Laserfiche WebLink
@ AT <br />A.B. ANCHOR BOLT <br />A.C. ASPHALTIC CONCRETE <br />ACOUS. ACOUSTICAL <br />ALT. ALTERNATE <br />ACS.ACRES <br />A.D. AREA DRAIN <br />ALUM. ALUMINUM <br />A.T. ASPHALT TILE <br />ADJ. ADJUSTABLE <br />A.F.F. ABOVE FINISH FLOOR <br />A.F.S. ABOVE FINISH SURFACE <br />BD.BOARD <br />B.B. BREAD BOARD <br />BLK.BLOCK <br />BLKG.BLOCKING <br />BM.BEAM <br />BOT.BOTTOM <br />BLDG.BUILDING <br />BET.BETWEEN <br />C.L. CENTER LINE <br />C.B. CATCH BASIN <br />CEM.CEMENT <br />CER.CERAMIC <br />C.I.P.CAST IRON PIPE <br />CLG.CEILING <br />CLO.CLOSET <br />CLR.CLEAR <br />C.O.CLEAN OUT <br />COL.COLUMN <br />COM.COMMON <br />CONC.CONCRETE <br />CONT.CONTINUOUS <br />C.W.COLD WATER <br />C.T.CERAMIC TILE <br />C.YD.CUBIC YARD <br />DET.DETAIL <br />D.F.DRINKING FOUNTAIN <br />D.D.DOOR DIMENSION <br />DIA.DIAMETER <br />DWG.DRAWING <br />D.S.DOWN SPOUT <br />D.W.DISHWASHER <br />DR.DOOR <br />DIM.DIMENSION <br />EA.EACH <br />ELEC.ELECTRICAL <br />ELEV.ELEVATION <br />ENCL.ENCLOSURE <br />EXH.EXHAUST <br />EXIST.EXISTING <br />EXP.EXPANSION <br />EXT.EXTERIOR <br />E.J.EXPANSION JOINT <br />F.D.FLOOR DRAIN <br />F.E.C.FIRE EXTINGUISHER CABINET <br />F.G.FUEL GAS <br />F.F.FINISH FLOOR <br />F.H.C.FIRE HOSE CABINET <br />FIN.FINISH <br />F.J.FLOOR JOIST <br />FLR.FLOOR <br />FLRG.FLOORING <br />FTG.FOOTING <br />F.G.FIXED GLASS <br />F.S.FLOOR SINK <br />FLOUR.FLUORESCENT <br />F.O.C.FACE OF CONCRETE <br />F.O.F.FACE OF FINISH <br />F.O.M.FACE OF MASONRY <br />F.O.S.FACE OF STUD <br />F.O.SHT'G.FACE OF SHEATHING <br />GA.GAUGE <br />GALV.GALVANIZED <br />G.I.GALVANIZED IRON <br />G.D.GARBAGE DISPOSAL <br />GL.GLASS <br />GR.GRADE <br />GYP. BD.GYPSUM BOARD <br />H.B.HOSE BIBB <br />HWD.HARD WOOD <br />HGT HEIGHT <br />H. PT.HIGH POINT <br />HDR.HEADER <br />HTR.HEATER <br />H.W.HOT WATER <br />HORIZ.HORIZONTAL <br />H.C.HOLLOW CORE <br />I.D.INSIDE DIAMETER <br />INT.INTERIOR <br />INSUL INSULATION <br />INV.INVERT <br />I.P.S.IRON PIPE SIZE <br />I.I.C.IMPACT ISOLATION CLASS <br />ABBREVIATIONS <br />JAN.JANITOR <br />JST.JOIST <br />JT.JOINT <br />KIT.KITCHEN <br />LAM.LAMINATED <br />LAV.LAVATORY <br />LGTH.LENGTH <br />LKR.LOCKER <br />MIN.MINIMUM <br />MAS.MASONRY <br />MAX.MAXIMUM <br />MECH.MECHANICAL <br />MEMB.MEMBRANE <br />MTL.METAL <br />M.H.MAN HOLE <br />MISC.MISCELLANEOUS <br />M.O.MASONRY OPENING <br />M.R.MOISTURE RESISTANT <br />MFG.MANUFACTURER <br />N.I.C.NOT IN CONTRACT <br />NO.NUMBER <br />NOM.NOMINAL <br />N.T.S.NOT TO SCALE <br />OBSC.OBSCURE <br />O.C.ON CENTER <br />O.D.OUTSIDE DIAMETER <br />OFF.OFFICE <br />OPG.OPENING <br />OV.OVEN <br />O.F.OVER FLOW <br />OPP.OPPOSITE <br />P.L.PROPERTY LINE <br />PL. PLATE <br />PART'N PARTITION <br />PLST.PLASTER <br />PLYWD.PLYWOOD <br />PR.PAIR <br />P.L.PLASTIC LAMINATE <br />R.RISER <br />RAD.RADIUS <br />REINF.REINFORCEMENT <br />RES.RESILIENT <br />R.D.ROOF DRAIN <br />RM.ROOM <br />R.O.ROUGH OPENING <br />REF.REFRIGERATOR <br />REQ'D REQUIRED <br />S.A.F.SELF ADHERED FLASHING <br />S.C.SOLID CORE <br />SHT.SHEET <br />SIM.SIMILAR <br />SQ.SQUARE <br />STD.STANDARD <br />STL.STEEL <br />S.S. STAINLESS STEEL <br />SUSP. SUSPENDED <br />SPECS. SPECIFICATIONS <br />STOR.STORAGE <br />S.T.C.SOUND TRANSMISSION <br /> CLASS <br />SQ.FT.SQUARE FOOT <br />T.TREAD <br />TEL.TELEPHONE <br />TERR.TERRAZZO <br />T & G TONGUE AND GROOVE <br />T.O.C.TOP OF CURB <br />T.O.W.TOP OF WALL <br />TYP.TYPICAL <br />THRU.THROUGH <br />TEMP.TEMPERED <br />T.O.P.TOP OF PARAPET <br />T.O.PL TOP OF PLATE <br />U. URINAL <br />U.N.O.UNLESS NOTED <br /> OTHERWISE <br />VERT.VERTICAL <br />VEST.VESTIBULE <br />V.C.T.VINYL COMPOSITE TILE <br />W/WITH <br />W.B.M.WEATHER BARRIED <br /> MEMBRANE <br />WAINS.WAINSCOT <br />W.C.WATER CLOSET <br />WD.WOOD <br />W.H.WATER HEATER <br />WP.WATER PROOF <br />SYMBOLS <br />cX CONCRETE GRIDLINE -SLAB EDGE / PERIMETER <br />-u.o.n. gridline is to edge of concrete slab or exterior face of conc. wall <br />-when shown on wood levels these concrete colum grids indicate both edge <br />of slab aswell as exterior face of sheating <br />X WOOD GRIDLINE -TYPICAL <br />-u.o.n. gridline is to centerline of wood stud framing <br />X WOOD GRIDLINE -FACE OF STUD <br />-u.o.n. gridline is to face of ext. grade gyp. bd. (face of sheathing <br />where ext. grade gyp. bd. does not occur) <br />EQ <br />EQ <br />WALL TYPX <br />WH (TYPE)DETAIL NO. <br />SHEET NO. <br />SECTION NO. <br />SHEET NO. <br />DOOR <br />WH (TYPE) <br />WINDOW <br />CONCEPTUAL IMAGERY <br />VICINITY MAP <br />MAIN ST. <br />SITE <br />5 FWY <br />55 FWY <br />EL <br />K <br /> <br />L <br />N <br />. <br />NORTH <br />1ST ST. <br />4TH ST. <br />GO <br />L <br />D <br />E <br />N <br /> <br />C <br />I <br />R <br />. <br /> <br />D <br />R <br />. <br />CA <br />B <br />R <br />I <br />L <br />L <br />O <br /> <br />P <br />A <br />R <br />K <br /> <br />D <br />R <br />. <br />TU <br />S <br />T <br />I <br />N <br /> <br />A <br />V <br />E <br />. <br />YO <br />R <br />B <br />A <br /> <br />S <br />T <br />. <br />al <br />l <br /> <br />i <br />d <br />e <br />a <br />s <br />, <br /> <br />d <br />e <br />s <br />i <br />g <br />n <br />s <br /> <br />a <br />n <br />d <br /> <br />p <br />l <br />a <br />n <br />s <br /> <br />r <br />e <br />p <br />r <br />e <br />s <br />e <br />n <br />t <br />e <br />d <br /> <br />b <br />y <br /> <br />t <br />h <br />i <br />s <br /> <br />d <br />r <br />aw <br />i <br />n <br />g <br /> <br />a <br />r <br />e <br /> <br />t <br />h <br />e <br /> <br />e <br />x <br />c <br />l <br />u <br />s <br />i <br />v <br />e <br /> <br />p <br />r <br />o <br />p <br />e <br />r <br />t <br />y <br /> <br />o <br />f <br /> <br />bs <br />b <br /> <br />d <br />e <br />s <br />i <br />g <br />n <br />, <br /> <br />i <br />n <br />c <br />. <br /> <br />an <br />d <br /> <br />s <br />h <br />a <br />l <br />l <br /> <br />n <br />o <br />t <br /> <br />b <br />e <br /> <br />r <br />e <br />p <br />r <br />o <br />d <br />u <br />c <br />e <br />d <br /> <br />i <br />n <br /> <br />w <br />h <br />o <br />l <br />e <br /> <br />o <br />r <br /> <br />i <br />n <br /> <br />p <br />a <br />r <br />t <br /> <br />w <br />i <br />t <br />ho <br />u <br />t <br /> <br />t <br />h <br />e <br /> <br />e <br />x <br />p <br />r <br />e <br />s <br />s <br /> <br />p <br />r <br />i <br />o <br />r <br /> <br />w <br />r <br />i <br />t <br />t <br />e <br />n <br /> <br />p <br />e <br />r <br />m <br />i <br />s <br />s <br />i <br />o <br />n <br /> <br />o <br />f <br /> <br />s <br />a <br />i <br />d <br /> <br />a <br />rc <br />h <br />i <br />t <br />e <br />c <br />t <br />s <br />, <br /> <br />a <br />n <br />y <br /> <br />u <br />n <br />a <br />u <br />t <br />h <br />o <br />r <br />iz <br />e <br />d <br /> <br />r <br />e <br />u <br />s <br />e <br /> <br />o <br />f <br /> <br />t <br />h <br />e <br />s <br />e <br /> <br />p <br />l <br />a <br />n <br />s <br /> <br />o <br />t <br />h <br />e <br />r <br /> <br />t <br />h <br />a <br />n <br /> <br />f <br />o <br />r <br /> <br />t <br />h <br />e <br /> <br />p <br />r <br />o <br />j <br />e <br />c <br />t <br />a <br />n <br />d <br /> <br />l <br />o <br />c <br />a <br />t <br />i <br />o <br />n <br /> <br />s <br />h <br />o <br />w <br />n <br /> <br />i <br />s <br /> <br />p <br />r <br />o <br />h <br />i <br />b <br />i <br />t <br />e <br />d <br />. <br />JOB NO. <br />SUBMITTAL <br />DATE <br />SHEET TITLE <br />SHEET NO. <br />CLIENT: <br />Plot Date:File: <br />REVISION <br />DATE <br />21 <br />3 <br />0 <br /> <br />E <br /> <br />4 <br />T <br />H <br /> <br />S <br />T <br /> <br /># <br />2 <br />0 <br />0 <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />1ST PLAN CHECK SUBMITTAL 08/20/2024 <br />970 W. 190TH ST., STE 250, TORRANCE CA 90502 <br />O: 310.217.8885 <br />BSBDESIGN.COM <br />D E S I G N <br />BSB <br />4TH P.C. SUBMITTAL <br />07/08/2025 <br />2ND PLAN CHECK SUBMITTAL 01/29/2025 <br />3RD PLAN CHECK SUBMITTAL 04/17/2025 <br />4TH PLAN CHECK SUBMITTAL 07/08/2025 <br />11/4/2025 8:52:13 PM <br />MR230056 <br />A001 <br />TITLE SHEET <br />OL <br />I <br />V <br />E <br /> <br />C <br />R <br />E <br />S <br />T <br /> <br />R <br />E <br />S <br />I <br />D <br />E <br />N <br />T <br />I <br />A <br />L <br />21 <br />5 <br />0 <br /> <br />E <br />. <br /> <br />F <br />O <br />U <br />R <br />T <br />H <br /> <br />S <br />T <br />. <br /> <br />& <br /> <br />2 <br />1 <br />6 <br />0 <br /> <br />E <br />. <br /> <br />F <br />O <br />U <br />R <br />T <br />H <br /> <br />S <br />T <br />. <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />OL <br />I <br />V <br />E <br /> <br />C <br />R <br />E <br />S <br />T <br />OLIVE CREST RESIDENTIAL <br />2150 E. FOURTH ST. & 2160 E. FOURTH ST. <br />SANTA ANA CA 92705 <br />OLIVE CREST <br />OLIVE CREST <br />ARCHITECTURAL SHEET LIST <br />NUMBER NAME <br />A001 TITLE SHEET <br />A020 PROJECT INFORMATION <br />A030 CONDITIONS OF APPROVAL <br />A041 CAL GREEN Notes - Residential <br />A042 CAL GREEN Checklist - Residential <br />A043 CAL GREEN Checklist - Residential <br />A051 MITIGATION MEASURES <br />A052 MITIGATION MEASURES <br />A071 GENERAL CONSTRUCTION/ MATERIAL SPECIFICATIONS & FIRE DEPARTMENT NOTES <br />A081 CBC 11A DIV I & DIV II SITE ACCESSIBILITY NOTES <br />A082 CBC 11A DIV I & DIV II SITE ACCESSIBILITY NOTES - Cont <br />A084 CBC 11A DIV. III BUILDING FEATURES <br />A085 CBC 11A DIV. IV DWELLING UNIT FEATURES <br />A086 CBC 11A DIV. IV DWELLING UNIT FEATURES <br />A088 CBC 11A DIV. V COMMON EXTERIOR & INTERIOR FEATURES ACCESSIBILITY NOTES <br />A089 CBC 11A DIV. IV SITE & SIGNAGE ACCESSIBILITY DETAILS, AND DIV. IV BATHROOM <br />ACCESSIBILITY DETAILS <br />A093 CBC 11A - KITCHEN & BATHROOM DETAILS <br />A100 SITE PLAN <br />A101 EXISTING SITE PLAN / DEMOLITION PLAN <br />A102 PRECISE GRADING AND PAVING PLAN <br />A103 PRECISE GRADING AND PAVING PLAN <br />A111 BUILDING LEVEL 1 PLAN <br />A112 BUILDING LEVEL 2 PLAN <br />A113 ROOF PLAN <br />A201 EXTERIOR