Laserfiche WebLink
M <br />BDD <br />UP <br />DN <br />A.D. <br />12X24 <br />H <br />C <br />FD <br />FSD <br />8Ø <br />SA <br />UP <br />DN <br />RA EA <br />NECK SIZE/TAG <br />AIR FLOW (CFM) <br />T <br />S <br />P <br />T <br />SD <br />TS <br />HS <br /># <br />DESIGNATION <br />C <br />CO <br />GENERAL NOTES <br />1.MECHANICAL SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE CALIFORNIA MECHANICAL <br />CODE (CMC) AND ALL APPLICABLE LOCAL CODES AND REGULATIONS WITH AMENDMENTS (LATEST <br />EDITION). <br />2.ALL DIMENSIONS SHOWN ON THESE PLANS ARE APPROXIMATE AND MUST BE CONFIRMED ON SITE. <br />3.PROVIDE ANCHORAGE FOR ALL PIPING, DUCTWORK, AND EQUIPMENT IN ACCORDANCE WITH THE <br />LATEST EDITION OF GUIDELINES FOR SEISMIC RESTRAINTS OF MECHANICAL SYSTEMS AND <br />PLUMBING PIPING SYSTEMS PER SMACNA. <br />4.VENTILATION SYSTEMS DESIGNED AND INSTALLED SHALL MEET ASHRAE 62.2 REQUIREMENTS. <br />5.WHERE DEEMED ARCHITECTURALLY UNACCEPTABLE TO PROVIDE ADEQUATE DOOR UNDERCUT FOR <br />PROPER AIR RETURN BETWEEN ROOMS, TRANSFER GRILLS SHALL BE INSTALLED AND COORDINATED <br />WITH THE ARCHITECT. <br />6.WHEN SUPPLIED, DESIGN ENGINEER SHALL REVIEW AND APPROVE SUBMITTALS FOR ALL EQUIPMENT. <br />IN THE CASE WHERE SUGGESTED SUBSTITUTE IS NOT ADEQUATE, SUBMITTAL SHALL BE RETURNED <br />TO CONTRACTOR AND STAMPED AS "REVIEW AND RESUBMIT." SUBMITTAL APPROVAL CONFIRMS <br />ONLY THAT SUGGESTED SUBSTITUTE HAS EQUIVALENT TECHNICAL PARAMETERS AND DESIGN <br />CONSULTANT IS NOT RESPONSIBLE FOR ANY FINANCIAL IMPACT THAT THIS SUBSTITUTE CAUSES. <br />7.RESIDENTIAL HVAC SYSTEMS WITH CENTRAL FORCED AIR UNITS (FURNACES OR FAN COILS) HAVE <br />LIMITED ZONING AND TEMPERATURE CONTROL ABILITY. THIS TYPE OF SYSTEMS ARE NOT CAPABLE <br />OF CONTROLLING TEMPERATURES IN EACH ROOM INDIVIDUALLY. TEMPERATURES CAN BE <br />CONTROLLED ONLY IN REFERENCE ROOMS WHERE THERMOSTATS ARE LOCATED. WHEN INDIVIDUAL <br />ROOM TEMPERATURE CONTROL IS CRITICAL, CLIENT SHALL CONSULT WITH DESIGN TEAM AND <br />CONTRACTORS FOR DIFFERENT SYSTEMS/SOLUTIONS. <br />A. GENERAL <br />1.BEFORE SUBMITTING BID, CONTRACTOR SHALL SURVEY THE ENTIRE PROJECT SITE AND BECOME <br />THOROUGHLY FAMILIAR WITH ACTUAL EXISTING CONDITIONS. THE INTENT OF WORK IS SHOWN ON <br />THE DRAWINGS AND DESCRIBED HEREIN. BY THE ACT OF SUBMITTING A BID PROPOSAL FOR WORK, <br />THE CONTRACTOR SHALL BE DEEMED TO HAVE MADE SUCH A STUDY AND EXAMINATION AND TO <br />ACCEPT ALL CONDITIONS PRESENT AT SITE. NO REQUEST FOR ADDITIONAL PAYMENT SHALL BE <br />CONSIDERED VALID, DUE TO CONTRACTOR FAILURE TO ALLOW IN COST ESTIMATE FOR CONDITIONS <br />WHICH MAY EXIST. <br />2.CONTRACTOR SHALL REVIEW THE MECHANICAL AND OTHER CONSULTANTS DRAWINGS PRIOR TO <br />STARTING ANY WORK AND INFORM ENGINEER AND ARCHITECT OF ANY DISCREPANCIES, OMISSIONS, <br />OR IF CLARIFICATIONS ARE REQUIRED IN ORDER TO COMPLETE THE INSTALLATION PRIOR TO <br />COMMENCING THE WORK. OWNER OR ITS REPRESENTATIVE SHALL SCHEDULE A MEETING WITH THE <br />CONTRACTOR, ENGINEER, ARCHITECT AND OTHER CONSULTANTS DURING BIDDING PROCESS TO <br />REVIEW AND DISCLOSE ANY DISCREPANCIES, OMISSIONS AND/OR CLARIFICATIONS RELATED TO THE <br />CONSTRUCTION DOCUMENTS AND/OR SPECIFICATIONS NOTED BY CONTRACTOR AND/OR OWNER. <br />3.CONTRACTOR BID SHALL NOT BE LIMITED TO THE WORK SHOWN ON THE PLANS AND <br />SPECIFICATIONS. ALL PREMIUM OVERTIME COSTS, UTILITY CHARGES, COST