUCTION OR AUTHORIZATION THAT IS CONFIRMED BY LETTER, MEETING NOTE, MEMORANDA, OR THE LIKE, (WITH A COPY SENT <br />TO THE OWNER, OR THE OWNER'S REPRESENTATIVE) & THERE IS NO EXCEPTION TAKEN WITHIN (10) CALENDAR DAYS, SHALL BE DEEMED <br />EQUIVALENT TO RECEIPT OF WRITTEN INSTRUCTION, APPROVAL AND AUTHORIZATION FROM THE OWNER. <br />9. OWNER MAY ORDER EXTRA WORK OR MAKE CHANGES BY ALTERING, ADDING TO OR DEDUCTING FROM THE WORK, THE CONTRACT SUM BEING <br />ADJUSTED TO THE MUTUAL SATISFACTION OF THE OWNER, ARCHITECT AND CONTRACTOR. BEFORE ANY CHANGES ARE BEGUN, THE ADDED OR <br />DEDUCTED SUM SHALL BE PRESENTED TO OWNER IN WRITING FOR APPROVAL. <br />10. SUBSTITUTIONS OF MATERIALS OR METHODS PROPOSED BY THE CONTRACTOR OR HIS SUB-CONTRACTORS CONTRARY TO DRAWINGS AND <br />SPECIFICATIONS SHALL BE SUBMITTED TO ARCHITECT IN WRITING FOR APPROVAL OR DENIAL. IF MORE THAN ONE MANUFACTURER IS SPECIFIED <br />IN THE PLANS OR SPECIFICATIONS, IT SHALL BE THE CONTRACTOR'S OPTION TO SELECT THE ONE WHICH HE MAY DESIRE. IF MORE THAN ONE <br />FINISH OR STYLE IS AVAILABLE IN THE ITEM SPECIFIED, CONTRACTOR SHALL BE OBLIGATED TO NOTIFY ARCHITECT VERBALLY AND IN WRITING OF <br />THIS FACT FOR ARCHITECT'S AND OWNER'S DECISION. <br />11. THESE DRAWINGS AND SPECIFICATIONS SHALL BE INTENDED TO SHOW AND DESCRIBE DETAILS FOR A CONSTRUCTIBLE BUILDING. PARTS AND <br />DETAILS NOT FULLY SHOWN OR DESCRIBED SHALL BE DETAILED AND EXECUTED ACCORDING TO STANDARD FIRST CLASS PRACTICE AND IN <br />SIMILAR MANNER AND SPIRIT OF THE DETAILS WHICH ARE SHOWN ON THE DRAWINGS AND/OR DESCRIBED IN THE PROJECT MANUAL. IF <br />CONTRACTOR OR SUB-CONTRACTOR FINDS ANY DETAILS WHICH, IN HIS OPINION, ARE UNSOUND, UNSAFE, OR NOT WATERPROOF, IT IS HIS DUTY <br />TO NOTIFY ARCHITECT IN WRITING OF THIS FACT. IF WORK IS PERFORMED AS DETAILED, IT WILL BE ASSUMED THAT THERE ARE NO OBJECTIONS <br />TO THE DETAIL. ACCURACY OF ALL DIMENSIONS SHALL BE CHECKED. NO EXTRA COMPENSATION WILL BE ALLOWED FOR DIFFERENCE BETWEEN <br />ACTUAL DIMENSIONS AND THOSE INDICATED ON THE DRAWINGS. <br />12. IN USING THESE PLAN FOR BIDDING OR CONSTRUCTION PURPOSES, ALL CONTRACTORS ARE REQUIRED TO REVIEW AND TREAT THEM AS A WHOLE <br />IN ORDER TO IDENTIFY ALL REQUIREMENTS THAT DIRECTLY OR INDIRECTLY AFFECT THEIR PORTION OF THE WORK, EVEN REQUIREMENTS LOCATED <br />IN SECTIONS DESIGNATED AS APPLICALBE TO OTHER TRADES. IN CASE OF CONFLICTS, THE AFFECTED CONTRACTOR IS REQUIRED TO EITHER <br />OBTAIN DIRECTION FROM AN APPROPRIATE REPRESENTATIVE OF THE OWNER, OR OTHERWISE TO APPLY THE MORE STRINGENT STANDARD. <br />13. THESE PLANS ARE INTENDED TO SET FORTH THE REQUIREMENTS FOR CONSTRUCTION IN ONLY AN INDUSTRY-STANDARD LEVEL OF QUALITY AND <br />DETAIL, AND THE ARE INTENDED TO BE SUPPLEMENTED BY APPROPRIATE REQUESTS