Laserfiche WebLink
ESR-1-772 1 Most Widely Accepted and Trusted Page_tof 6 <br />9 For Configurations A and C (Horizontal) and B (2216 - Degree Downward) Installations. <br />1-EEI <br />1. Drill-Drill 1-inch-diameter hole <br />to specified depth with a carbide- <br />tipped drill bit, using rotation <br />only mode. For Configurations <br />A and C, drill 8 inches deep. For <br />Configuration B, drill to within 1 <br />inch of the opposite side of wall <br />(minimum 13 inches deep). <br />9 =m=mm==1 <br />Isecondsl <br />lizZN <br />80 psI <br />min. <br />2. Blow-Remove dust from hole <br />with oil-free compressed air <br />for a minimum 014 seconds. <br />Compressed air nozzle MUST <br />reach the bottom of the hole. <br />14L <br />I cycles 17 <br />3. Brush-Clean with a 1-inch-diameter <br />nylon brush for a minimum of 4 <br />cycles. Brush MUST reach the <br />bottom of the hole. Brush should <br />provide resistance to insertion. 11 no <br />resistance is felt, the brush is wom <br />and must be replaced. <br />seconds <br />80 psi <br />min. r E--- <br />4. Blow-Remove dust from hole <br />with oil-free compressed air <br />for a minimum of 4 seconds. <br />Compressed air nozzle MUST <br />reach the bottom of the hole. <br />1. Check-Check cartridge <br />expiration date. Do not <br />use expired product. <br />Product is usable until <br />end of printed expiration <br />month. <br />2. Open-Open <br />cartridge <br />per package <br />instructions. <br />3. Attach-Attach proper <br />Simpson Strong-Ties <br />nozzle to cartridge. <br />Do not modify nozzle. <br />4. Insert-Insert cartridge <br />Into dispensing tool. <br />5. Dispense-Dispense adhesive <br />to the side until properly <br />mixed (uniform color). <br />111;EMENTâ„¢ For Configurations A (Horizontal) and B (22W - Degree Downward) Installations. <br />?=1 <br />1. Fill-Fill screen completely. Fill <br />from the bottom of the screen <br />and withdraw the nozzle as the <br />screen fills to prevent air pockets. <br />(Opti-Mesh® screens: Close <br />integral cap alter filling.) <br />2. Insert-Insert adhesive <br />filled screen into hole. <br />3. Insert-Insert clean, oil-free <br />anchor, turning slowly until <br />the anchor contacts the <br />bottom olthe screen. <br />4. Do not disturb-Do not <br />disturb anchor until <br />fully cured. (See cure <br />schedule for specific <br />adhesive.) <br />Note: Opti-Mesh® plastic screens or steel wire mesh screens may be used for Configurations A and B. <br /> OlllRIBillililm For Configuration C (Horizontal Through-Bolt) Installation. <br />1. Fill-Fill screen completely. <br />Fill from the bottom of the <br />screen and withdraw the <br />nozzle as the screen fills to <br />prevent air pockets. <br />5. Drill-Drill through plastic plug <br />in (inside) end of steel steeve <br />and completely through the wall <br />with W carbide tipped concrete <br />drill bit (rotation mode only) <br />Sleave <br />Inside <br />Steel <br />Screen <br />Tube <br />2. Insert-Insert adhesive <br />lilled screen into hole. <br />3. Insert-Insert steel sleeve (capped 4. Cure-Allow adhesive to cure <br />end first) slowly into screen tube (see Cure Time Table 1). <br />(adhesive will displace). <br />/7 Iseut k=11-11«LEI6. Insert-Insert W| rod through hole | SlaVE ,d--1--,=214and attach metal <br />plate and nut.ROD 1,--EW <br />W DIA# <br />Note: Steel wire mesh screens shall be used for Configuration C. <br />FIGURE 2-MANUFACTURER'S PUBLISHED INSTALLATION INSTRUCTIONS (MPII) FOR UNREINFORCED BRICK MASONRY <br />11 11' 1