FOR TEMPORARY UTILITY <br />SERVICES, ALL ALTERATIONS, ALL DEMOLITION AND EXTENSION WORKS, PERMITS, INSPECTION FEES, <br />MISCELLANEOUS CONTINGENCY COST, ETC., SHALL BE INCLUDED IN BID. <br />4.ANY WORK TO BE PERFORMED MUST BE PLANNED IN ADVANCE. SCHEDULING SHALL BE DONE IN <br />COOPERATION WITH CONSTRUCTION MANAGER. INCLUDE ALL PREMIUM TIME CHARGES IN BID TO <br />COVER AFTER-HOURS AND WEEKEND WORK. <br />5.THE CONTRACTOR SHALL COORDINATE HIS WORK HARMONIOUSLY WITH ALL TRADES. COORDINATE <br />THE LOCATIONS OF ALL CEILING DIFFUSERS, REGISTERS AND GRILLES WITH THE ARCHITECTURAL <br />CEILING PLAN, ELECTRICAL LIGHTING LAYOUT AND ARCHITECTURAL ROOM ELEVATIONS. ALL WORK <br />SHALL BE IN ACCORDANCE WITH BEST CONSTRUCTION PRACTICES. <br />6.THE CONTRACTOR SHALL FURNISH ALL MATERIAL, TOOLS, LABOR, ETC. TO INSTALL A COMPLETE AND <br />FUNCTIONING SYSTEM AS INDICATED ON DRAWINGS. <br />7.THE CONTRACTOR SHALL REPORT TO THE CONSTRUCTION MANAGER IMMEDIATELY ANY <br />INTERFERENCE BETWEEN TRADES OR WITH BUILDING OBSTRUCTIONS. <br />8.CONTRACTOR SHALL PROVIDE SHOP DRAWINGS FOR ALL EQUIPMENT, DUCTWORK, PIPING, <br />DAMPERS, ETC. AND SUBMIT IT TO THE CONSTRUCTION MANAGER FOR APPROVAL. <br />9.COVER ALL WALLS, FLOOR, CEILING, AND ROOF OPENINGS LEFT AS THE RESULT OF THE WORK. <br />PROVISIONS SHALL BE MADE TO PROTECT PEOPLE FROM INJURY AND TO PROTECT EQUIPMENT <br />FROM WEATHER. <br />10.THE CONTRACTOR SHALL VERIFY THE INPUT VOLTAGE AND AMPERAGE (HORSEPOWER) RATING OF <br />ALL EQUIPMENT AND CONFIRM WITH ELECTRICAL CONTRACTOR PRIOR TO INSTALLATION. <br />11.CONTRACTOR SHALL PROVIDE ALL SAFETY MATERIALS AND EQUIPMENT NOT LIMITED TO BARRIERS, <br />SIGNS, LIGHTS, ETC. <br />12.CONTRACTOR SHALL PROVIDE BARRICADE, SAFETY SIGNS AND OTHER DEVICES TO ISOLATE WORK <br />AREA DURING CONSTRUCTION, UPON CONSTRUCTION MANAGER APPROVAL. <br />13.CONTRACTOR SHALL REPAIR/PATCH AND WEATHER PROOF ANY OPENING CAUSED BY <br />EQUIPMENT/PIPING INSTALLATION, AND SHALL PAINT WHERE NECESSARY. <br />14.THE CONTRACTOR SHALL PREPARE ONE (1) SET OF "RECORD DRAWINGS" PLANS AND KEEP AT JOB <br />SITE FOR REVIEW BY THE CONSTRUCTION MANAGER. ANY CHANGES FROM THE DESIGN DRAWINGS <br />SHALL BE NOTED WITH RED INK. UPON COMPLETION OF PROJECT THE CONTRACTOR SHALL SUBMIT <br />THE PLANS TO THE CONSTRUCTION MANAGER. <br />15.THE CONTRACTOR SHALL THOROUGHLY CLEAN THE UNITS, REMOVE ALL PACKING LABELS, STICKERS <br />AND ANY CRATING DEBRIS, AND LEAVE ALL INSTALLATION FINISHED AND READY FOR OPERATION. <br />16.AFTER COMPLETION, THE COMPLETE SYSTEM SHALL BE TESTED AND BALANCED. ANY ADDITIONAL <br />BALANCING DEVICES REQUIRED FOR PROPER BALANCING SHALL BE INSTALLED. PRIOR TO <br />BALANCING, ALL FILTERS SHALL BE REPLACED WITH NEW CLEAN FILTERS. <br />17.UPON COMPLETION OF PROJECT AND PRIOR TO ACCEPTANCE OF THE WORK BY THE CONSTRUCTION <br />MANAGER, CONTRACTOR SHALL FURNISH TO HIM FOUR (4) COPIES OF OPERATION AND <br />MAINTENANCE MANUAL OF EQUIPMENT BOUND IN BOOK FORM AND INDEXED. MANUAL SHALL <br />CONTAIN PARTS LIST, RECOMMENDED PERIODS OF INSPECTION, ETC., AND NAME, ADDRESS AND <br />PHONE NUMBER OF ALL SUPPLIERS. <br />18.THE CONTRACTOR SHALL FURNISH A TRAINED AND COMPETENT SERVICE ENGINEER TO INSTRUCT <br />THE OPERATORS IN THE OPERATION AND MAINTENANCE OF THE SYSTEM. <br />19.COMPLETE INSTALLATION SHALL BE GUARANTEED, AND CONTRACTOR SHALL PROVIDE A MINIMUM 1 <br />YEAR