FOR CLARIFICATION AND INFORMATION. ERRORS AND <br />OMISSIONS ARE TO BE EXPECTED AND ANTICIPATED, AND ALL CONTRACTORS ARE REQUIRED TO CAREFULLY REVIEW THESE PLANS FOR ERRORS <br />AND OMISSIONS AND TO BRING THESE ERRORS AND OMMISIONS TO THE ATTENTION OF A APPROPRIATE OWNER & ARCHITECT IN WRITING IN A <br />TIMELY MANNER; AND ANY CONTRACTOR WHO FAILS TO DO SO BEFORE BIDDING OR OTHERWISE PROCEEDING ASSUMES THE RISK OF ANY <br />CONSEQUENCES. SCALED DIMENSIONS SHOULD BE CONSIDERED ONLY APPROXIMATE; AND IN ANY DIMENSIONS BEFORE PROCEEDING WITH ANY <br />AFFECTED PROCUREMENT, FABRICATION OR CONSTRUCTION. <br />14. FIGURED DIMENSIONS SHALL BE FOLLOWED IN PREFERENCE TO SCALE, AND DETAIL DRAWINGS IN PREFERENCE TO SMALL SCALE DRAWINGS. <br />SUB-CONTRACTOR AND CONTRACTOR SHALL CHECK ACCURACY OF ALL DIMENSIONS IN THE FIELD PRIOR TO ANY WORK BEING CONSTRUCTED OR <br />MATERIALS OR PRODUCTS FABRICATED OR ORDERED. SPECIFICATIONS AND WRITTEN NOTES AND SCHEDULES ON DRAWINGS SHALL BE <br />FOLLOWED IN PREFERENCE TO INFORMATION FURNISHED IN THE FORM OF LINE DRAWINGS. DETAILED DRAWINGS FURNISHED DURING <br />CONSTRUCTION OR APPROVED BY CONTRACTOR OR ARCHITECT ARE TO BE CONSIDERED EXPLANATORY AND NOT AS CHANGES TO DRAWINGS <br />AND SPECIFICATIONS. NOTES, FIGURES AND DETAILS ON SAID DRAWINGS SHALL BE FOLLOWED AND EXECUTED AS IF PART OF THESE <br />DOCUMENTS. <br />15. ERRORS OR OMISSIONS WHICH APPEAR ON THE DRAWINGS, IN SPECIFICATIONS OR OTHER CONTRACT DOCUMENTS SHALL BE BROUGHT TO THE <br />IMMEDIATE ATTENTION OF THE ARCHITECT BY THE CONTRACTOR AND TO THE CONTRACTOR BY THE SUB-CONTRACTOR IN WRITING. IN EVENT OF <br />FAILURE OF SUB-CONTRACTOR TO GIVE SUCH WRITTEN NOTIFICATION BEFORE CONSTRUCTION OR FABRICATIONS OF THE WORK, HE WILL BE HELD <br />RESPONSIBLE FOR THE RESULTS OF ANY SUCH ERRORS OR OMISSIONS AND THE COSTS OF RECTIFYING SAME. HOWEVER, DRAWINGS AND <br />SPECIFICATIONS ARE COMPLEMENTARY AND WORK CALLED FOR ON ONE AND NOT THE OTHER SHALL BE PROVIDED AS THOUGH FULLY SET FORTH <br />IN BOTH. <br />16. AT ALL TIMES DURING CONSTRUCTION ACTIVITIES OR ERECTION OF PROJECT OR ITS COMPONENT PARTS, PRIOR TO COMPLETION OF THE <br />STRUCTURAL FRAME OR REPLACEMENT AND PERMANENT CONNECTION OF COMPONENT MEMBERS TO THE STRUCTURAL FRAME, SUB- <br />CONTRACTORS SHALL PROVIDE, INSTALL AND MAINTAIN PROPERLY DESIGNED AND CONSTRUCTED TEMPORARY BRACING OF ADEQUATE <br />STRENGTH TO PREVENT DISLOCATION, DISTORTION, CRACKING, FALLING OFF, OR ANY OTHER DAMAGE TO WORK OR ANY OF ITS COMPONENT <br />PARTS DUE TO FORESEEABLE NORMAL AS WELL AS NOT FORESEEABLE EXCESSIVE WIND AND EARTHQUAKE FORCES WITHOUT ADDITIONAL COST <br />TO OWNER. CONTRACTOR AND HIS SUB-CONTRACTORS SHALL, AT THEIR EXPENSE, REPLACE OR REPAIR, AS DIRECTED, DAMAGED PORTIONS OF <br />THEIR WORK OR