ELEVATIONS & SECTIONS <br />A301 WALL SECTIONS <br />A400 DOOR & WINDOW SCHEDULE <br />A500 TYPICAL BATHROOM AND KITCHEN INFORMATION <br />A810 FIRE RATED PENETRATIONS <br />A811 FIRE ASSEMBLY GENERAL DETAILS AND NOTES <br />A812 FIRE ASSEMBLY WALL, FLOOR/CEILING & ROOF/CEILING <br />A821 WINDOW FLASHING <br />A822 DOOR & WINDOW DETAILS <br />A831 ROOF - MANSARD - SHINGLE <br />A851 EXTERIOR - STUCCO & STONE DETAILS <br />A852 EXTERIOR DETAILS CONT. <br />A853 GUARDRAIL - METAL & WOOD <br />A901 TRASH ENCLOSURE, GATE, FENCE & LIGHT POST DETAILS <br />A902 CURB RAMPS, DETECTABLE WARNINGS, & GRADE SEPARATION DETAILS <br />39Contact: ERIC HIGUCHI ehiguchi@Qtative.com <br />SANTA ANA, CA. 92705 <br />CLIENT INFORMATION <br />OLIVECREST <br />(949) 290-7510 <br />2130 E 4TH ST #200 <br />CONSULTANT INFORMATION <br />CONTACT: DIRK THELEN dthelen@bsbdesign.com <br />TORRANCE, CA 90502 <br />ARCHITECT <br />BSB DESIGN, INC. -LOS ANGELES <br />P: 310.217.8885 <br />F: 310.217.0425 <br />970 WEST 190TH STREET, SUITE 250 <br />CONTACT: HOGAN RANGEL hrangel@esgsinc.com <br />TEEMCULA, CA 92590 <br />SOIL ENGINEER <br />EARTH STRATA GEOTECHNICAL SERVICES INC <br />P: 951.365.3561 <br />- <br />43391 BUSINESS PARK DR. SUITE C4 <br />Contact: SAMANTHA FABING sfabing@fuscoe.com <br />IRVINE, CA. 92618 <br />CIVIL ENGINEER <br />FUSCOE ENGINEERING <br />(805) 717-8778 <br />15535 SAND CANYON AVE, SUITE 100 <br />Contact: HUAN NGUYEN hnguyen@gouvisgroup.com <br />IRVINE, CA. 92618 <br />STRUCTURAL ENGINEER <br />GOUVIS ENGINEERING <br />(949) 590-9009 <br />(000) 000-0000 <br />15 STUDEBAKER <br />Contact: ROBERT GOMEZ rgomez@gouvisgroup.com <br />IRVINE, CA. 92618 <br />MECHANICAL ENGINEER <br />GOUVIS ENGINEERING <br />(949) 590-9012 <br />15 STUDEBAKER <br />Contact: ROBERT GOMEZ rgomez@gouvisgroup.com <br />IRVINE, CA. 92618 <br />ELECTRICAL ENGINEER <br />GOUVIS ENGINEERING <br />(949) 590-9012 <br />15 STUDEBAKER <br />Contact: ROBERT GOMEZ rgomez@gouvisgroup.com <br />IRVINE, CA. 92618 <br />PLUMBING ENGINEER <br />GOUVIS ENGINEERING <br />(949) 590-9012 <br />15 STUDEBAKER <br />Contact: PAUL MAKSY paul@canyonparkstudio.com <br />COSTA MESA, CA 92627 <br />LANDSCAPE ARCHITECT <br />CANYON PARK STUDIO <br />(949) 612-5191 <br />910 DOGWOOD STREET <br />Contact: ROBERT GOMEZ rgomez@gouvisgroup.com <br />IRVINE, CA. 92618 <br />ENERGY/ TITLE 24 CONSULTANT <br />GOUVIS ENGINEERING <br />(949) 590-9012 <br />15 STUDEBAKER <br />SHEET LIST - MECHANICAL <br />NUMBER NAME <br />SHEET LIST - CIVIL <br />NUMBER