Laserfiche WebLink
PC COMMENTS RESPONSE #1 01/29/2025A <br />al <br />l <br /> <br />i <br />d <br />e <br />a <br />s <br />, <br /> <br />d <br />e <br />s <br />i <br />g <br />n <br />s <br /> <br />a <br />n <br />d <br /> <br />p <br />l <br />a <br />n <br />s <br /> <br />r <br />e <br />p <br />r <br />e <br />s <br />e <br />n <br />t <br />e <br />d <br /> <br />b <br />y <br /> <br />t <br />h <br />i <br />s <br /> <br />d <br />r <br />a <br />w <br />i <br />n <br />g <br /> <br />a <br />r <br />e <br /> <br />t <br />h <br />e <br /> <br />e <br />x <br />c <br />l <br />u <br />s <br />i <br />v <br />e <br /> <br />p <br />r <br />o <br />p <br />e <br />r <br />t <br />y <br /> <br />o <br />f <br />Go <br />u <br />v <br />i <br />s <br /> <br />E <br />n <br />g <br />i <br />n <br />e <br />e <br />r <br />i <br />n <br />g <br /> <br />a <br />n <br />d <br /> <br />s <br />h <br />a <br />l <br />l <br /> <br />n <br />o <br />t <br /> <br />b <br />e <br /> <br />r <br />e <br />p <br />r <br />o <br />d <br />u <br />c <br />e <br />d <br /> <br />i <br />n <br /> <br />w <br />h <br />o <br />l <br />e <br /> <br />o <br />r <br /> <br />i <br />n <br /> <br />p <br />a <br />r <br />t <br /> <br />w <br />i <br />t <br />h <br />o <br />u <br />t <br /> <br />t <br />h <br />e <br /> <br />e <br />x <br />p <br />r <br />e <br />s <br />s <br /> <br />p <br />r <br />i <br />o <br />r <br /> <br />w <br />r <br />i <br />t <br />t <br />e <br />n <br /> <br />p <br />e <br />r <br />m <br />i <br />s <br />s <br />i <br />o <br />n <br /> <br />o <br />f <br /> <br />s <br />a <br />i <br />d <br /> <br />e <br />n <br />g <br />i <br />n <br />e <br />e <br />r <br />s <br />, <br /> <br />a <br />n <br />y <br /> <br />u <br />n <br />a <br />u <br />t <br />h <br />o <br />r <br />i <br />z <br />e <br />d <br /> <br />r <br />e <br />u <br />s <br />e <br /> <br />o <br />f <br /> <br />t <br />h <br />e <br />s <br />e <br /> <br />p <br />l <br />a <br />n <br />s <br /> <br />o <br />t <br />h <br />e <br />r <br /> <br />t <br />h <br />a <br />n <br /> <br />f <br />o <br />r <br /> <br />t <br />h <br />e <br /> <br />p <br />r <br />o <br />j <br />e <br />c <br />t <br /> <br />a <br />n <br />d <br /> <br />l <br />o <br />c <br />a <br />t <br />i <br />o <br />n <br /> <br />s <br />h <br />o <br />w <br />n <br /> <br />i <br />s <br /> <br />p <br />r <br />o <br />h <br />i <br />b <br />i <br />t <br />e <br />d <br />. <br />JOB NO. <br />SUBMITTAL <br />DATE <br />SHEET TITLE <br />SHEET NO. <br />CLIENT: <br />REVISION <br />DATE <br />21 <br />3 <br />0 <br /> <br />E <br /> <br />4 <br />T <br />H <br /> <br />S <br />T <br /> <br /># <br />2 <br />0 <br />0 <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />BSB: MR230056; Gouvis: 66467 <br />WATER REVISIONS <br />09/12/2025 <br />1ST PLAN CHECK SUBMITTAL 08/20/2024 <br />2ND PLAN CHECK SUBMITTAL 1/29/2025 <br />PC COMMENTS RESPONSE #2 04/17/2025B <br />3RD PLAN CHECK SUBMITTAL 04/17/2025 <br />PC COMMENTS RESPONSE #3 07/10/2025C <br />4TH PLAN CHECK SUBMITTAL 07/10/2025 <br />WATER REVISIONS 09/12/2025D <br />WATER REVISIONS 09/12/2025 <br />PC COMMENTS RESPONSE #4 10/10/2025E <br />CLIENT REVISIONS 10/10/20251 <br />OL <br />I <br />V <br />E <br /> <br />C <br />R <br />E <br />S <br />T <br /> <br />R <br />E <br />S <br />I <br />D <br />E <br />N <br />T <br />I <br />A <br />L <br />21 <br />5 <br />0 <br /> <br />E <br />. <br /> <br />F <br />O <br />U <br />R <br />T <br />H <br /> <br />A <br />N <br />D <br /> <br />2 <br />1 <br />6 <br />0 <br /> <br />E <br />. <br /> <br />F <br />O <br />U <br />R <br />T <br />H <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />OL <br />I <br />V <br />E <br /> <br />C <br />R <br />E <br />S <br />T <br />DATE SIGNED: 7/8/25 <br />GENERAL <br />1.ALL WORK SHALL COMPLY WITH CALIFORNIA CODE OF REGULATIONS 2022 TITLE 24, 2020 N.E.C., & <br />2022 C.E.C. AND LOCAL CODES. ELECTRICAL WORK SHALL COMPLY WITH CBC 2022 AND ALL <br />EQUIPMENT AND SYSTEMS SHALL BE U.L. LISTED. <br />2.DRAWINGS ARE NECESSARILY DIAGRAMMATIC BY THEIR NATURE AND ARE NOT INTENDED TO SHOW <br />EVERY CONNECTION IN DETAIL OR EVERY PIPE OR CONDUIT IN ITS EXACT LOCATION. CAREFULLY <br />INVESTIGATE STRUCTURAL AND FINISH CONDITIONS AND COORDINATE THE SEPARATE TRADES IN <br />ORDER TO AVOID INTERFERENCE BETWEEN THE VARIOUS PHASES OF WORK. ORGANIZE AND <br />LAYOUT WORK SO THAT IT WILL BE CONCEALED IN WALLS, FURRED CHASES, AND CEILINGS, ETC., IN <br />FINISHED PORTIONS OF THE BUILDING, UNLESS SPECIFICALLY NOTED TO BE EXPOSED. INSTALL ALL <br />WORK PARALLEL OR PERPENDICULAR TO BUILDING LINES UNLESS OTHERWISE NOTED. <br />3.INSTALL THE ELECTRICAL SYSTEM USING CONSTRUCTION MEANS, METHODS, AND MATERIALS IN <br />ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS / INSTRUCTIONS, TRADE "BEST <br />PRACTICES" STANDARDS, AND APPLICABLE NATIONAL AND LOCAL CODES. <br />4.PROVIDE ALL LABOR, MATERIALS, TOOLS, PERMITS, FEES, TRANSPORTATION, ETC REQUIRED TO <br />PROVIDE A COMPLETE AND FULLY-FUNCTIONING ELECTRICAL SYSTEM TO THE OWNER'S <br />SATISFACTION. <br />5.ALL ELECTRICAL EQUIPMENT AND DEVICES SHALL BE NEW AND SUPPLIED WITH ALL THE NECESSARY <br />FITTINGS, ATTACHMENTS, AND ACCESSORIES FOR A COMPLETE INSTALLATION. <br />6.CONTRACTOR TO PROVIDE SUBMITTALS FOR ALL ELECTRICAL EQUIPMENT, ELECTRICAL MATERIALS <br />AND LIGHTING FIXTURES FOR APPROVAL PRIOR TO ORDERING. <br />7.SWITCHGEAR DIMENSIONS ARE BASED ON THE APPROXIMATE DIMENSIONS OF THE MANUFACTURER <br />SPECIFIED IN THE PLANS. IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY THE EQUIPMENT WILL <br />FIT IN THE ACTUAL SPACE PRIOR TO ORDERING THE EQUIPMENT. <br />8.CONTRACTOR SHALL REVIEW THE ELECTRICAL, AND OTHER CONSULTANTS DRAWINGS PRIOR TO <br />STARTING ANY WORK AND INFORM THE ENGINEER OF ANY DISCREPANCIES, OMISSIONS, OR IF <br />CLARIFICATIONS ARE REQUIRED TO COMPLETE THE INSTALLATION PRIOR TO COMMENCING THE <br />WORK. CONTRACTOR, ENGINEER, ARCHITECT AND OWNER SHALL SCHEDULE A POST <br />BID/PRECONSTRUCTION MEETING TO REVIEW AND DISCLOSE ALL DISCREPANCIES, OMISSIONS <br />AND/OR CLARIFICATION RELATED TO THE CONSTRUCTION DOCUMENTS AND/OR SPECIFICATIONS <br />NOTED BY CONTRACTOR AND OR/OWNER AS PART OF THE PRECONSTRUCTION COORDINATION <br />PROCESS. <br />9.REFER AND REVIEW TO THE; PLUMBING, MECHANICAL/HVAC, LOW VOLTAGE, COMMUNICATION, <br />ACCESS CONTROL, INTERIOR DESIGN, ARCHITECTURAL AND STRUCTURAL DRAWINGS PRIOR TO, AND <br />DURING, THE ELECTRICAL INSTALLATION TO ENSURE ALL ELECTRICAL EQUIPMENT AND ASSOCIATED <br />DISTRIBUTION PATHWAY ARE CLEAR OF AND COORDINATED WITH THE OTHER TRADES INSTALLATION <br />REQUIREMENTS. <br />10.ALL HORIZONTAL AND VERTICAL PIPING, CONDUITS, AND DUCTS IN/THROUGH ELEVATED OR ON <br />GRADE SLABS SHALL BE INSTALLED PER THE MANUFACTURERS INSTALLATION MANUAL AND MEET <br />THE CLEARANCES SHOWN ON DETAIL E-0.3 OR HAVE APPROVAL IN WRITING FROM THE STRUCTURAL <br />ENGINEER OF RECORD. AVOID ANY HORIZONTIAL/VERTIAL PIPING, CONDUITS AND DUCTS IN AREAS <br />OF CONGESTED REINFORCEMENT SUCH AS COLUMNS, COLUMN CAPS AND COLUMN STRIPS. <br />11.PROVIDE ALL REQUIRED CONTROL WIRES, RELAYS, DISCONNECTS, STARTERS, CONDUITS, TIME <br />SWITCHES, AND OUTLETS