COMPONENT PARTS. <br />17. NO CHANGES ARE TO BE MADE ON THESE PLANS WITHOUT THE KNOWLEDGE OR CONSENT OF THE ARCHITECT/ ENGINEER WHOSE SIGNATURE <br />APPEARS HERON. <br />18. NO FRAMING OF ANY TYPE TO BE CONCEALED PRIOR TO INSPECTION BY GOVERNING AGENCIES. <br />19. REFERENCES TO ANY DETAIL OR DRAWINGS IS FOR CONVENIENCE ONLY AND DOES NOT LIMIT THE APPLICATION OF SUCH DETAIL OR DRAWINGS. <br />20. THE BUILDER SHALL PROVIDE TO THE BUILDING OWNER AT OCCUPANCY MAINTENANCE INFORMATION FOR ALL FEATURES, MATERIALS, <br />COMPONENTS, AND MANUFACTURED INFORMATION FOR ALL FEATURES, MATERIALS, COMPONENTS AND MANUFACTURED DEVICES THAT REQUIRE <br />ROUTINE MAINTENANCE FOR EFFICIENT OPERATION. REQUIRED ROUTINE MAINTENANCE ACTIONS SHALL BE CLEARLY STATED AND <br />INCORPORATED ON A READILY ACCESSIBLE LABEL. THE LABEL MAY BE LIMITED TO IDENTIFYING, BY TITLE AND/OR PUBLICATION NUMBER, THE <br />OPERATION AND MAINTENANCE MANUAL FOR THAT PARTICULAR MODEL AND TYPE OF FEATURE, MATERIAL, COMPONENT, OR MANUFACTURED <br />DEVICE. <br />21. AFTER INSTALLING WALL, CEILING, OR FLOOR INSULATION, THE INSTALLER SHALL MAKE AVAILABLE TO THE ENFORCEMENT AGENCY OR POST IN A <br />CONSPICUOUS LOCATION IN THE BUILDING A CERTIFICATE SIGNED BY THE INSTALLER STATING THAT THE INSTALLATION IS CONSISTENT WITH THE <br />PLANS AND SPECIFICATIONS FOR WHICH THE BUILDING PERMIT WAS ISSUED. THE CERTIFICATE SHALL ALSO STATE THE MANUFACTURER'S NAME <br />AND MATERIAL IDENTIFICATION, THE INSTALLED R-VALUE, AND (IN APPLICATIONS OF LOOSE FILL INSULATION) THE MINIMUM INSTALLED WEIGHT <br />PER SQUARE FOOT CONSISTENT WITH THE MANUFACTURER'S LABELED INSTALLED DESIGN DENSITY FOR THE DESIRED R-VALUE. <br />22. INSPECTOR TO REVIEW AND APPROVE UNDERGROUND ELEC. SERVICE PRIOR TO CONCRETE PLACEMENT. <br />23. ISSUANCE OF A BUILDING PERMIT DOES NOT RELIEVE APPLICANTS OF THE LEGAL REQUIREMENTS TO OBSERVE COVENANTS, CONDITIONS AND <br />RESTRICTIONS WHICH MAY BE RECORDED AGAINST THE PROPERTY OR TO OBTAIN PLANS. YOU SHOULD CONTACT YOUR COMMUNITY <br />ASSOCIATIONS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION AUTHORIZED BY THIS PERMIT. <br />24. GENERAL CONTRACTOR, CONTRACTORS, SUB-CONTRACTORS AND BUILDERS TO COORDINATE ALL ENGINEERING AND MECHANICAL DRAWINGS <br />WITH ARCHITECTURAL DRAWINGS BEFORE PROCEEDING WITH WORK. IF DISCREPANCIES ARE APPARENTLY OBSERVED OR INFORMATION <br />APPARENTLY IS THOUGHT TO BE MISSING, NOTIFY ARCHITECT WITHIN 24 HOURS WITH SKETCH, DRAWING, PDF, PHOTOCOPIES WITH LEGIBLE <br />HAND WRITTEN NOTES AND/OR WRITING (FAX, EMAIL OR CORRESPONDENCE). IF CONFLICT WITH EXISTING CONDITIONS, PROVIDE <br />DOCUMENTATION (PHOTOS, SKETCHES, DWGS) OF EXISTING CONDITIONS AND SUGGEST PROPOSAL(S) FOR SOLUTION (SKETCH, DRAWING, <br />AND/OR WRITING). <br />1. WINDOW MANUFACTURER