|
1. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, LICENSES, CONSTRUCTION TAXES AND FEES REQUIRED BY CITY, COUNTY AND STATE
<br />LAWS EXCEPT THE GENERAL BUILDING PLANCHECK FEE AND REQUIRED REFUNDABLE DEPOSITS WHICH WILL BE PAID BY THE OWNER.
<br />CONTRACTOR SHALL ARRANGE FOR ALL METER INSTALLATIONS AND PAY ALL FEES FOR SAID METERS. CONTRACTOR SHALL PROVIDE
<br />TEMPORARY TOILET FACILITIES AND EROSION CONTROL MEASURES AS REQUIRED BY STATE AND LOCAL BUILDING CODE.
<br />2. CONTRACTOR SHALL BE RESPONSIBLE FOR HAVING COMPLETE KNOWLEDGE OF EXISTING CONDITIONS. CONTRACTOR SHALL VERIFY EXISTING
<br />CONDITIONS WITH THOSE SHOWN ON THE DRAWINGS AND SHALL VERIFY GRADES, CONDITIONS AND DIMENSIONS PRIOR TO COMMENCING
<br />DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY VERBALLY AND IN WRITING OF DISCREPANCIES
<br />BETWEEN ACTUAL CONDITIONS AND THOSE DEPICTED IN THE CONTRACT DOCUMENTS. CONTRACTOR SHALL NOTIFY ARCHITECT IMMEDIATELY
<br />VERBALLY AND IN WRITING OF ANY DISCREPANCIES FOUND WITHIN THE DRAWINGS AND SPECIFICATIONS.
<br />3. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE ACCURACY OF DETAILS; FOR CONFIRMING AND COORDINATING ALL QUANTITIES AND
<br />DIMENSIONS; FOR SELECTING FABRICATION PROCESSES; FOR TECHNIQUES OF ASSEMBLY AND PERFORMANCE OF ALL WORK IN A SAFE AND
<br />SATISFACTORY MANNER. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF ALL WORK INCLUDING THAT OF THE SUB-
<br />CONTRACTORS. CONTRACTOR SHALL PROVIDE SUPERVISION OF THE JOB DURING ALL PHASES OF CONSTRUCTION ACTIVITIES. A COMPETENT
<br />SUPERINTENDENT SHALL BE SELECTED BY THE CONTRACTOR AND SHALL BE IN CHARGE OF THE JOB UNTIL ITS COMPLETION. CONTRACTOR
<br />AGREES TO BIND EVERY SUB-CONTRACTOR BY THE TERMS OF THE CONTRACT AS FAR AS SUCH TERMS ARE APPLICABLE TO THE SUB-
<br />CONTRACTOR'S WORK.
<br />4. CONTRACTORS SHALL BE RESPONSIBLE FOR THE DAILY REMOVAL OF ALL DEBRIS ACCUMULATED AS A RESULT OF THEIR OPERATIONS. ALL
<br />SCRAP DEBRIS AND OTHER EXCESS MATERIAL SHALL BE LAWFULLY REMOVED FROM THE SITE, UNLESS OTHERWISE DIRECTED BY THE
<br />CONTRACTOR.
<br />5. CONTRACTOR SHALL GUARANTEE ALL WORK, MATERIALS AND PRODUCTS FOR ONE YEAR AFTER THE DATE OF ACCEPTANCE OF THE WORK AND
<br />CONTRACTOR SHALL REPAIR OR REPLACE, OR CAUSE TO BE REPAIRED OR REPLACED ANY OR ALL SUCH WORK TOGETHER WITH ANY OTHER
<br />WORK WHICH MAY BE DISPLACED IN DOING SO, THAT MAY PROVE DEFECTIVE WITHIN ONE YEAR, WITHOUT ADDITIONAL EXPENSE; ORDINARY
<br />WEAR AND TEAR, UNUSUAL ABUSE OR NEGLECT IS EXCEPTED. EXCEPTIONS TO ONE YEAR GUARANTEE ARE SPECIFIED IN OTHER SECTIONS OF THE
<br />PROJECT MANUAL OR DRAWINGS. STATE LAW, OR MANUFACTURER'S GUARANTEE SHALL GOVERN IF LENGTH AND TYPES OF GUARANTEES ARE
<br />MORE STRICT OR FOR LONGER PERIODS.