SERVICE, INCLUDING PARTS AND LABOR. <br />B. CONTRACTOR NOTES <br />1.SEAL ALL PENETRATIONS THROUGH WALLS, CEILINGS, FLOOR, ETC. TO MAINTAIN THE FIRE RATING, <br />AND BUILDING PRESSURIZATION. <br />2.EACH SINGLE SYSTEM HEATING OR COOLING AIR IN EXCESS OF 2,000 CUBIC FEET PER MINUTE <br />SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF ACTIVATED BY SMOKE DETECTORS PER 2022 <br />CMC SECTION 608. <br />3.PROVIDE LISTED DUCT TYPE SMOKE DETECTOR IN THE SUPPLY AIR DUCT IN EVERY AIR MOVING <br />SYSTEM SUPPLYING AIR IN EXCESS 2000 CFM (MULTIPLE UNITS SERVING THE SAME ROOM, OR <br />HAVING A COMMON RETURN AIR PLENUM OR COMMON OCA DUCT ARE CONSIDERED TO BE ONE <br />SYSTEM FOR DETERMINATION OF THE CFM). <br />4.COMBINATION FIRE / SMOKE DAMPERS (FSD) SHALL CLOSE AUTOMATICALLY UPON DETECTION OF <br />HEAT AND/OR SMOKE TO RESIST THE PASSAGE OF FLAME AND SMOKE. THE DAMPER SHALL BE <br />CONTROLLED BY HEAT/FIRE AND SMOKE DETECTION SYSTEM IN CONFORMANCE WITH LOCAL <br />CODE. <br />·HEAT/FIRE DETECTION SYSTEM SHALL BE FACTORY PROVIDED WITH DAMPER. <br />·SMOKE DETECTION SYSTEM SHALL BE A DUCT SMOKE DETECTOR INSTALLED PER LOCAL CODE. <br />DUCT SMOKE DETECTOR SHALL BE FACTORY PROVIDED WITH DAMPER OR BY THIRD PARTY. <br />F. FIRE PROTECTION <br />1.ROUTING AND TERMINATION OF FLUE AND COMBUSTION AIR INTAKE FOR EACH HEATING UNIT SHALL <br />COMPLY WITH CH 8. AND CH 7 OF CMC 2022 AND WITH MANUFACTURER'S SPECIFICATIONS. PROVIDE <br />MANUFACTURER'S SPECIFICATIONS AND INSTALLATIONS INSTRUCTIONS TO VERIFY COMPLIANCE. <br />2.DRYER VENTS SHALL BE EQUIPPED WITH BACK-DRAFT DAMPERS PER 2022 CMC SECTION 504.4 <br />3.SCREENS/LOUVERS SHALL NOT BE INSTALLED ON A DRYER VENT TERMINATION PER 2022 CMC (504.4.) <br />4.FLEXIBLE CLOTHES DRYER TRANSITION DUCTS SHALL NOT BE CONCEALED WITH CONSTRUCTION. <br />5.CLOTHES DRYER EXHAUST TERMINATION AT THE EXTERIOR OF A BUILDING SHALL MAINTAIN A <br />MINIMUM FIVE (5) FEET SEPARATION FROM THE CONDENSING UNIT. <br />6.EXHAUST DUCT FOR TYPE 1 DRYERS SHALL COMPLY WITH 2022 CMC SECTION 504.4.2. <br />7.FURNACES, BOILERS, AND WATER HEATERS LOCATED WITHIN THE HOME’S PRESSURE BOUNDARY <br />ARE MECHANICALLY DRAFTED OR DIRECT-VENTED. AS AN EXCEPTION, NATURALLY DRAFTED <br />EQUIPMENT IS ALLOWED IN CLIMATE ZONES 1-3. FOR NATURALLY DRAFTED FURNACES, BOILERS, <br />AND WATER HEATERS, THE RATER HAS FOLLOWED RESNET OR BPI COMBUSTION SAFETY TEST <br />PROCEDURES AND MET THE SELECTED STANDARD’S LIMITS FOR DEPRESSURIZATION, SPILLAGE, <br />DRAFT PRESSURE, AND CO-CONCENTRATION IN AMBIENT AIR, AS WELL AS A CO-CONCENTRATION IN <br />THE FLUE OF ≤ 25 PPM. <br />8.OPENINGS USED TO CONNECT INDOOR SPACES WHERE INDOOR COMBUSTION AIR IS USED SHALL BE <br />SIZED AND LOCATED IN ACCORDANCE WITH THE FOLLOWING PER 2022 CMC 701.5: <br />·EACH OPENING SHALL HAVE A FREE AREA OF NOT LESS THAN ONE (1) SQUARE INCH PER 1000 <br />BTU/HR OF THE TOTAL INPUT RATING OF THE APPLIANCE IN THE SPACE, BUT NOT LESS THAN 100 <br />SQUARE INCHES OF THE TOP OF THE ENCLOSURE AND ONE OPENING SHALL COMMENCE WITHIN <br />TWELVE (12) INCHES OF THE BOTTOM OF THE ENCLOSURE. THE DIMENSION OF AIR OPENINGS SHALL <br />BE NOT LESS THAN THREE (3) INCHES. <br />·THE VOLUMES OF SPACES IN DIFFERENT STORIES SHALL BE CONSIDERED AS COMMUNICATING <br />SPACES WHERE SUCH SPACES ARE CONNECTED BY ONE OR MORE OPENINGS IN DOORS OR FLOORS <br />HAVING A TOTAL FREE AREA OF NOT LESS THAN TWO (2) SQUARE INCHES PER 1000 BTU/HR OF TOTAL <br />INPUT RATING OF APPLIANCES. <br />C. COMBUSTION AIR <br />1.ALL DUCTWORK SHALL BE CONSTRUCTED, ERECTED, AND SEALED IN ACCORDANCE WITH THE <br />MOST RESTRICTIVE OF LOCAL REGULATIONS AND PROCEDURES DETAILED IN ASHRAE HANDBOOK <br />OF FUNDAMENTALS OR THE APPLICABLE STANDARDS ADOPTED BY THE SHEET METAL AND AIR <br />CONDITIONING CONTRACTORS NATIONAL ASSOCIATION AND THE UNIFORM MECHANICAL CODE. <br />2.ALL DUCT SIZES ARE CLEAR INSIDE SIZES. OBTAIN APPROVAL FROM CONSTRUCTION MANAGER <br />FOR SIZING OF ANY DUCTWORK, WHERE SIZES ARE NOT SHOWN ON DRAWINGS. <br />3.MANUAL VOLUME DAMPERS SHALL BE PROVIDED IN ALL DUCT BRANCHES TO INDIVIDUAL BOXES, <br />DIFFUSERS, GRILLES AND REGISTERS AND SHALL BE LOCKED IN THE FINAL POSITION AFTER <br />COMPLETION OF AIR BALANCE. <br />4.TRANSVERSE AND LONGITUDINAL JOINTS FOR ALL SUPPLY AIR DUCTS SHALL BE SEALED WITH <br />APPROVED MASTIC PER SMACNA. <br />5.APPROVED MATERIALS SHALL BE INSTALLED WITHIN DUCTS AND PLENUMS FOR INSULATING, <br />SOUND DEADENING OR OTHER PURPOSES. MATERIALS SHALL HAVE A MOLD HUMIDITY AND <br />RESISTANT SURFACE THAT MEETS THE REQUIREMENTS OF UL181. <br />6.ANY METALLIC DUCT WORK USED SHALL BE INSTALLED IN ACCORDANCE WITH 2022 CMC SECTION <br />603.3. <br />7.ANY FLEXIBLE AIR DUCTS MUST COMPLY WITH UL 181 AND BE INSTALLED PER THE <br />MANUFACTURER’S INSTRUCTIONS AND SMACNA HVAC DUCT STANDARDS, IN ACCORDANCE WITH <br />SECTION 604 OF THE 2022 CMC. <br />8.ALL HANGARS AND SUPPORTS SHALL BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE <br />FEDERAL, STATE, AND LOCAL CODES. ALL CONNECTIONS TO JOISTS SHALL BE MADE AT THE TOP <br />CORD. <br />9.IN NON RESIDENTIAL OCCUPANCIES PORTIONS OF SUPPLY AND RETURN AlR DUCTS AND PLENUMS <br />LOCATED IN UNCONDITIONED SPACES SHALL BE INSULATED TO A MINIMUM LEVEL OF R8. <br />D. DUCTWORK <br />1.ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE EQUIPMENT <br />MANUFACTURER'S RECOMMENDATIONS. <br />2.ALL HVAC EQUIPMENT SHALL BE U.L. LISTED AND BEAR A U.L. LABEL. <br />3.CONDENSER PAD SHALL BE A MINIMUM OF THREE (3) INCHES HIGH AND SHALL BE PROVIDED AND <br />INSTALLED BY THE MECHANICAL CONTRACTOR UNLESS OTHERWISE SPECIFIED. THE CONDENSER <br />SHALL BE SECURELY FASTENED TO THE PAD TO PREVENT EXCESSIVE MOTION DURING NORMAL <br />OPERATING CONDITIONS AND SEISMIC ACTIVITY. <br />4.LISTED DIRECT-VENT APPLIANCES SHALL BE INSTALLED IN ACCORDANCE WITH THE <br />MANUFACTURER'S INSTALLATION INSTRUCTIONS. CMC SECTION 802.2.6. <br />5.ALL CHIMNEYS SHALL BE INSTALLED IN ACCORDANCE WITH 2022 CMC SECTION 802.5.1 THROUGH <br />802.5.3. <br />6.A CHIMNEY FOR RESIDENTIAL-TYPE OR LOW-HEAT APPLIANCE SHALL EXTEND NOT LESS THAN <br />THREE (3) FEET ABOVE THE HIGHEST POINT WHERE IT PASSES THROUGH A ROOF OF A BUILDING <br />AND NOT LESS THAN TWO (2) FEET HIGHER THAN A PORTION OF A BUILDING WITHIN A HORIZONTAL <br />DISTANCE OF TEN (10) FEET. 2022 CMC SECTION 802.5.4. <br />7.THE FUEL INPUT RATE TO THE APPLIANCE SHALL NOT BE INCREASED OR DECREASED IN VIOLATION <br />OF THE APPROVED RATING AT THE ALTITUDE WHERE IT IS BEING USED. CMC 2022 SECTION 902.6. <br />8.ALL ELECTRICAL AIR CONDITIONER SYSTEMS DESIGNED FOR PERMANENT INSTALLATION SHALL <br />COMPLY WITH UL 1995 OR UL 60335-2-40. 2022 CMC SECTION 903.1. <br />9.ALL GAS FIRED AIR CONDITIONERS SHALL COMPLY WITH SECTION 903.2.1 THROUGH SECTION <br />903.2.7. 