REQUIRED BY THE OTHER TRADES SYSTEMS AS INDICATED ON THEIR <br />DRAWINGS. ALL ELECTRICAL WORK AND MATERIALS INDICATED IN THE ABOVE CONSULTANT'S (NOTE <br />8) DRAWINGS SHALL BE SUPPLIED AND INSTALLED BY THE ELECTRICAL CONTRACTOR UNDER THIS <br />SCOPE OF WORK. <br />12.ALL EQUIPMENT SHALL BE LISTED BY A RECOGNIZED TESTING AGENCY AND SUPPORTED <br />ACCORDING TO APPLICABLE OSHA REQUIREMENTS. <br />13.CONTRACTOR TO WARRANTY ALL WORK COMPLETED FOR A PERIOD OF ONE YEAR AFTER THE <br />OWNER'S ACCEPTANCE DATE. ANY LABOR OR MATERIALS REQUIRED TO CORRECT FAULTY OR <br />DEFECTIVE WORK WITHIN THE WARRANTY PERIOD SHALL BE CORRECTED AT THE EXPENSE OF THE <br />CONTRACTOR. ANY WORKMANSHIP OR EQUIPMENT FOUND TO BE FAULTY OR DEFICIENT DURING <br />THAT PERIOD SHALL BE CORRECTED AT ONCE, UPON WRITTEN NOTIFICATION, AT THE EXPENSE OF <br />THE ELECTRICAL CONTRACTOR. <br />14.ALL BROCHURES, OPERATING MANUALS, CATALOGS, SHOP DRAWINGS, "AS-BUILTS" CONSTRUCTION <br />DRAWINGS, ETC., SHALL BE TURNED OVER TO THE OWNER WITHIN 30 DAYS OF THE COMPLETION OF <br />THE JOB. <br />15.CONTRACTOR ELECTRICAL "AS-BUILTS DRAWINGS" ARE TO INDICATE THE FINAL EQUIPMENT/DEVICE <br />LOCATIONS, CONDUIT ROUTING, PANEL SCHEDULES, SINGLE LINE DIAGRAMS, ETC. - IN CAD OR <br />EQUIVALENT FORMAT FOR THE OWNER'S RECORD AT THE COMPLETION OF THE JOB. <br />16.PROVIDE THE OWNER WITH 1 COPY OF ALL OPERATION AND MAINTENANCE MANUALS FOR LIGHTING, <br />LIGHTING CONTROL, AND ELECTRICAL SYSTEMS. <br />17.LABEL ELECTRICAL SERVICE EQUIPMENT WITH THE MAXIMUM AVAILABLE FAULT CURRENT AT THE <br />INCOMING TERMINALS OF THE EQUIPMENT PER CEC 110.24. <br />18.PROPERLY LABEL ALL ELECTRICAL ROOMS / CABINETS, ELECTRICAL PANELS, TIME SWITCHES, PANEL <br />SCHEDULES, AND MULTI-GANG METERS WITH LAMINATED PLACARDS. ADDITIONALLY, PROVIDE ALL <br />LABELING AND PLACARDS AT SPECIFIC LOCATIONS INDICATED IN THE CONTRACT DOCUMENTS. <br />19.CONTRACTOR SHALL VISIT THE SITE, VERIFY THE EXACT CONDITIONS RELATING TO THE WORK AND <br />SHALL OBTAIN SUCH INFORMATION AS MAY BE NECESSARY TO PRESENT A CONCLUSIVE BID. NO <br />ALLOWANCE SHALL BE MADE FOR ANY EXTRA EXPENSE, DUE TO FAILURE OF THE CONTRACTOR TO <br />MAKE SUCH A FIELD VERIFICATION. BY SUBMITTING A PROPOSAL FOR THE WORK INCLUDED IN THE <br />CONTRACT, THE CONTRACTOR SHALL BE DEEMED TO HAVE MADE THE FIELD VERIFICATION AND <br />ACCEPTS ALL JOB SITE CONDITIONS. <br />20.FINAL LOCATIONS OF EQUIPMENT AND/OR DEVICES SHALL BE VERIFIED WITH THE <br />OWNER/ARCHITECT PRIOR TO ROUGH-IN. <br />21.CONTRACTOR SHALL PROVIDE THE REQUIRED LABOR, MATERIAL, INSURANCE, EQUIPMENT, <br />INSTALLATION PROCEDURES AND PRACTICES/ MEANS AND METHODS, CONSTRUCTION TOOLS AND <br />STORAGE, TRANSPORTATION, ETC. FOR A COMPLETE AND PROPERLY OPERATING ELECTRICAL <br />SYSTEM. <br />22.ALL MATERIALS SHALL BE NEW, AND OF THE SAME MANUFACTURER FOR EACH CLASS OR GROUP OF <br />EQUIPMENT. MATERIALS SHALL BE LISTED AND APPROVED BY UNDERWRITER'S LABORATORIES, AND <br />SHALL BEAR THE INSPECTION LABEL WHERE SUBJECT TO SUCH APPROVAL. MATERIALS SHALL MEET <br />WITH THE APPROVAL OF THE DIVISION OF INDUSTRIAL SAFETY, AND ALL GOVERNING BODIES HAVING <br />JURISDICTION. MATERIALS SHALL BE MANUFACTURED IN ACCORDANCE WITH APPLICABLE <br />STANDARDS ESTABLISHED BY A.N.S.I., U.L., N.E.M.A. AND N.B.F.U. INSTALL PER MANUFACTURERS' <br />RECOMMENDATIONS. <br />23.CONTRACTOR SHALL SECURE ANY PAY FOR ALL NECESSARY BUILDING PERMITS. CONTRACTOR <br />SHALL COORDINATE TEMPORARY CONSTRUCTION REQUIREMENTS INCLUDING POWER, SECURITY, <br />STORAGE, SAFETY, ETC. WITH ALL TRADES PRIOR TO COMMENCING CONSTRUCTION. INCLUDE ALL <br />OF THESE COSTS IN THE BID. <br />24.ALL TRADE LABOR SHALL BE DISCIPLINE TRAINED, COMPETENT AND SKILLED PERSONNEL. PERFORM <br />ALL WORK CONSISTENT WITH THE BEST POSSIBLE TRADE PRACTICES WITH ADHERENCE TO ALL <br />OSHA GUIDELINES. <br />25.WHERE A CONFLICT OCCURS BETWEEN THIS SPECIFICATION AND OTHER SPECIFICATIONS ISSUED <br />AS A PART OF THE CONTRACT DOCUMENTS, THE MORE STRINGENT REQUIREMENT SHALL PREVAIL. <br />26.ALL ADDENDA AND CHANGE ORDERS MUST BE APPROVED BY THE OWNER IN ADVANCE OF STARTING <br />THE WORK. <br />27.CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ALL MAJOR PIECES OF ELECTRICAL EQUIPMENT <br />INCLUDING, BUT NOT LIMITED TO; SWITCHBOARDS, PANELBOARDS, TRANSFORMERS, ALL LIGHTING <br />FIXTURES AND ASSOCIATED CONTROLS. SUBMITTALS SHALL BE MADE TO THE ARCHITECT AS SOON <br />AS IS PRACTICABLE AFTER AWARD OF CONTRACT. <br />POWER <br />1.ALL EXTERIOR ELECTRICAL EQUIPMENT SHALL BE WEATHERPROOF (MIN. NEMA 3R). <br />2.ALL EXTERIOR JUNCTION BOXES SHALL BE LISTED AS WEATHERPROOF WITH WEATHERPROOF <br />COVERS. <br />3.ALL LIGHTING SWITCHES SHALL BE RATED FOR 120-277V, “DECORA” STYLE, AND WHITE UNLESS <br />OTHERWISE NOTED ON THE PLANS OR OWNER'S SPECIFICATIONS. <br />4.ALL GENERAL USE RECEPTACLES SHALL BE NEMA 5-15R, “DECORA” STYLE, AND WHITE UNLESS <br />OTHERWISE NOTED ON THE PLANS OR OWNER'S SPECIFICATIONS. <br />5.ALL RECEPTACLES IN DWELLING UNITS, GUEST ROOMS AND GUEST SUITES IN HOTELS AND MOTELS, <br />AND CHILD CARE FACILITIES SHALL BE TAMPER- RESISTANT TYPE (NEC 406.12). <br />6.PROVIDE COMBINATION A.F.C.I./G.F.C.I. TYPE BREAKERS FOR ALL CIRCUITS FEEDING OUTLETS AND <br />LIGHTS IN DINING ROOM, KITCHEN, LIVING ROOM, ETC. PER SECTION 210.12. <br />7.ALL OUTDOOR RECEPTACLES SHALL BE GFCI PROTECTED AND LISTED AS “WR” WEATHER RESISTANT <br />TYPE PER CEC 406.9. OUTDOOR RECEPTACLES IN DAMP LOCATIONS SHALL HAVE WEATHERPROOF <br />COVERS. OUTDOOR RECEPTACLES IN WET LOCATIONS SHALL HAVE “IN-USE” TYPE WEATHERPROOF <br />COVERS. <br />8.NO PLASTIC ELECTRICAL BOXES ARE TO BE USED. IT IS ACCEPTABLE FOR RESIDENTIAL PER <br />ELECTRICAL CODE AND LOCAL JURISDICTION CODE. <br />9.PER 714.4.2 CBC ELECTRICAL OUTLET BOXES IN WALL OR CEILING SHALL NOT EXCEED 16 SQUARE <br />INCHES PER ONE HUNDRED SQUARE FEET OF WALL. <br />10.RECESSED ELECTRICAL PANELS IN RATED ASSEMBLIES SHALL BE “FIREBOXED” AND CERTIFIED TO <br />MAINTAIN THE ORIGINAL RATING OF THE WALL ASSEMBLY. <br />11.HALF SIZED OR TANDEM CIRCUIT BREAKERS MAY BE USED ONLY IF THE ELECTRICAL EQUIPMENT IS <br />SPECIFICALLY LISTED TO RECEIVE SUCH DEVICES. ALL OTHER PANEL LOCATIONS - FULL SIZE <br />CIRCUIT BREAKER MUST BE USED. <br />12.ALL BRANCH CIRCUIT BREAKERS SHALL BE NQOD (OR APPROVED EQUAL) AND HAVE MIN 75° RATED <br />TERMINATION LUGS. <br />13.ALL BRANCH CIRCUIT BREAKERS FEEDING DWELLING UNIT LIGHTING AND POWER RECEPTACLES <br />SHALL BE LISTED "COMBINATION TYPE AFCI" AND INSTALLED AT THE ORIGIN OF THE BRANCH CIRCUIT <br />[210.12(A)(1)] <br />14.ALL PENETRATIONS (ELECTRICAL BOXES, CABLES, CONDUITS AND ETC…) THROUGH RATED <br />ASSEMBLIES SHALL BE SEALED OR FIRE STOPPED TO MAINTAIN THE RATING OF THE ASSEMBLY WITH <br />A LISTED FIRE STOPPING SYSTEM (I.E. 3M FIRE BARRIER OR EQUAL) IN COMPLIANCE WITH CBC <br />SECTION 712. CONTRACTOR TO INSTALL FIRE STOPPING SYSTEM PER MANUFACTURER'S <br />INSTRUCTIONS AND SPECIFICATIONS. <br />15.REFER TO ACOUSTICAL ANALYSIS / SPECIFICATIONS; PROVIDE PUTTY PADS OR OTHER SYSTEMS AS <br />REQUIRED FOR SOUND ATTENUATION. <br />16.FOR DEVICES WITH SIMILAR FIRE BARRIER REQUIREMENTS. IF THE DENSITY OF OUTLET OPENINGS <br />EXCEEDS 100 SQ. IN. FOR ANY 100 SQ.FT. OF WALL, THEN PUTTY PADS ARE REQUIRED FOR THE <br />ENTIRE WALL. <br />17.PROVIDE EXPANSION AND DEFLECTION FITTINGS, WITH BONDING JUMPERS AT ALL BUILDING <br />EXPANSION OR SEISMIC JOINT CROSSING. <br />18. WIRING SIZE PER CIRCUIT BREAKER TRIP SETTING AND NEC TABLE 310-16. ALL CONDUCTORS ARE <br />MINIMUM #12 THHN/THWN-CU UNLESS OTHERWISE NOTED. MINIMUM 3/4" CONDUIT FOR PVC <br />UNDERGROUND CONDUIT. <br />19.ALL WIRING TO COMPLY WITH CEC ARTICLE 300. CONDUCTORS SHALL BE INSTALLED IN CODE <br />APPROVED RACEWAYS AS REQUIRED. <br />20.INTERIOR WIRING PERMITTED TO BE TYPE NM CABLE IN ACCORDANCE WITH CEC ARTICLE 334 AND <br />LOCAL CODES IN ONE- AND TWO- FAMILY AND MULTIFAMILY DWELLINGS OF TYPE III, IV, AND V <br />CONSTRUCTION. IN OTHER TYPES OF TYPE III, IV, AND V CONSTRUCTION NM CABLE MAY BE <br />ACCEPTABLE, EXCEPT FOR EXPOSED IN ACCESSIBLE DROPPED CEILINGS, EXPOSED CEILINGS OR <br />WHERE PROHIBITED IN CEC 334.12. CONTRACTOR TO VERIFY NM CABLE WIRING METHOD WITH <br />AUTHORITY HAVING JURISDICTION PRIOR TO BIDDING THE JOB. MINIMUM WIRING SIZE PER THE 60 <br />DEGREE "C" COLUMN OF CEC TABLE 310.15(B)(16) (I.E. #12 CU FOR 20A CIRCUIT BREAKERS). <br />21.IT IS PROHIBITED TO SHARE NEUTRAL CONDUCTORS FOR THREE SINGLE PHASE CIRCUITS PER CEC <br />200.4. <br />22.AS REQUIRED, ALL OVERSIZED FEEDERS THAT WERE ADJUSTED IN SIZE TO COMPENSATE FOR <br />VOLTAGE DROP SHALL BE PROVIDED WITH ADAPTER LUGS OR SPLICE BOX. ADAPTER LUGS SHALL <br />BE PROVIDED IF SIZE IS AVAILABLE, OTHERWISE PROVIDE CABLE SPLICES IN THE SPLICE BOX TO <br />REDUCE CABLES TO THE MAXIMUM SIZE THAT THE BREAKER LUGS CAN ACCOMMODATE. <br />23.CLASS 2 & 3 WIRING: <br />CABLES INSTALLED IN PLENUMS SHALL BE TYPE CL2P OR CL3P (CLASS 2 OR 3 RESPECTIVELY). <br />CABLES INSTALLED AS RISERS (CABLES INSTALLED IN VERTICAL RUNS AND PENETRATING MORE <br />THAN ONE FLOOR, OR CABLES INSTALLED IN VERTICAL RUNS IN A SHAFT) SHALL BE TYPE CL2R OR <br />CL3R (CLASS 2 OR 3 RESPECTIVELY). CABLES INSTALLED IN CABLE TRAYS MAY BE TYPE PLTC, CL3P, <br />CL3R, CL3, CL2P, CL2R, OR CL2. <br />24.WHERE MORE THAN TWO NM CABLES ARE INSTALLED THROUGH WOOD FRAMING, SUCH AS TOP OR <br />BOTTOM PLATES WHERE THE OPENING IS SEALED WITH INSULATION OR SEALING (FIRE RATED) <br />FOAM, ETC., THE ALLOWABLE AMPACITY OF EACH CONDUCTOR SHALL BE ADJUSTED IN <br />ACCORDANCE WITH TABLE 310.15. REVIEW CEC 334.80. <br />25.ALL CABLE TRAYS CONTAINING TYPE SE, MC, MI, OR IGS SERVICE ENTRANCE CABLES MUST BE <br />LABELED “CABLE TRAY CONTAINS SERVICE ENTRANCE CONDUCTORS”. <br />26.ALL ELECTRICAL CONDUCTORS WITHIN 6' OF THE ATTIC MUST BE PROTECTED AS PER CEC 320.23A, <br />330.23, 334.23 <br />27.ALL ELECTRICAL EQUIPMENT, BREAKERS, HOUSE PANELS, AND TIME SWITCHES DIRECTORIES SHALL <br />BE PROPERLY TYPED LABELED. <br />GROUNDING <br />1.THE ELECTRICAL SYSTEM SHALL BE GROUNDED AND BONDED IN ACCORDANCE WITH NEC ART. 250 <br />AS ADOPTED AND AMENDED BY THE CEC AND THE ADOPTED EDITION OF THE N.E.C. AS IT RELATES <br />TO OTHER APPLICABLE CODES. <br />2.SEPARATELY DERIVED SYSTEMS SHALL BE GROUNDED PER ART. 250.30 (A) FOR GROUNDED <br />SYSTEMS OR 250.30(B) FOR UNGROUNDED SYSTEMS AND SHALL COMPLY WITH ART. 250.20, 250.21, <br />250.22, AND 250.26. <br />3.THE MAXIMUM RESISTANCE TO GROUND SHALL NOT EXCEED 5 OHMS TO GROUND. <br />4.CONTRACTOR SHALL PROVIDE ALL INSTRUMENTATION AND TESTS FOR MEASURING THE <br />RESISTANCE OF EACH PHASE TO GROUND. A PROPERLY CALIBRATED "MEGGER" TYPE INSTRUMENT <br />SHALL BE USED. IN THE EVENT THAT HIGH RESISTANCE TO GROUNDS ARE FOUND, THEY SHALL BE <br />ISOLATED. MAKE PROPER CORRECTIONS TO RESTORE THE RESISTANCE TO AN ACCEPTABLE VALUE. <br />THIS SHOULD BE PROVIDED BY AN INDEPENDENT, APPROVED TESTING