<br />6. THAT IS RESPONSIBILITY OF CONTRACTOR TO PROVIDE MATERIALS AND CONSTRUCTION WHICH WILL YIELD A REASONABLE VALUE OVER A
<br />PERIOD OF TIME WHICH MAY EXCEED THE SPECIFIED GUARANTEE AND WARRANTY PERIODS.
<br />7. CONTRACTOR SHALL BE RESPONSIBLE FOR A WEATHER TIGHT BUILDING, FREE FROM DEFECTS OF MATERIALS AND WORKMANSHIP. EACH SUB-
<br />CONTRACTOR SHALL PROVIDE A WRITTEN GUARANTEE STATING THAT WORK EXECUTED BY HIM IS FREE AND WILL REMAIN FREE FROM DEFECTS
<br />OF MATERIALS AND WORKMANSHIP FOR ONE YEAR FROM DATE OF ACCEPTANCE OF HIS WORK BY OWNER, AND THAT REPAIR AND REPLACEMENT
<br />OF SUCH DEFECTIVE WORK AND ALL OTHER WORK DAMAGED AS A RESULT THEREBY WILL BE EXECUTED IN A TIMELY MANNER AT THE
<br />CONVENIENCE OF THE OWNER AND WITHOUT COST TO OWNER.
<br />8. THE ARCHITECT WILL NOT ACT AS THE OWNER'S REPRESENTATIVE DURING CONSTRUCTION. ARCHITECT WILL ADVISE AND CONSULT WITH
<br />OWNER. ARCHITECT WILL OBSERVE CONSTRUCTION PER HIS AGREEMENT WITH OWNER AND RENDER INTERPRETATIONS NECESSARY FOR THE
<br />PROPER EXECUTION OR PROGRESS OF THE WORK IN ACCORDANCE WITH THE INTENT OF THE PLANS AND SPECIFICATIONS. ARCHITECT WILL NOT
<br />BE RESPONSIBLE OR HAVE CONTROL OR CHARGE OVER THE ACTS OR OMISSIONS, CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES
<br />OR PROCEDURES, OR FOR SAFETY PRECAUTIONS AND PROGRAMS, OF THE CONTRACTOR, SUB-CONTRACTORS, OR ANY OF THEIR AGENTS OR
<br />EMPLOYEES, OR ANY OTHER PERSONS PERFORMING ANY OF THE WORK.
<br />ANY VERBAL INSTRUCTION OR AUTHORIZATION THAT IS CONFIRMED BY LETTER, MEETING NOTE, MEMORANDA, OR THE LIKE, (WITH A COPY SENT
<br />TO THE OWNER, OR THE OWNER'S REPRESENTATIVE) & THERE IS NO EXCEPTION TAKEN WITHIN (10) CALENDAR DAYS, SHALL BE DEEMED
<br />EQUIVALENT TO RECEIPT OF WRITTEN INSTRUCTION, APPROVAL AND AUTHORIZATION FROM THE OWNER.
<br />9. OWNER MAY ORDER EXTRA WORK OR MAKE CHANGES BY ALTERING, ADDING TO OR DEDUCTING FROM THE WORK, THE CONTRACT SUM BEING
<br />ADJUSTED TO THE MUTUAL SATISFACTION OF THE OWNER, ARCHITECT AND CONTRACTOR. BEFORE ANY CHANGES ARE BEGUN, THE ADDED OR
<br />DEDUCTED SUM SHALL BE PRESENTED TO OWNER IN WRITING FOR APPROVAL.
<br />10. SUBSTITUTIONS OF MATERIALS OR METHODS PROPOSED BY THE CONTRACTOR OR HIS SUB-CONTRACTORS CONTRARY TO DRAWINGS AND
<br />SPECIFICATIONS SHALL BE SUBMITTED TO ARCHITECT IN WRITING FOR APPROVAL OR DENIAL. IF MORE THAN ONE MANUFACTURER IS SPECIFIED
<br />IN THE PLANS OR SPECIFICATIONS, IT SHALL BE THE CONTRACTOR'S OPTION TO SELECT THE ONE WHICH HE MAY DESIRE. IF MORE THAN ONE
<br />FINISH OR STYLE IS AVAILABLE IN THE ITEM SPECIFIED, CONTRACTOR SHALL BE OBLIGATED TO NOTIFY ARCHITECT VERBALLY AND IN WRITING OF
<br />THIS FACT FOR ARCHITECT'S AND OWNER'S DECISION.