NAME <br />THE MECHANICAL DRAWINGS AND CALCULATIONS ACCOMPANYING THESE <br />DRAWINGS HAVE NOT BEEN PREPARED BY, OR UNDER THE DIRECTION OF, THE BSB <br />DESIGN, INC. THE BSB DESIGN, INC. THEREFORE ASSUMES NO LIABILITY FOR THE <br />COMPLETENESS OR CORRECTNESS OF THESE DRAW <br />SHEET LIST - PLUMBING <br />NUMBER NAME <br />DEFERRED SUBMITTAL DOCUMENTS SHALL BE PREPARED UNDER THE <br />DIRECTION OF THE CONTRACTOR AND SHALL BE REVIEWED AND <br />APPROVED BY THE CONTRACTOR PRIOR TO SUBMITTAL TO THE <br />ARCHITECT AND/OR ENGINEER. THE DOCUMENTS FOR DEFERRED <br />SUBMITTAL ITEMS SHALL THEN BE SUBMITTED TO THE ARCHITECT <br />AND/OR ENGINEER FOR REVIEW AND COORDINATION. FOLLOW ING <br />REVIEW BY THE DESIGN PROFESSIONAL, THE CONTRACTOR SHALL <br />FORWARD THE DOCUMENTS TO THE CITY FOR REVIEW AND APPROVAL, <br />WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL <br />DOCUMENTS HAVE BEEN REVIEWED AND BEEN FOUND TO BE IN <br />GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING. <br />PLANS AND/OR CALCULATIONS FOR THE DEFERRED SUBMITTAL ITEMS <br />SHALL BE SUBMITTED IN A TIMELY MANNER THAT ALLOWS A MINIMUM <br />30 WORKING DAYS FOR INITIAL PLAN REVIEW. ALL COMMENTS RELATED <br />TO THE DEFERRED SUBMITTAL MUST BE ADDRESSED TO THE <br />SATISFACTION OF THE PLAN CHECKER DIVISION PRIOR TO APPROVAL <br />OF THE SUBMITTAL ITEMS. THE DEFERRED SUBMITTAL ITEMS SHALL <br />NOT BE INSTALLED UNTIL DESIGN AND SUBMITTAL DOCUMENTS HAVE <br />BEEN APPROVED BY THE BUILDING OFFICIAL. <br />PLANS FOR FIRE SPRINKLERS MUST BE SUBMITTED TO AND APPROVED <br />BY FIRE PLAN CHECK BEFORE THIS EQUIPMENT IS INSTALLED. <br />A) FIRE ALARM SYSTEM <br />DEFERRED SUBMITTAL: <br />SEPARATE PERMIT REQUIRED <br />1) GRADING WORK <br />B) FIRE SPRINKLER SYSTEM <br />3) ELECTRICAL, MECHANICAL AND/OR PLUMBING WORK <br />2) DEMOLITION <br />4) FIRE SPRINKLER SYSTEM AND FIRE ALARM SYSTEM <br />DEFERRED ITEMS <br />C) SIGNS/SIGNAGE <br />D) ROOF TRUSS PLANS AND CALCULATIONS <br />5) SIGNS/SIGNAGE <br />C-1 TITLE SHEET <br />M-0.1 GENERAL NOTES & LEGENDS <br />M-0.2 EQUIPMENT SCHEDULES <br />M-1.1 SITE PLAN <br />M-2.1 BUILDING A1 -LEVEL 1 FLOOR PLAN <br />M-2.2 BUILDING A2 -LEVEL 1 FLOOR PLAN <br />M-2.3 BUILDING A1, A2 LEVEL 2 FLOOR PLAN <br />M-3.1 UNIT FLOOR PLAN <br />MD-1 DETAILS P-0.1 GENERAL NOTES & SHEET INDEX <br />P-0.2 MATERIAL AND FIXTURE SCHEDULES <br />P-0.3 CALCULATIONS <br />C-2 NOTES & DETAILS <br />C-3 DEMOLITION PLAN <br />C-4 PRECISE GRADING PLAN & PAVING PLAN <br />M-2.4 BUILDING A1, A2 ROOF PLAN <br />A <br />THIS PROJECT IS 100% PRIVATELY FUNDED / PRIVATELY OWNED A <br />6) FENCES AND GATES <br />P-1.1 SITE PLAN <br />P-2.1A BUILDING A1 -LEVEL 1 FLOOR PLAN COLD WATER <br />P-2.1B BUILDING A1 -LEVEL 2 FLOOR PLAN COLD WATER <br />P-2.1C BUILDING A1 -LEVEL 1 FLOOR PLAN WASTE / VENT PIPING <br />P-2.1D BUILDING A1 -LEVEL 2 FLOOR PLAN WASTE / VENT PIPING <br />P-2.1E BUILDING A1 -ROOF PLAN VENT THRU ROOF <br />P-2.2B BUILDING A2 -LEVEL 2 FLOOR PLAN COLD WATER <br />P-2.2C BUILDING A2 -LEVEL 1 FLOOR PLAN WASTE / VENT PIPING <br />P-2.2A BUILDING A2 -LEVEL 1 FLOOR PLAN COLD WATER <br />P-2.2D BUILDING A2 -LEVEL 2 FLOOR PLAN WASTE / VENT PIPING <br />P-2.2E BUILDING A2 -ROOF PLAN VENT THRU ROOF <br />P-3.1 UNIT FLR PLANS COLD / HOT WTR WASTE / VENT PIPING & FC CONDENSATE <br />P-4.1 WATER DIAGRAM <br />P-0.4 WATER HEATER SPECIFICATIONS <br />SHEET LIST - ENERGY/ T24 <br />NUMBER NAME <br />THE PLUMBING DRAWINGS AND CALCULATIONS ACCOMPANYING THESE DRAWINGS <br />HAVE NOT BEEN PREPARED BY, OR UNDER THE DIRECTION OF, THE BSB DESIGN, <br />INC. THE BSB DESIGN, INC. THEREFORE ASSUMES NO LIABILITY FOR THE <br />COMPLETENESS OR CORRECTNESS OF THESE DRAW <br />THE ENERGY/TITLE 24 DRAWINGS AND CALCULATIONS ACCOMPANYING THESE <br />DRAWINGS HAVE NOT BEEN PREPARED BY, OR UNDER THE DIRECTION OF, THE BSB <br />DESIGN, INC. THE BSB DESIGN, INC. THEREFORE ASSUMES NO LIABILITY FOR THE <br />COMPLETENESS OR CORRECTNESS OF THESE DRAW <br />T24-1 TITLE 24 ENERGY COMPLIANCE FORMS BLDG A1 <br />T24-2 TITLE 24 ENERGY COMPLIANCE FORMS BLDG A1 CON'T <br />T24-3 TITLE 24 ENERGY COMPLIANCE FORMS BLDG A2 <br />T24-4 TITLE 24 ENERGY COMPLIANCE FORMS BLDG A2 CON'T <br />T24-MM TITLE 24 FORMS MANDATORY MEASURES <br />P-4.2 WASTE / VENT DIAGRAM <br />P-4.3 WASTE / VENT DIAGRAM <br />P-D.1 DETAILS <br />A <br />SHEET LIST - STRUCTURAL <br />NUMBER NAME <br />THE STRUCTURAL DRAWINGS AND CALCULATIONS ACCOMPANYING THESE <br />DRAWINGS HAVE NOT BEEN PREPARED BY, OR UNDER THE DIRECTION OF, THE BSB <br />DESIGN, INC. THE BSB DESIGN, INC. THEREFORE ASSUMES NO LIABILITY FOR THE <br />COMPLETENESS OR CORRECTNESS OF THESE DRAW <br />SN1 GENERAL NOTES & REQUIREMENTS <br />SN1.1 GENERAL NOTES & REQUIREMENTS <br />S-1.1 P.T. FOUNDATION PLAN BUILDING A1 & A2 <br />S-1.2 FLOOR FRAMING PLAN BUILDING A1 & A2 <br />S-1.3 ROOF FRAMING PLAN BUILDING A1 & A2 <br />S1 FRAMING PLAN UNIT A-1 <br />SN2 STRUCTURAL DETAIL & NOTES <br />SN3 STRUCTURAL DETAIL & NOTES <br />SD2 GENERAL DETAILS & NOTES <br />SD3 STRUCTURAL DETAILS <br />SD4 STRUCTURAL