2022 CMC SECTION 903.2. <br />10.LISTED OUTDOOR COOKING APPLIANCES SHALL BE INSTALLED IN ACCORDANCE WITH THEIR <br />LISTING AND THE MANUFACTURER'S INSTALLATION INSTRUCTIONS, 2022 CMC SECTION 923.1. <br />UNLISTED OUTDOOR COOKING APPLIANCES SHALL BE INSTALLED OUTDOORS WITH CLEARANCES <br />TO COMBUSTIBLE MATERIAL OF NOT LESS THAN THIRTY-SIX(36) INCHES AT THE SIDES AND BACK <br />AND NOT LESS THAN FOURTY-EIGHT (48) INCHES AT THE FRONT. IN NO CASE SHALL THE APPLIANCE <br />BE LOCATED UNDER OVERHEAD COMBUSTIBLE CONSTRUCTION. 2022 CMC 923.2 <br />11.HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) EQUIPMENT, WATER HEATERS, SHOWER <br />HEADS FAUCETS, AND ALL OTHER REGULATED APPLIANCES MUST BE CERTIFIED BY THE <br />MANUFACTURER TO THE CALIFORNIA ENERGY COMMISSION 2022 CEC 110.0 & 110.3. <br />E. EQUIPMENT/APPLIANCES <br />CALGREEN NOTES <br />APPLICABLE CODES <br />APPLICABLE CODES AS OF JANUARY 1, 2023: <br />2022 CALIFORNIA BUILDING STANDARDS ADMINISTRATIVE CODE, PART 1, TITLE 24 C.C.R. ; <br />2022 CALIFORNIA BUILDING CODE (CBC), PART 2, TITLE 24 C.C.R. ; <br />(2021 INTERNATIONAL BUILDING CODE & 2022 CALIFORNIA AMENDMENTS) <br />2022 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, TITLE 24 C.C.R. ; <br />(2020 NATIONAL ELECTRICAL CODE & 2022 CALIFORNIA AMENDMENTS) <br />2022 CALIFORNIA MECHANICAL CODE (CMC), PART 4, TITLE 24 C.C.R. ; <br />(2021 UNIFORM MECHANICAL CODE & 2022 CALIFORNIA AMENDMENTS) <br />2022 CALIFORNIA PLUMBING CODE (CPC), PART 5, TITLE 24 C.C.R. ; <br />(2021 UNIFORM PLUMBING CODE & 2022 CALIFORNIA AMENDMENTS) <br />2022 CALIFORNIA ENERGY CODE (CEC), PART 6, TITLE 24 C.C.R. ; <br />2022 CALIFORNIA FIRE CODE (CFC), PART 9, TITLE 24 C.C.R. ; <br />(2021 INTERNATIONAL FIRE CODE & 2022 CALIFORNIA AMENDMENTS) <br />2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGreen), PART 11, TITLE 24 C.C.R. ; <br />2022 CALIFORNIA REFERENCED STANDARDS, PART 12, TITLE 24 C.C.R. ; <br />TITLE 19 C.C.R., PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS <br />ABBREVIATIONS <br />AD <br />DESCRIPTIONABBREVIATION <br />1.OPENINGS IN THE BUILDING ENVELOPE SEPARATING CONDITIONED SPACE FROM <br />UNCONDITIONED SPACE NEEDED TO ACCOMODATE GAS, PLUMBING, <br />ELECTRICAL LINES AND OTHER NECESSARY PENETRATIONS MUST BE SEALED IN <br />COMPLIANCE WITH CALIFORNIA ENERGY CODE. CAL GREEN 4.406.1 <br />2.AT THE TIME OF FINAL INSPECTION, A MANUAL, COMPACT DISC, WEB-BASED <br />REFERENCE OR OTHER MEDIA ACCEPTABLE TO THE ENFORCING AGENCY <br />INCLUDING ITEMS 1 THROUGH 10 IN ACCORDANCE WITH THIS SECTION SHALL BE <br />PLACED IN THE BUILDING. CAL GREEN 4.410.1 <br />2.1.DIRECTIONS TO THE OWNER OR OCCUPANT THAT THE MANUAL SHALL REMAIN <br />WITHIN BUILDING THROUGHOUT THE LIFE CYCLE OF THE STRUCTURE. <br />2.2.OPERATION AND MAINTENANCE INSTRUCTIONS FOR THE FOLLOWING: <br />2.2.1.EQUIPMENT AND APPLIANCES, INCLUDING WATER-SAVING DEVICES AND <br />SYSTEMS, HVAC SYSTEMS, PHOTOVOLTAIC SYSTEMS, ELECTRIC VEHICLE <br />CHARGERS, WATER-HEATING SYSTEMS AND OTHER MAJOR APPLIANCES AND <br />EQUIPMENT. <br />2.2.2.ROOF AND YARD DRAINAGE, INCLUDING GUTTERS AND DOWNSPOUTS. <br />2.2.3.SPACE CONDITIONING SYSTEMS, INCLUDING CONDENSERS AND AIR FILTERS. <br />2.2.4.LANDSCAPE IRRIGATION SYSTEMS. <br />2.2.5.WATER REUSE SYSTEMS. <br />2.3.INFORMATION FROM LOCAL UTILITY, WATER AND WASTE RECOVERY PROVIDERS <br />ON METHODS TO FURTHER REDUCE