<br />11. THESE DRAWINGS AND SPECIFICATIONS SHALL BE INTENDED TO SHOW AND DESCRIBE DETAILS FOR A CONSTRUCTIBLE BUILDING. PARTS AND
<br />DETAILS NOT FULLY SHOWN OR DESCRIBED SHALL BE DETAILED AND EXECUTED ACCORDING TO STANDARD FIRST CLASS PRACTICE AND IN
<br />SIMILAR MANNER AND SPIRIT OF THE DETAILS WHICH ARE SHOWN ON THE DRAWINGS AND/OR DESCRIBED IN THE PROJECT MANUAL. IF
<br />CONTRACTOR OR SUB-CONTRACTOR FINDS ANY DETAILS WHICH, IN HIS OPINION, ARE UNSOUND, UNSAFE, OR NOT WATERPROOF, IT IS HIS DUTY
<br />TO NOTIFY ARCHITECT IN WRITING OF THIS FACT. IF WORK IS PERFORMED AS DETAILED, IT WILL BE ASSUMED THAT THERE ARE NO OBJECTIONS
<br />TO THE DETAIL. ACCURACY OF ALL DIMENSIONS SHALL BE CHECKED. NO EXTRA COMPENSATION WILL BE ALLOWED FOR DIFFERENCE BETWEEN
<br />ACTUAL DIMENSIONS AND THOSE INDICATED ON THE DRAWINGS.
<br />12. IN USING THESE PLAN FOR BIDDING OR CONSTRUCTION PURPOSES, ALL CONTRACTORS ARE REQUIRED TO REVIEW AND TREAT THEM AS A WHOLE
<br />IN ORDER TO IDENTIFY ALL REQUIREMENTS THAT DIRECTLY OR INDIRECTLY AFFECT THEIR PORTION OF THE WORK, EVEN REQUIREMENTS LOCATED
<br />IN SECTIONS DESIGNATED AS APPLICALBE TO OTHER TRADES. IN CASE OF CONFLICTS, THE AFFECTED CONTRACTOR IS REQUIRED TO EITHER
<br />OBTAIN DIRECTION FROM AN APPROPRIATE REPRESENTATIVE OF THE OWNER, OR OTHERWISE TO APPLY THE MORE STRINGENT STANDARD.
<br />13. THESE PLANS ARE INTENDED TO SET FORTH THE REQUIREMENTS FOR CONSTRUCTION IN ONLY AN INDUSTRY-STANDARD LEVEL OF QUALITY AND
<br />DETAIL, AND THE ARE INTENDED TO BE SUPPLEMENTED BY APPROPRIATE REQUESTS FOR CLARIFICATION AND INFORMATION. ERRORS AND
<br />OMISSIONS ARE TO BE EXPECTED AND ANTICIPATED, AND ALL CONTRACTORS ARE REQUIRED TO CAREFULLY REVIEW THESE PLANS FOR ERRORS
<br />AND OMISSIONS AND TO BRING THESE ERRORS AND OMMISIONS TO THE ATTENTION OF A APPROPRIATE OWNER & ARCHITECT IN WRITING IN A
<br />TIMELY MANNER; AND ANY CONTRACTOR WHO FAILS TO DO SO BEFORE BIDDING OR OTHERWISE PROCEEDING ASSUMES THE RISK OF ANY
<br />CONSEQUENCES. SCALED DIMENSIONS SHOULD BE CONSIDERED ONLY APPROXIMATE; AND IN ANY DIMENSIONS BEFORE PROCEEDING WITH ANY
<br />AFFECTED PROCUREMENT, FABRICATION OR CONSTRUCTION.
<br />14. FIGURED DIMENSIONS SHALL BE FOLLOWED IN PREFERENCE TO SCALE, AND DETAIL DRAWINGS IN PREFERENCE TO SMALL SCALE DRAWINGS.