DETAILS <br />PT1 POST TENSION MAT FOUNDATION DETAILS & NOTES <br />S-LS1 GENERAL NOTES & DETAILS <br />S-LS2 LANDSCAPE DETAILS & NOTES <br />THE CIVIL DRAWINGS AND CALCULATIONS ACCOMPANYING THESE DRAWINGS HAVE <br />NOT BEEN PREPARED BY, OR UNDER THE DIRECTION OF, THE BSB DESIGN, INC. THE <br />BSB DESIGN, INC. THEREFORE ASSUMES NO LIABILITY FOR THE COMPLETENESS OR <br />CORRECTNESS OF THESE DRAWI <br />C-5 PRECISE GRADING PLAN & PAVING PLAN <br />C-6 SECTIONS <br />C-7 STORM DRAIN PLAN <br />C-8 UTILITY PLAN <br />C-9 EROSION CONTROL <br />C-10 EROSION CONTROL DETAILS <br />C-11 DETAILS <br />SHEET LIST - ELECTRICAL <br />NUMBER NAME <br />E-0.0 SHEET INDEX & GENERAL NOTES <br />E-0.1A SPECIFICATIONS NOTES <br />E-0.1B GENERAL NOTES <br />E-0.1C MANDATORY MEASURES NOTES <br />E-0.2 ABBREVIATIONS & SYMBOLS LIST <br />E-0.3A DETAILS <br />E-0.4 SINGLE LINE DIAGRAM & EQUIPMENT ELEVATION <br />E-0.5 LOAD CALCULATIONS & EQUIPMENT SCHEDULES <br />E-0.6 PANEL SCHEDULES <br />E-1.2 SITE LIGHTING PLAN <br />E-1.3 PHOTOMETRIC SITE PLAN <br />E-1.4 LIGHTING SPECIFICATIONS <br />E-2.1 BUILDING A1 LEVEL 1 FLOOR POWER PLAN <br />E-2.2 BUILDING A1 LEVEL 2 FLOOR POWER PLAN <br />E-2.3 BUILDING A1 ROOF PLAN <br />E-2.4 BUILDING A2 LEVEL 1 FLOOR POWER PLAN <br />E-1.1 SITE UTILITY PLAN <br />THE ELECTRICAL DRAWINGS AND CALCULATIONS ACCOMPANYING THESE <br />DRAWINGS HAVE NOT BEEN PREPARED BY, OR UNDER THE DIRECTION OF, THE BSB <br />DESIGN, INC. THE BSB DESIGN, INC. THEREFORE ASSUMES NO LIABILITY FOR THE <br />COMPLETENESS OR CORRECTNESS OF THESE DRAW <br />E-4.1 NORMAL PHOTOMETRIC -LEVEL 1 <br />E-4.2 NORMAL PHOTOMETRIC -LEVEL 2 <br />E-4.3 EGRESS PHOTOMETRIC -LEVEL 1 <br />E-4.4 EGRESS PHOTOMETRIC -LEVEL 2 <br />E-4.5 LIGHTING SPECIFICATIONS <br />E-5.1 TITLE 24 LTO OUTDOOR FORMS <br />E-3.1 UNIT PLANS <br />E-2.5 BUILDING A2 LEVEL 2 FLOOR POWER PLAN <br />E-0.3B DETAILS <br />E-0.3C DETAILS <br />E-0.3D DETAILS <br />E-2.6 BUILDING A2 ROOF PLAN <br />E-2.7 BUILDING A1 LEVEL 1 FLOOR LIGHTING PLAN <br />E-2.8 BUILDING A2 LEVEL 2 FLOOR LIGHTING PLAN <br />E-2.9 BUILDING A2 LEVEL 1 FLOOR LIGHTING PLAN <br />E-2.10 BUILDING A2 LEVEL 2 FLOOR LIGHTING PLAN <br />E-5.2 TITLE 24 LTI INDOOR FORMS UNIT A-1 -LAUNDRY PARTIAL <br />7) 19.2 kWdc MIN. SOLAR PV SYSTEM B <br />C-12 DETAILS <br />C-13 HORIZONTAL CONTROL PLAN <br />E) FENCES AND GATES C <br />C <br />C <br />A PC COMMENTS RESPONSE #1 01/29/2025 <br />B PC COMMENTS RESPONSE #2 04/17/2025 <br />C PC COMMENTS RESPONSE #3 07/08/2025 <br />1 DELTA 1 10/31/2025