AND INSTALLER SHALL INSURE THAT ALL WINDOWS MEET OR <br />EXCEED ALL EGRESS REQUIREMENTS OF CRC R310 & R312 <br />2. ALL WINDOWS AND SLIDING GLASS DOORS SHALL BE INSTALLED PER AMERICAN <br />ARCHITECTURAL MANUFACTURERS ASSOCIATION AAMA 2400=02 RECOMMENDATIONS <br />"STANDARD PRACTICE FOR INSTALLATION OF WINDOWS WITH INTEGRAL MOUNTING FLANGES <br />IN STUD FRAME CONSTRUCTION". <br />3. INSTALL AN ISOLATION MEMBRANE BELOW THE THRESHOLD OF ALL SLIDING GLASS DOORS <br />THAT REST ON A CONCRETE SLAB. <br />4. ALL SEALANT SHALL BE OF HIGH QUALITY AND REVIEWED OFR COMPATIBILITY WITH ASPHALTIC <br />MEMBRANES AND FLASHING MATERIAL. <br />44 <br />" <br /> <br />M <br />A <br />X <br />I <br />M <br />U <br />M <br />24 <br />" <br /> <br />M <br />I <br />N <br />. <br />20" MINNIMUM <br />F.F. > 72" ABV. FINISH GRADE. <br />24 <br />" <br /> <br />M <br />I <br />N <br />I <br />M <br />U <br />M <br /> <br />@ <br />44 <br />" <br /> <br />M <br />A <br />X <br />I <br />M <br />U <br />M <br />20" MINNIMUM <br />F.F. > 72" ABV. FINISH GRADE. <br />24 <br />" <br /> <br />M <br />I <br />N <br />I <br />M <br />U <br />M <br /> <br />@ <br />5.7 S.F MINIMUM <br />24 <br />" <br /> <br />M <br />I <br />N <br />. <br />5. <br />7 <br /> <br />S <br />. <br />F <br /> <br />M <br />I <br />N <br />I <br />M <br />U <br />M <br />1. MIN. SET CLEAR OPENING OF 5.7 SQUARE FEET. <br />2. MIN. SET CLEAR HEIGHT OF 24 INCHES. <br />3. WINDOW SILL CLEAR OPENING EMERGENCY EGRESS NO MORE THAN 44 INCHES ABOVE THE FLOOR. <br />EMERGENCY EGRESS <br />TEMPERED, SHATTER-PROOF ENCLOSURE OR <br />CURTAIN ROD PROVIDED BY OWNER <br />TUB / SHOWERTUB / SHOWERTUB / SHOWERTUB / SHOWER <br />RIGID PLUMBING CONNECTION <br />REQUIRED OR PROVIDE ACCESS PANEL <br />SHOWERHEADS -1.8@ 80 PSI/GAL PER <br />2022 CALIFORNIA GREEN BUILDING <br />STANDARDS <br />TEMPERED, SHATTER-PROOF <br />ENCLOSURE PROVIDED BY OWNER <br />SHOWERSHOWERSHOWERSHOWER <br />SHOWERHEADS -1.8@ 80 PSI/GAL PER <br />2022 CALIFORNIA GREEN BUILDING <br />STANDARDS <br />SPLASH -SEE INTERIOR ELEV. <br />METAL HOOD W/FAN & LIGHT <br />PROVIDE 110V OUTLET FOR HOOD <br />@72" A.F.F (WHERE OCCURS) <br />30" WIDE RANGE, U.N.O. <br />SPLASH -SEE INTERIOR ELEV. <br />12" OVERHEAD CABINETS <br />REFRIGERATOR SPACE <br />SOFFIT (WHERE OCCURS) <br />SHELF BEYOND <br />PANEL DOOR <br />HINGE SIDE <br />FIXED PANEL <br />SPLASH-SEE INTERIOR <br />ELEV. <br />COUNTERTOP <br />DRAWER <br />TOE SPACE (SEE INTERIOR ELEVATIONS <br />FOR HEIGHT) VENT OUT @ SINKS <br />24" CLR. <br />15 <br />" <br /> <br />M <br />I <br />N <br />. <br />15 <br />" <br /> <br />M <br />I <br />N <br />. <br />INDICATES 30"X24" <br />REQUIRED <br />CLEARANCE <br />KITCHEN LAYOUTKITCHEN LAYOUTKITCHEN LAYOUTKITCHEN LAYOUT <br />CABINET ELEVATION LAYOUTCABINET ELEVATION LAYOUTCABINET ELEVATION LAYOUTCABINET ELEVATION LAYOUT <br />WATER CLOSETWATER CLOSETWATER CLOSETWATER CLOSET <br />WATER CLOSET (1.28 <br />GAL/FLUSH MAX.) PER <br />2022 CALIFORNIA GREEN <br />BUILDING STANDARDS. <br />SPLASH-SEE INTERIOR ELEV. <br />VALATORY-FAUCETS 1.2 GAL/MIN <br />@ 60PSI, 0.8 GAL/MIN @ 20 PSI MIN <br />PER 2022 CALIFORNIA GREEN <br />BUILDING STANDARDS <br />RECESSED MEDICINE CABINET <br />VALATORYVALATORYVALATORYVALATORY <br />SPLASH-SEE INTERIOR ELEV. <br />30" DOUBLE SINK FAUCET <br />1.8 GAL/MIN. @ 60PSI 2022 <br />CALIFORNIA GREEN BUILDING <br />STANDARDS <br />GARBAGE DISPOSAL (PROVIDE <br />ELECTRICAL OUTLET BELOW <br />COUNTERTOP) <br />24" DISHWASHER SPACE <br />(PROVIDE ELECTRICAL OUTLET <br />BELOW COUNTERTOP) <br />KITCHEN SINK/GARBAGE DISPOSALKITCHEN SINK/GARBAGE DISPOSALKITCHEN SINK/GARBAGE DISPOSALKITCHEN SINK/GARBAGE DISPOSAL <br />2025.03 <br />10.10.2025 <br />©2025Sheet No. <br />Rev. <br />Project No. <br />Date Print: <br />Design by <br />TRINH HA. <br />Date. <br />Pr <br />o <br />j <br />e <br />c <br />t <br />: <br />Description. <br />1.07.23.2025Correction 1st. <br />2.09.12.2025Correction 2nd. <br />00-G-300 <br />CE <br />N <br />T <br />E <br />R <br /> <br />S <br />T <br /> <br />CE <br />N <br />T <br />E <br />R <br /> <br />S <br />T <br /> <br />CE <br />N <br />T <br />E <br />R <br /> <br />S <br />T <br /> <br />CE <br />N <br />T <br />E <br />R <br /> <br />S <br />T <br /> <br />---- <br />RE <br />S <br />I <br />D <br />E <br />N <br />C <br />E <br />RE <br />S <br />I <br />D <br />E <br />N <br />C <br />E <br />RE <br />S <br />I <br />D <br />E <br />N <br />C <br />E <br />RE <br />S <br />I <br />D <br />E <br />N <br />C <br />E <br />Ad <br />d <br />r <br />e <br />s <br />s <br /> <br />M <br />a <br />i <br />n <br /> <br />H <br />o <br />u <br />s <br />e <br />: <br /> <br />4 <br />2 <br />1 <br /> <br />S <br /> <br />C <br />e <br />n <br />t <br />e <br />r <br /> <br />S <br />t <br />, <br /> <br />S <br />a <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />, <br /> <br />C <br />A <br /> <br />92 <br />7 <br />0 <br />3 <br />Ad <br />d <br />r <br />e <br />s <br />s <br /> <br />D <br />e <br />t <br />a <br />c <br />h <br />e <br />d <br /> <br />A <br />D <br />U <br />: <br /> <br />4 <br />2 <br />3 <br /> <br />S <br /> <br />C <br />e <br />n <br />t <br />e <br />r <br /> <br />S <br />t <br />, <br /> <br />S <br />a <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />, <br /> <br />C <br />A <br />9 <br />2 <br />7 <br />0 <br />3 <br />GENERAL DETAILS <br />GENERAL WINDOW NOTES <br />TYPICAL FIXTURE <br />GENERAL NOTESGENERAL NOTESGENERAL NOTESGENERAL NOTES <br />WATER HEATER