<br />SUB-CONTRACTOR AND CONTRACTOR SHALL CHECK ACCURACY OF ALL DIMENSIONS IN THE FIELD PRIOR TO ANY WORK BEING CONSTRUCTED OR
<br />MATERIALS OR PRODUCTS FABRICATED OR ORDERED. SPECIFICATIONS AND WRITTEN NOTES AND SCHEDULES ON DRAWINGS SHALL BE
<br />FOLLOWED IN PREFERENCE TO INFORMATION FURNISHED IN THE FORM OF LINE DRAWINGS. DETAILED DRAWINGS FURNISHED DURING
<br />CONSTRUCTION OR APPROVED BY CONTRACTOR OR ARCHITECT ARE TO BE CONSIDERED EXPLANATORY AND NOT AS CHANGES TO DRAWINGS
<br />AND SPECIFICATIONS. NOTES, FIGURES AND DETAILS ON SAID DRAWINGS SHALL BE FOLLOWED AND EXECUTED AS IF PART OF THESE
<br />DOCUMENTS.
<br />15. ERRORS OR OMISSIONS WHICH APPEAR ON THE DRAWINGS, IN SPECIFICATIONS OR OTHER CONTRACT DOCUMENTS SHALL BE BROUGHT TO THE
<br />IMMEDIATE ATTENTION OF THE ARCHITECT BY THE CONTRACTOR AND TO THE CONTRACTOR BY THE SUB-CONTRACTOR IN WRITING. IN EVENT OF
<br />FAILURE OF SUB-CONTRACTOR TO GIVE SUCH WRITTEN NOTIFICATION BEFORE CONSTRUCTION OR FABRICATIONS OF THE WORK, HE WILL BE HELD
<br />RESPONSIBLE FOR THE RESULTS OF ANY SUCH ERRORS OR OMISSIONS AND THE COSTS OF RECTIFYING SAME. HOWEVER, DRAWINGS AND
<br />SPECIFICATIONS ARE COMPLEMENTARY AND WORK CALLED FOR ON ONE AND NOT THE OTHER SHALL BE PROVIDED AS THOUGH FULLY SET FORTH
<br />IN BOTH.
<br />16. AT ALL TIMES DURING CONSTRUCTION ACTIVITIES OR ERECTION OF PROJECT OR ITS COMPONENT PARTS, PRIOR TO COMPLETION OF THE
<br />STRUCTURAL FRAME OR REPLACEMENT AND PERMANENT CONNECTION OF COMPONENT MEMBERS TO THE STRUCTURAL FRAME, SUB-
<br />CONTRACTORS SHALL PROVIDE, INSTALL AND MAINTAIN PROPERLY DESIGNED AND CONSTRUCTED TEMPORARY BRACING OF ADEQUATE
<br />STRENGTH TO PREVENT DISLOCATION, DISTORTION, CRACKING, FALLING OFF, OR ANY OTHER DAMAGE TO WORK OR ANY OF ITS COMPONENT
<br />PARTS DUE TO FORESEEABLE NORMAL AS WELL AS NOT FORESEEABLE EXCESSIVE WIND AND EARTHQUAKE FORCES WITHOUT ADDITIONAL COST
<br />TO OWNER. CONTRACTOR AND HIS SUB-CONTRACTORS SHALL, AT THEIR EXPENSE, REPLACE OR REPAIR, AS DIRECTED, DAMAGED PORTIONS OF
<br />THEIR WORK OR COMPONENT PARTS.
<br />17. NO CHANGES ARE TO BE MADE ON THESE PLANS WITHOUT THE KNOWLEDGE OR CONSENT OF THE ARCHITECT/ ENGINEER WHOSE SIGNATURE
<br />APPEARS HERON.
<br />18. NO FRAMING OF ANY TYPE TO BE CONCEALED PRIOR TO INSPECTION BY GOVERNING AGENCIES.
<br />19. REFERENCES TO ANY DETAIL OR DRAWINGS IS FOR CONVENIENCE ONLY AND DOES NOT LIMIT THE APPLICATION OF SUCH DETAIL OR DRAWINGS.