CONSUMPTION, INCLUDING RECYCLE <br />PROGRAMS AND LOCATIONS. <br />2.4.PUBLIC TRANSPORTATION AND/OR CARPOOL OPTIONS AVAILABLE IN THE AREA. <br />2.5.EDUCATIONAL MATERIAL ON THE POSITIVE IMPACTS OF AN INTERIOR RELATIVE <br />HUMIDITY BETWEEN 30-60 PERCENT AND WHAT METHODS AN OCCUPANT MAY <br />USE TO MAINTAIN THE RELATIVE HUMIDITY LEVEL IN THAT RANGE. <br />2.6.INFORMATION ABOUT WATER-CONSERVING LANDSCAPE AND IRRIGATION <br />DESIGN AND CONTROLLER WHICH CONSERVE WATER. <br />2.7.INSTRUCTIONS FOR MAINTAINING GUTTERS AND DOWNSPOUTS AND THE <br />IMPORTANCE OF DIVERTING WATER AT LEAST 5 FEET AWAY FROM THE <br />FOUNDATION. <br />2.8.INFORMATION ON REQUIRED ROUTINE MAINTENANCE MEASURES, INCLUDING, <br />BUT NOT LIMITED TO, CAULKING, PAINTING, GRADING AROUND THE BUILDING, <br />ETC. <br />2.9.INFORMATION ABOUT STATE SOLAR ENERGY AND INCENTIVE PROGRAMS <br />AVAILABLE. <br />2.10.A COPY OF ALL SPECIAL INSPECTION VERIFICATIONS REQUIRED BY THE <br />ENFORCING AGENCY OR THIS CODE. <br />3.AT THE TIME OF ROUGH INSTALLATION OR DURING STORAGE ON THE <br />CONSTRUCTION SITE AND UNTIL FINAL STARTUP OF THE HEATING AND COOLING <br />EQUIPMENT, ALL DUCT AND OTHER RELATED AIR DISTRIBUTION COMPONENT <br />OPENINGS SHALL BE COVERED WITH TAPE, PLASTIC, SHEET METAL OR OTHER <br />METHODS ACCEPTABLE TO THE ENFORCING AGENCY TO REDUCE THE AMOUNT <br />OF DUST OR DEBRIS WHICH MAY COLLECT IN THE SYSTEM. CAL GREEN 4.504.1 <br />4.HEATING AND AIR-CONDITIONING SYSTEMS HAS BEEN SIZED, DESIGNED AND <br />HAVE THEIR EQUIPMENT SELECTED USING THE FOLLOWING METHODS: <br />4.1.THE HEAT LOSS AND HEAT GAIN IS ESTABLISHED ACCORDING TO ACCA MANUAL <br />J, ASHRAE HANDBOOKS OR OTHER EQUIVALENT DESIGN SOFTWARE OR <br />METHODS. <br />4.2.DUCT SYSTEMS ARE SIZED ACCORDING TO ACCA 29-D MANUAL D, ASHRAE <br />HANDBOOKS OR OTHER EQUIVALENT DESIGN SOFTWARE OR METHODS. <br />4.3.SELECT HEATING AND COOLING EQUIPMENT ACCORDING TO ACCA 36-S MANUAL <br />S OR OTHER EQUIVALENT DESIGN SOFTWARE OR METHODS. <br />EXCEPTION: USE OF ALTERNATE DESIGN TEMPERATURES NECESSARY TO ENSURE <br />THE SYSTEMS FUNCTION ARE ACCEPTABLE. CAL GREEN 4.507.2 <br />5.INSTALLATIONS OF HVAC, REFRIGERATION AND FIRE SUPPRESSION EQUIPMENT <br />SHALL NOT CONTAIN ANY CFCs OR HALONS. CAL GREEN 5.508.1 <br />6.DEVELOP A WRITTEN PLAN OF PROCEDURES FOR TESTING AND ADJUSTING <br />SYSTEMS. SYSTEMS TO BE INCLUDED FOR TESTING AND ADJUSTING SHALL <br />INCLUDE, AS APPLICABLE TO THE PROJECT, THE SYSTEMS LISTED IN SECTION <br />5.410.4.2. <br />7.ADHESIVES, SEALANTS, AND CAULKS USED ON THE PROJECT SHALL MEET THE <br />REQUIREMENTS OF SECTIONS 5.504.4.1 THROUGH 5.504.4.6. <br />8.BATHROOM EXHAUST FANS SHALL BE ENERGY STAR COMPLIANT AND DUCTED <br />TO TERMINATE OUTSIDE THE BUILDING. <br />9.UNLESS FUNCTIONING AS A COMPONENT OF A WHOLE HOUSE VENTILATION <br />SYSTEM, BATHROOM EXHAUST FANS MUST BE CONTROLLED BY A HUMIDITY <br />CONTROL, WHICH SHALL BE CAPABLE OF ADJUSTMENT BETWEEN A RELATIVE <br />HUMIDITY RANGE OF 50 TO 80% (SEC 4.506.1) <br />LEGEND <br />RECTANGULAR DIFFUSER <br />KEY NOTE <br />RECTANGULAR OR FLAT OVAL <br />DUCTWORK SIZE (FIRST <br />NUMBER IS SIDE SHOWN) <br />FLEXIBLE DUCTWORK <br />DUCT SECTION <br />AIR DEVICE MARK <br />SIDE-WALL MOUNTED <br />SUPPLY GRILLE OR <br />RETURN/EXHAUST GRILLE <br />AIR FLOW <br />MOTORIZED DAMPER <br />MANUAL VOLUME DAMPER <br />OPPOSED BLADE DAMPER <br />BACKDRAFT DAMPER <br />OFF-SET UP OR DOWN <br />INTERNALLY LINED <br />DUCTWORK <br />BOTTOM OUTLET/INLET <br />REGISTER (PATTERN AS <br />SHOWN ON PLANS) <br />DUCT MOUNTED SIDE <br />OUTLET/INLET REGISTER <br />FLEXIBLE CONNECTION <br />TYPE <br />EQUIPMENT TAG <br />HVAC FURNACE <br />HVAC A/C UNIT <br />OR HEAT PUMP <br />CEILING MOUNTED EXHAUST <br />FAN <br />STORAGE TANK <br />HVAC ACCESS PANEL <br />THERMOSTAT <br />THERMOSTAT SUSPENDED <br />TEMPERATURE <br />SENSOR/TRANSMITTER <br />HUMIDITY SENSOR/ <br />TRANSMITTER <br />PRESSURE DIFFERENTIAL <br />SENSOR <br />SMOKE DETECTOR <br />POINT OF CONNECTION <br />(P.O.C) <br />DROPPED CEILING <br />CONTROLLERRECTANGULAR TO ROUND <br />TRANSITION <br />CO SENSORELBOWS WITH TURNING <br />VANES <br />ACCESS DOOR <br />HC - HEATING COIL <br />CC - COOLING COIL <br />PHC - PRE-HEAT COIL <br />RHC - RE-HEAT COIL <br />FIRE DAMPER <br />FIRE SMOKE DAMPER <br />FILTER <br />LOUVER <br />DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL <br />1.ALL HANGARS AND SUPPORTS SHALL BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE <br />FEDERAL, STATE AND LOCAL CODES. ALL CONNECTIONS TO JOISTS SHALL BE MADE AT THE TOP <br />CORD. <br />2.PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL ALL CONDENSATE DRAIN LINES WITH <br />CONNECTIONS TO AN APPROVED RECEPTOR IN ACCORDANCE WITH THE CALIFORNIA PLUMBING <br />CODE. REFER TO PLUMBING PLANS FOR ALL PRIMARY AND SECONDARY CONDENSATE ROUTING. <br />3.CONTRACTOR SHALL VERIFY IN FIELD THE SHORTEST ROUTING FOR REFRIGERANT LINES THAT <br />COMPLY WITH MANUFACTURER'S INSTALLATION GUIDELINES AND DO NOT INTERFERE OR RESTRICT <br />OTHER TRADES. <br />4.THE LIQUID AND SUCTION LINES SHALL BE PROTECTED FROM THE ENVIRONMENT USING A WATER <br />RESISTANT METAL JACKET, PAINTED CANVAS, PLASTIC COVER OR COATING PER 2022 CEC. <br />G. PIPING <br />ACCESS DOOR <br />BDD BACKDRAFT DAMPER <br />CFM CUBIC FEET PER MINUTE <br />dBA A-WEIGHTED DECIBEL <br />EA EXHAUST AIR <br />EF EXHAUST FAN <br />FC FAN COIL <br />FD FIRE DAMPER <br />HP HEAT PUMP <br />HSPF HEATING SEASONAL <br />PERFORMANCE FACTOR <br />LAU LAUNDRY ROOM <br />MVD MANUAL VOLUME DAMPER <br />NG NATURAL GAS <br />OSA OUTSIDE AIR <br />PDR POWDER ROOM <br />RA RETURN AIR <br />RL REFRIGERANT LIQUID <br />RS REFRIGERANT SUCTION <br />RVD REMOTE OPERATED <br />DAMPER <br />SA SUPPLY AIR <br />SQFT SQUARE FEET <br />SD SMOKE DETECTOR <br />SA RA EA <br />SA RA/EA <br />SA RA/EA <br />SA RA/EA <br />SA RA EA <br />DESCRIPTIONABBREVIATION <br />MECHANICAL SHEET INDEX <br />NO.SHEET DESCRIPTION <br />1 M-0.1 GENERAL NOTES & LEGENDS <br />2 M-0.2 EQUIPMENT SCHEDULES <br />3 M-1.1 SITE PLAN <br />4 M-2.1 BUILDING A1 - LEVEL 1 FLOOR PLAN <br />5 M-2.2 BUILDING A2 - LEVEL 1 FLOOR PLAN <br />6 M-2.3 BUILDING A1, A2 - LEVEL 2 FLOOR PLAN <br />7 M-2.4 BUILDING A1, A2 - ROOF PLAN <br />8 M-3.1 UNIT FLOOR PLANS <br />9 MD-1 DETAILS <br />al <br />l <br /> <br />i <br />d <br />e <br />a <br />s <br />, <br /> <br />d <br />e <br />s <br />i <br />g <br />n <br />s <br /> <br />a <br />n <br />d <br /> <br />p <br />l <br />a <br />n <br />s <br /> <br />r <br />e <br />p <br />r <br />e <br />s <br />e <br />n <br />t <br />e <br />d <br /> <br />b <br />y <br /> <br />t <br />h <br />i <br />s <br /> <br />d <br />r <br />a <br />w <br />i <br />n <br />g <br /> <br />a <br />r <br />e <br /> <br />t <br />h <br />e <br /> <br />e <br />x <br />c <br />l <br />u <br />s <br />i <br />v <br />e <br /> <br />p <br />r <br />o <br />p <br />e <br />r <br />t <br />y <br /> <br />o <br />f <br />Go <br />u <br />v <br />i <br />s <br /> <br />E <br />n <br />g <br />i <br />n <br />e <br />e <br />r <br />i <br />n <br />g <br /> <br />a <br />n <br />d <br /> <br />s <br />h <br />a <br />l <br />l <br /> <br />n <br />o <br />t <br /> <br />b <br />e <br /> <br />r <br />e <br />p <br />r <br />o <br />d <br />u <br />c <br />e <br />d <br /> <br />i <br />n <br /> <br />w <br />h <br />o <br />l <br />e <br /> <br />o <br />r <br /> <br />i <br />n <br /> <br />p <br />a <br />r <br />t <br /> <br />w <br />i <br />t <br />h <br />o <br />u <br />t <br /> <br />t <br />h <br />e <br /> <br />e <br />x <br />p <br />r <br />e <br />s <br />s <br /> <br />p <br />r <br />i <br />o <br />r <br /> <br />w <br />r <br />i <br />t <br />t <br />e <br />n <br /> <br />p <br />e <br />r <br />m <br />i <br />s <br />s <br />i <br />o <br />n <br /> <br />o <br />f <br /> <br />s <br />a <br />i <br />d <br /> <br />e <br />n <br />g <br />i <br />n <br />e <br />e <br />r <br />s <br />, <br /> <br />a <br />n <br />y <br /> <br />u <br />n <br />a <br />u <br />t <br />h <br />o <br />r <br />i <br />z <br />e <br />d <br /> <br />r <br />e <br />u <br />s <br />e <br /> <br />o <br />f <br /> <br />t <br />h <br />e <br />s <br />e <br /> <br />p <br />l <br />a <br />n <br />s <br /> <br />o <br />t <br />h <br />e <br />r <br /> <br />t <br />h <br />a <br />n <br /> <br />f <br />o <br />r <br /> <br />t <br />h <br />e <br /> <br />p <br />r <br />o <br />j <br />e <br />c <br />t <br /> <br />a <br />n <br />d <br /> <br />l <br />o <br />c <br />a <br />t <br />i <br />o <br />n <br /> <br />s <br />h <br />o <br />w <br />n <br /> <br />i <br />s <br /> <br />p <br />r <br />o <br />h <br />i <br />b <br />i <br />t <br />e <br />d <br />. <br />JOB NO. <br />SUBMITTAL <br />SHEET TITLE <br />SHEET NO. <br />CLIENT: <br />DATE <br />21 <br />3 <br />0 <br /> <br />E <br /> <br />4 <br />T <br />H <br /> <br />S <br />T <br /> <br /># <br />2 <br />0 <br />0 <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />BSB: MR230056; Gouvis: 66467 <br />WATER REVISIONS <br />09/12/2025 <br />1ST PLAN CHECK SUBMITTAL 08/20/2024 <br />2ND PLAN CHECK SUBMITTAL 1/29/2025 <br />3RD PLAN CHECK SUBMITTAL 04/17/2025 <br />4TH PLAN CHECK SUBMITTAL 07/10/2025 <br />WATER REVISIONS 09/12/2025 <br />OL <br />I <br />V <br />E <br /> <br />C <br />R <br />E <br />S <br />T <br /> <br />R <br />E <br />S <br />I <br />D <br />E <br />N <br />T <br />I <br />A <br />L <br />21 <br />5 <br />0 <br /> <br />E <br />. <br /> <br />F <br />O <br />U <br />R <br />T <br />H <br /> <br />A <br />N <br />D <br /> <br />2 <br />1 <br />6 <br />0 <br /> <br />E <br />. <br /> <br />F <br />O <br />U <br />R <br />T <br />H <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />OL <br />I <br />V <br />E <br /> <br />C <br />R <br />E <br />S <br />T <br />DATE SIGNED: 7/8/25 <br />M-0.1 <br />GENERAL NOTES <br />& LEGENDS <br />PC COMMENTS RESPONSE #1 01/29/2025A <br />DATEREVISION <br />PC COMMENTS RESPONSE #2 04/17/2025B <br />PC COMMENTS RESPONSE #3 07/10/2025C <br />WATER REVISIONS 09/12/2025D <br />PC COMMENTS RESPONSE #4 10/10/2025E <br />CLIENT REVISIONS 10/10/20251