<br />20. THE BUILDER SHALL PROVIDE TO THE BUILDING OWNER AT OCCUPANCY MAINTENANCE INFORMATION FOR ALL FEATURES, MATERIALS,
<br />COMPONENTS, AND MANUFACTURED INFORMATION FOR ALL FEATURES, MATERIALS, COMPONENTS AND MANUFACTURED DEVICES THAT REQUIRE
<br />ROUTINE MAINTENANCE FOR EFFICIENT OPERATION. REQUIRED ROUTINE MAINTENANCE ACTIONS SHALL BE CLEARLY STATED AND
<br />INCORPORATED ON A READILY ACCESSIBLE LABEL. THE LABEL MAY BE LIMITED TO IDENTIFYING, BY TITLE AND/OR PUBLICATION NUMBER, THE
<br />OPERATION AND MAINTENANCE MANUAL FOR THAT PARTICULAR MODEL AND TYPE OF FEATURE, MATERIAL, COMPONENT, OR MANUFACTURED
<br />DEVICE.
<br />21. AFTER INSTALLING WALL, CEILING, OR FLOOR INSULATION, THE INSTALLER SHALL MAKE AVAILABLE TO THE ENFORCEMENT AGENCY OR POST IN A
<br />CONSPICUOUS LOCATION IN THE BUILDING A CERTIFICATE SIGNED BY THE INSTALLER STATING THAT THE INSTALLATION IS CONSISTENT WITH THE
<br />PLANS AND SPECIFICATIONS FOR WHICH THE BUILDING PERMIT WAS ISSUED. THE CERTIFICATE SHALL ALSO STATE THE MANUFACTURER'S NAME
<br />AND MATERIAL IDENTIFICATION, THE INSTALLED R-VALUE, AND (IN APPLICATIONS OF LOOSE FILL INSULATION) THE MINIMUM INSTALLED WEIGHT
<br />PER SQUARE FOOT CONSISTENT WITH THE MANUFACTURER'S LABELED INSTALLED DESIGN DENSITY FOR THE DESIRED R-VALUE.
<br />22. INSPECTOR TO REVIEW AND APPROVE UNDERGROUND ELEC. SERVICE PRIOR TO CONCRETE PLACEMENT.
<br />23. ISSUANCE OF A BUILDING PERMIT DOES NOT RELIEVE APPLICANTS OF THE LEGAL REQUIREMENTS TO OBSERVE COVENANTS, CONDITIONS AND
<br />RESTRICTIONS WHICH MAY BE RECORDED AGAINST THE PROPERTY OR TO OBTAIN PLANS. YOU SHOULD CONTACT YOUR COMMUNITY
<br />ASSOCIATIONS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION AUTHORIZED BY THIS PERMIT.
<br />24. GENERAL CONTRACTOR, CONTRACTORS, SUB-CONTRACTORS AND BUILDERS TO COORDINATE ALL ENGINEERING AND MECHANICAL DRAWINGS
<br />WITH ARCHITECTURAL DRAWINGS BEFORE PROCEEDING WITH WORK. IF DISCREPANCIES ARE APPARENTLY OBSERVED OR INFORMATION
<br />APPARENTLY IS THOUGHT TO BE MISSING, NOTIFY ARCHITECT WITHIN 24 HOURS WITH SKETCH, DRAWING, PDF, PHOTOCOPIES WITH LEGIBLE
<br />HAND WRITTEN NOTES AND/OR WRITING (FAX, EMAIL OR CORRESPONDENCE). IF CONFLICT WITH EXISTING CONDITIONS, PROVIDE
<br />DOCUMENTATION (PHOTOS, SKETCHES, DWGS) OF EXISTING CONDITIONS AND SUGGEST PROPOSAL(S) FOR SOLUTION (SKETCH, DRAWING,
<br />AND/OR WRITING).
<br />1. WINDOW MANUFACTURER AND INSTALLER SHALL INSURE THAT ALL WINDOWS MEET OR
<br />EXCEED ALL EGRESS REQUIREMENTS OF CRC R310 & R312
<br />2. ALL WINDOWS AND SLIDING GLASS DOORS SHALL BE INSTALLED PER AMERICAN
<br />ARCHITECTURAL MANUFACTURERS ASSOCIATION AAMA 2400=02 RECOMMENDATIONS
<br />"STANDARD PRACTICE FOR INSTALLATION OF WINDOWS WITH INTEGRAL MOUNTING FLANGES
<br />IN STUD FRAME CONSTRUCTION".
<br />3. INSTALL AN ISOLATION MEMBRANE BELOW THE THRESHOLD OF ALL SLIDING GLASS DOORS
<br />THAT REST ON A CONCRETE SLAB.
<br />4. ALL SEALANT SHALL BE OF HIGH QUALITY AND REVIEWED OFR COMPATIBILITY WITH ASPHALTIC
<br />MEMBRANES AND FLASHING MATERIAL.
<br />44
<br />"
<br />
<br />M
<br />A
<br />X
<br />I
<br />M
<br />U
<br />M
<br />24
<br />"
<br />
<br />M
<br />I
<br />N
<br />.
<br />20" MINNIMUM
<br />F.F. > 72" ABV. FINISH GRADE.
<br />24
<br />"
<br />
<br />M
<br />I
<br />N
<br />I
<br />M
<br />U
<br />M
<br />
<br />@
<br />44
<br />"
<br />
<br />M
<br />A
<br />X
<br />I
<br />M
<br />U
<br />M
<br />20" MINNIMUM
<br />F.F. > 72" ABV. FINISH GRADE.
<br />24
<br />"
<br />
<br />M
<br />I
<br />N
<br />I
<br />M
<br />U
<br />M
<br />
<br />@
<br />5.7 S.F MINIMUM
<br />24
<br />"
<br />
<br />M
<br />I
<br />N
<br />.
<br />5.
<br />7
<br />
<br />S
<br />.
<br />F
<br />
<br />M
<br />I
<br />N
<br />I
<br />M
<br />U
<br />M
<br />1. MIN. SET CLEAR OPENING OF 5.7 SQUARE FEET.
<br />2. MIN. SET CLEAR HEIGHT OF 24 INCHES.
<br />3. WINDOW SILL CLEAR OPENING EMERGENCY EGRESS NO MORE THAN 44 INCHES ABOVE THE FLOOR.
<br />EMERGENCY EGRESS
<br />TEMPERED, SHATTER-PROOF ENCLOSURE OR
<br />CURTAIN ROD PROVIDED BY OWNER
<br />TUB / SHOWERTUB / SHOWERTUB / SHOWERTUB / SHOWER
<br />RIGID PLUMBING CONNECTION
<br />REQUIRED OR PROVIDE ACCESS PANEL
<br />SHOWERHEADS -1.8@ 80 PSI/GAL PER
<br />2022 CALIFORNIA GREEN BUILDING
<br />STANDARDS
<br />TEMPERED, SHATTER-PROOF
<br />ENCLOSURE PROVIDED BY OWNER
<br />SHOWERSHOWERSHOWERSHOWER
<br />SHOWERHEADS -1.8@ 80 PSI/GAL PER
<br />2022 CALIFORNIA GREEN BUILDING
<br />STANDARDS
<br />SPLASH -SEE INTERIOR ELEV.
<br />METAL HOOD W/FAN & LIGHT
<br />PROVIDE 110V OUTLET FOR HOOD
<br />@72" A.F.F (WHERE OCCURS)
<br />30" WIDE RANGE, U.N.O.
<br />SPLASH -SEE INTERIOR ELEV.
<br />12" OVERHEAD CABINETS
<br />REFRIGERATOR SPACE
<br />SOFFIT (WHERE OCCURS)
<br />SHELF BEYOND
<br />PANEL DOOR
<br />HINGE SIDE
<br />FIXED PANEL
<br />SPLASH-SEE INTERIOR
<br />ELEV.
<br />COUNTERTOP
<br />DRAWER
<br />TOE SPACE (SEE INTERIOR ELEVATIONS
<br />FOR HEIGHT) VENT OUT @ SINKS
<br />24" CLR.
<br />15
<br />"
<br />
<br />M
<br />I
<br />N
<br />.
<br />15
<br />"
<br />
<br />M
<br />I
<br />N
<br />.
<br />INDICATES 30"X24"
<br />REQUIRED
<br />CLEARANCE
<br />KITCHEN LAYOUTKITCHEN LAYOUTKITCHEN LAYOUTKITCHEN LAYOUT
<br />CABINET ELEVATION LAYOUTCABINET ELEVATION LAYOUTCABINET ELEVATION LAYOUTCABINET ELEVATION LAYOUT
<br />WATER CLOSETWATER CLOSETWATER CLOSETWATER CLOSET
<br />WATER CLOSET (1.28
<br />GAL/FLUSH MAX.) PER
<br />2022 CALIFORNIA GREEN
<br />BUILDING STANDARDS.
<br />SPLASH-SEE INTERIOR ELEV.
<br />VALATORY-FAUCETS 1.2 GAL/MIN
<br />@ 60PSI, 0.8 GAL/MIN @ 20 PSI MIN
<br />PER 2022 CALIFORNIA GREEN
<br />BUILDING STANDARDS
<br />RECESSED MEDICINE CABINET
<br />VALATORYVALATORYVALATORYVALATORY
<br />SPLASH-SEE INTERIOR ELEV.
<br />30" DOUBLE SINK FAUCET
<br />1.8 GAL/MIN. @ 60PSI 2022
<br />CALIFORNIA GREEN BUILDING
<br />STANDARDS
<br />GARBAGE DISPOSAL (PROVIDE
<br />ELECTRICAL OUTLET BELOW
<br />COUNTERTOP)
<br />24" DISHWASHER SPACE
<br />(PROVIDE ELECTRICAL OUTLET
<br />BELOW COUNTERTOP)
<br />KITCHEN SINK/GARBAGE DISPOSALKITCHEN SINK/GARBAGE DISPOSALKITCHEN SINK/GARBAGE DISPOSALKITCHEN SINK/GARBAGE DISPOSAL
<br />2025.03
<br />10.10.2025
<br />©2025Sheet No.
<br />Rev.
<br />Project No.
<br />Date Print:
<br />Design by
<br />TRINH HA.
<br />Date.
<br />Pr
<br />o
<br />j
<br />e
<br />c
<br />t
<br />:
<br />Description.
<br />1.07.23.2025Correction 1st.
<br />2.09.12.2025Correction 2nd.
<br />00-G-300
<br />CE
<br />N
<br />T
<br />E
<br />R
<br />
<br />S
<br />T
<br />
<br />CE
<br />N
<br />T
<br />E
<br />R
<br />
<br />S
<br />T
<br />
<br />CE
<br />N
<br />T
<br />E
<br />R
<br />
<br />S
<br />T
<br />
<br />CE
<br />N
<br />T
<br />E
<br />R
<br />
<br />S
<br />T
<br />
<br />----
<br />RE
<br />S
<br />I
<br />D
<br />E
<br />N
<br />C
<br />E
<br />RE
<br />S
<br />I
<br />D
<br />E
<br />N
<br />C
<br />E
<br />RE
<br />S
<br />I
<br />D
<br />E
<br />N
<br />C
<br />E
<br />RE
<br />S
<br />I
<br />D
<br />E
<br />N
<br />C
<br />E
<br />Ad
<br />d
<br />r
<br />e
<br />s
<br />s
<br />
<br />M
<br />a
<br />i
<br />n
<br />
<br />H
<br />o
<br />u
<br />s
<br />e
<br />:
<br />
<br />4
<br />2
<br />1
<br />
<br />S
<br />
<br />C
<br />e
<br />n
<br />t
<br />e
<br />r
<br />
<br />S
<br />t
<br />,
<br />
<br />S
<br />a
<br />n
<br />t
<br />a
<br />
<br />A
<br />n
<br />a
<br />,
<br />
<br />C
<br />A
<br />
<br />92
<br />7
<br />0
<br />3
<br />Ad
<br />d
<br />r
<br />e
<br />s
<br />s
<br />
<br />D
<br />e
<br />t
<br />a
<br />c
<br />h
<br />e
<br />d
<br />
<br />A
<br />D
<br />U
<br />:
<br />
<br />4
<br />2
<br />3
<br />
<br />S
<br />
<br />C
<br />e
<br />n
<br />t
<br />e
<br />r
<br />
<br />S
<br />t
<br />,
<br />
<br />S
<br />a
<br />n
<br />t
<br />a
<br />
<br />A
<br />n
<br />a
<br />,
<br />
<br />C
<br />A
<br />9
<br />2
<br />7
<br />0
<br />3
<br />GENERAL DETAILS
<br />GENERAL WINDOW NOTES
<br />TYPICAL FIXTURE
<br />GENERAL NOTESGENERAL NOTESGENERAL NOTESGENERAL NOTES
<br />WATER HEATER
|