COMPANY. <br />5.ONSITE INDEPENDANT TESTING OF EQUIPMENT SHALL BE REQUIRED FOR SWITCHGEAR OVER 1,000 <br />AMPS. <br />6.PROVIDE BONDED GROUND TO ALL METALLIC PIPE WITHIN THE UNIT, WHEN THERE IS NON METALLIC <br />PIPING FEEDING INTO EACH UNIT MAKING EACH UNIT ISOLATED FROM THE MAIN PIPING SYSTEM <br />WITHIN BUILDING. COMPLY WITH C.E.C 250.104(A)(1); 250.104(A)(2); 250.122. <br />7.NEUTRAL BAR SHALL BE ISOLATED FROM THE GROUNDING BUSBAR AT ALL PANELBOARDS SERVING <br />INDIVIDUAL UNITS. <br />LIGHTING FIXTURES <br />1.IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ACTUAL CEILING CONSTRUCTION TYPE AS <br />DEFINED ON THE ARCHITECTURAL DRAWINGS AND FURNISH ALL LIGHTING FIXTURES WITH THE <br />CORRECT MOUNTING DEVICES WHETHER OR NOT SUCH VARIATIONS ARE INDICATED BY THE FIXTURE <br />CATALOG NUMBER. THE CONTRACTOR SHALL VERIFY DEPTH OF ALL RECESSED LIGHTING FIXTURES <br />WITH ARCHITECTURAL DRAWINGS PRIOR TO ORDERING FIXTURES. ANY DISCREPANCIES THAT <br />WOULD CAUSE RECESSED FIXTURES NOT TO FIT INTO CEILING SHALL BE REPORTED TO THE <br />ARCHITECT PRIOR TO ORDERING FIXTURES. THE CONTRACTOR SHALL VERIFY THE FIXTURE <br />VOLTAGE WITH THE LIGHTING PLAN AND ORDER FIXTURES WHICH WILL OPERATE AT THE VOLTAGE <br />TO WHICH THEY ARE CONNECTED. <br />2.ALL HANDICAP UNIT LIGHTING SWITCHES, RECEPTACLES, THERMOSTATS, AND OTHER CONTROLS <br />SHALL BE LOCATED NO HIGHER THAN +48" AND NO LOWER THAN +15". ON THE KITCHEN COUNTER <br />OR BATHROOM LAVATORY MAXIMUM HEIGHT FOR RECEPTACLES SHALL BE +44". SEE MOUNTING <br />DIAGRAM AS PART OF THIS SET. <br />3.RECESSED LIGHTING FIXTURES WITH DIRECT CONTACT WITH INSULATION SHALL BE TYPE IC (LISTED <br />BY RECOGNIZED TESTING AGENCY). RECESSED NON-TYPE IC FIXTURES SHALL HAVE A MINIMUM OF <br />3” CLEAR FROM INSULATION AND 1” FROM COMBUSTIBLE MATERIALS (NON-TYPE IC RECESSED <br />FIXTURES ARE NOT PERMITTED IN RESIDENTIAL UNITS). <br />4.RECESSED LIGHTING IN RATED ASSEMBLIES SHALL BE EITHER “FIREBOXED” TO MAINTAIN THE <br />RATING OF THE ASSEMBLY OR UTILIZE A LISTED FIXTURE WITH ENCLOSURE THAT MAINTAINS THE <br />ORIGINAL RATING OF THE ASSEMBLY. <br />5.LIGHT FIXTURE RECESSED IN CEILINGS WHICH HAVE A ONE HOUR OR MORE FIRE RATING SHALL BE <br />ENCLOSED IN A BOX WHICH HAS A FIRE RATING (IC) EQUAL TO THAT OF THE CEILING. PROVIDE <br />MINIMUM OF 3" CLEAR FROM ALL SIDES AND TOP OF ENCLOSURE TO CEILING. LIGHTING FIXTURES IN <br />CONTACT WITH INSULATION TO BE U.L LISTED FOR THERMAL BARRIER "CHICAGO PLENM". ALL <br />BALLASTS FOR INDOOR 4 FT. FLUORESCENT IN COMMON AREA SUCH AS RECREATION, MAINTENANCE <br />BLDG., SHALL BE "ENERGY SAVING TYPE" CBM AND U.L. LISTED. <br />6.CEILING INSULATION SHALL BE INSTALLED TO ALLOW 3" MINIMUM CLEARANCE FROM SIDES AND TOP <br />OF RECESSED LIGHT FIXTURES. <br />7.RECESSED LIGHTING FIXTURE IN 1 HR. RATED AREAS REQUIRE BOX BOARD SHELL MINIMIZE <br />PENETRATIONS INTO 1 HR. WALL BETWEEN 2 DWELLING UNITS. INSTALL NMC IN CONDUIT AND SEAL <br />WITH PLASTER, OR FIRE CAULK, INSIDE THE ENDS OF CONDUIT (TO PREVENT SPREAD OF SMOKE OR <br />FIRE). <br />8.IT IS THE INTENT OF THIS PROJECT, TO USE THE HIGHEST EFFICACY LIGHTING PRODUCTS AVAILABLE <br />AND TO USE LED (LIGHT EMITTING DIODE) TYPE LUMINARIES WITH 3000K LIGHT TEMPERATURES AS <br />INDICATED ON THE LUMINARIES SCHEDULE. <br />9.WHERE SPECIFIED, FLUORESCENT BALLASTS SHALL BE ELECTRONIC TYPE. HARMONIC CONTENT <br />SHALL NOT EXCEED 10% ADVANCE MARK V OR EQUAL. <br />10.WHERE SPECIFIED, FLUORESCENT AND HID BALLASTS SHALL BE HIGH POWER FACTOR BALLASTS <br />AND FOUR PIN, 3000 DEGREE KELVIN LAMPS. <br />11.FLUORESCENT LAMP SHALL BE 32 WATT T8, 3000 DEGREE KELVIN, SYLVANIA OR EQUAL. <br />12.HIGH EFFICACY LUMINARIES SHALL BE DEFINED AS FOLLOWS: 30 LUMENS PER WATT (FOR LAMPS 5W <br />OR LESS) 40 LUMENS PER WATT (FOR LAMPS 6W-15W) 50 LUMENS PER WATT (FOR LAMPS 16W-40W) <br />13.MEDIUM AND CANDELABRA BASED SCREW-IN LAMPS DO NOT QUALIFY AS HIGH EFFICACY. GU-24 PIN <br />BASES QUALIFY AS HIGH EFFICACY <br />14.VERIFY MOUNTING HEIGHT OF ALL WALL MOUNTED FIXTURES WITH ARCHITECT PRIOR TO ROUGH-IN. <br />15.ALL WALL FIXTURES SHALL BE INSTALLED SUCH THAT THE LOWEST PORTION OF THE FIXTURE <br />PROTRUDING > 4” IS 80” ABOVE THE FINISHED GRADE OR HIGHER. <br />16.REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATION OF ALL LIGHT <br />FIXTURES. <br />17.LUMINARIES FOR GENERAL LIGHTING IN KITCHEN SHALL HAVE LAMPS WITH AN EFFICACY OF NOT <br />LESS THAN 40 LUMENS PER WATT. A LUMINAIRE WHICH IS THE ONLY LIGHTING IN A KITCHEN WILL BE <br />CONSIDERED GENERAL LIGHTING. GENERAL LIGHTING SHALL BE CONTROLLED BY THE MOST <br />ACCESSIBLE SWITCH(ES) IN THE KITCHEN. ADDITIONAL LUMINARIES TO BE USED ONLY FOR SPECIFIC <br />DECORATIVE EFFECTS NEED NOT MEET THIS REQUIREMENT. U.N.O <br />18.EACH ROOM CONTAINING A WATER CLOSET SHALL HAVE AT LEAST ONE LUMINAIRE WITH LAMPS <br />WITH AN EFFICACY OF NOT LESS THAN 40 LUMENS PER WATT. IF THERE IS MORE THAN ONE <br />LUMINAIRE IN THE ROOM THE HIGH EFFICACY LUMINARIES SHALL BE SWITCHED AT AN ENTRANCE TO <br />THE ROOM. <br />19.ALL RECESSED LUMINARIES IN INSULATED CEILINGS SHALL BE TESTED AND LISTED FOR ZERO <br />CLEARANCE INSULATION COVER (IC) AND AIR TIGHT (AT) BY RECOGNIZED TESTING LABORATORIES. <br />ELECTRICAL CONTRACTOR TO VERIFY THIS INFORMATION BEFORE PURCHASING DOWNLIGHT <br />HOUSING. <br />20.WHERE LOW LEVEL EXIT SIGNS ARE SHOWN ON PLANS, THEY SHALL BE MOUNTED NOT LESS THAN 6" <br />AND NO MORE THAN 8" FROM FINISH FLOOR TO BOTTOM OF SIGN AND 4" FROM DOOR FRAME TO <br />CLOSEST EDGE OF SIGN. PROVIDE LOW LEVEL EXIT SIGNS AS REQUIRED PER CODE. <br />21.ALL FIXTURES INDICATED WITH "COLOR AS SELECTED BY THE ARCHITECT" SHALL BE PROVIDED <br />WITH CUSTOM COLORS PER THE ARCHITECT. SUBMIT SAMPLE COLOR CHIPS TO THE ARCHITECTS <br />PRIOR TO ORDERING FIXTURES. TRIM RINGS FOR RECESSED DOWNLIGHTS SHALL BE COLOR AS <br />SELECTED BY THE ARCHITECT. VERIFY COLOR SELECTION WITH THE ARCHITECT. <br />22.FOR OUTDOOR LIGHTING BRANCH CIRCUITS FROM BUILDING, INSTALL A RECESSED 4S, 2 1/8" (MIN) <br />DEEP J-BOX WITH 2-GANG SWITCH RING GASKET WEATHERPROOF BLANK METAL COVER AT +12" <br />TYPICAL. <br />23.POLE LIGHT AND POLE BASE COVER SHALL BE PRIMED WITH ONE COAT OF IRON OXIDE RUST - <br />INHIBITIVE PRIME BASE COVER SHALL BE TWO PIECE HYDRO FORMED ALUMINUM BAKED POWDER <br />URETHANE FINISHED COAT SELECT BY OWNER AND PAINTED BY MANUFACTURER. REFER TO <br />STRUCTURAL DRAWINGS FOR CONCRETE BASE POLE DIMENSIONS. <br />24.EXTERIOR LIGHTING SHALL BE "DARK/NIGHT SKY" COMPLIANT AS DEFINED AND ADOPTED BY THE <br />LOCAL AHJ. AT A MINIMUM, THE LIGHT SOURCE SHALL BE SHIELDED AND NOT DIRECTLY VISIBLE AS <br />DETERMINED BY THE AHJ. <br />MECHANICAL SYSTEM <br />1.VERIFY EXACT LOCATIONS AND ORIENTATION OF ALL MECHANICAL EQUIPMENT WITH MECHANICAL <br />DRAWINGS. FIELD VERIFY CONDITIONS WITH MECHANICAL CONTRACTOR PRIOR TO ROUGH-IN. <br />2.REFER TO THE MECHANICAL DRAWINGS FOR EXACT EQUIPMENT RATINGS AND ELECTRICAL <br />REQUIREMENTS. COORDINATE WITH THE INSTALLER OF THE HVAC SYSTEMS AND PROVIDE ALL <br />CONDUIT, WIRING, TIME CLOCKS, STARTERS, CONTROL DEVICES, RELAYS, DISCONNECT SWITCHES, <br />FIRE SMOKE DAMPERS, ETC. FOR THE PROPER OPERATION OF THE MECHANICAL SYSTEMS. REFER <br />TO THE MECHANICAL DRAWINGS AND ADDENDUMS FOR ADDITIONAL ELECTRICAL REQUIREMENTS. <br />3.INSTALL 8#14-CU CABLE FROM FAN COIL (FAU) TO HEAT PUMP (CONDENSING UNIT) AND INSTALL <br />FUSIBLE DISCONNECT SWITCH NEMA -3R IN-LINE OF SIGHT OF EQUIPMENT. INSTALL FUSE(S) AS <br />INDICATED ON NAME PLATE. <br />4.ALL EQUIPMENT, ENCLOSURES, DEVICES, DISCONNECT SWITCHES, CONNECTIONS, ETC. LOCATED ON <br />THE ROOF SHALL BE WEATHERPROOF - NEMA 3R. <br />5.DISCONNECT SWITCHES SHALL BE HEAVY DUTY HORSEPOWER RATED. SIZE SWITCH AND FUSED PER <br />THE NAMEPLATE VALUE ON THE MECHANICAL UNIT. <br />FIRE ALARM <br />1.SUBMIT A VARIANCE TO SEPARATE FIRE ALARM. <br />ADDITIONAL OTHER NOTES <br />1.ALL EQUIPMENT SHALL BE MOUNTED AND SUPPORTED ACCORDING TO THE OSHA REQUIREMENTS. <br />2.SWITCHGEAR IS BASED ON DIMENSIONAL INFORMATION PROVIDED BY EATON OR OTHER <br />MANUFACTURER. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THAT THE <br />SWITCHGEAR INTENDED FOR USE AT THIS FACILITY, FITS THE SPACES PROVIDED. <br />3.CONTRACTOR TO CONFIRM THE LOW VOLTAGE (<110V) CABLING REQUIREMENTS PRIOR TO BIDDING <br />THE JOB. THE ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL BELDEN CA. NO. 9248 RG6/U <br />TYPE COAXIAL CABLE TRANSMISSION LINE (CONFIRM EXACT CABLE TYPE WITH COMMUNICATIONS <br />VENDOR FOR THE PROJECT) WITH INDIVIDUAL HOMERUNS FROM COMMUNICATIONS MPOE ROOM TO <br />CATV TERMINAL SERVICE BOX AT IDF ROOMS AND TO UNIT HSD BOX. <br />4.PROVIDE A MINIMUM OF A 4FT X 8FT X 3/4IN FIRE RATED PLYWOOD BACKBOARD IN EACH MPOE AND <br />IDF ROOM, WITH A #6 COPPER (MIN) GROUND BONDED TO BUILDING GROUNDING SYSTEM. PROVIDE A <br />DEDICATED QUAD PLEX RECEPTACLE PROTECTED BY A DEDICATED 20A/1P CIRCUIT IN THE MPOE <br />AND EACH IDF ROOM, FOR THE CATV / PHONE PROVIDERS. FOR EXACT SIZE AND MORE DETAILS, <br />REFER TO LOW VOLTAGE CONSULTANT. <br />5.CONTRACTOR TO VERIFY MIN. DIMENSIONS REQUIRED FOR EQUIPMENT SIZES & CLEARANCES IN THE <br />ELECTRICAL ROOM WITH ACCOMMODATION FOR LOW VOLTAGE, GAS, ETC. WHEN APPLICABLE PRIOR <br />TO PLACING THE ORDER FOR SUCH EQUIPMENT & REPORT ANY DISCREPANCY TO THE OWNER, <br />ARCHITECT & ENGINEER. AN APPROVED EQUIPMENT SUBMITTAL IS NOT A CONTRACTOR <br />VERIFICATION OF EQUIPMENT CLEARENCES AND DIMENSIONS AT THE ELECTRIC ROOM - AS <br />REQUIRED ABOVE. <br />6.PENETRATIONS IN PARTY WALLS SHALL BE ACOUSTICALLY SEALED WITH "POLYCEL" AROUND NMC, <br />CABLE, AND OTHER DEVICES SUCH AS RECEPTACLES, J-BOXES, ETC. ELECTRICAL DEVICES <br />INSTALLED IN OPPOSITE FACES OF PARTY OR DIVISION WALL SHALL BE SEPARATED HORIZONTALLY <br />NOT LESS THAN 24 INCHES. (IN DIFFERENT STUD BAYS FOR WOOD WALLS). <br />TYPICAL DWELLING NOTES <br />1.UTILIZE THE RESPECTIVE TYPICAL DWELLING ELECTRICAL PLANS FOR PRICING OF WIRING, DEVICES, <br />AND EQUIPMENT IN EACH DWELLING UNIT. TYPICAL DWELLING ELECTRICAL PLANS INDICATE <br />QUANTITIES OF ALL WIRING, DEVICES, AND EQUIPMENT IN EACH DWELLING UNIT (REGARDLESS OF <br />EXACT DWELLING LAYOUT/DIMENSIONS). TYPICAL DWELLING ELECTRICAL PLANS INDICATE THE <br />GENERAL ARRANGEMENT AND APPROXIMATE LOCATIONS OF ALL WIRING, DEVICES. AND EQUIPMENT <br />IN EACH DWELLING UNIT AND MUST BE ADJUSTED FOR EXACT DWELLING LAYOUT/DIMENSIONS. <br />2.PROVIDE EXACT LOCATIONS AND LAYOUT OF ALL WIRING, DEVICES, AND EQUIPMENT IN EACH <br />DWELLING UNIT AS PER THE ACTUAL DWELLING ARCHITECTURAL LAYOUT/DIMENSIONS. VERIFY. <br />COORDINATE. AND ADJUST EXACT DEVICE/EQUIPMENT LOCATIONS TO SUIT THE EXACT LAYOUT AND <br />CONFORM WITH ALL APPLICABLE NEC LAYOUT/LOCATION REQUIREMENTS. <br />3.ACTUAL DWELLING ARCHITECTURAL LAYOUT/DIMENSIONS FOR EACH TYPICAL DWELLING TYPE MAY <br />VARY SLIGHTLY FROM UNIT TO UNIT. OVERALL FLOOR ELECTRICAL PLANS GENERALLY INDICATE <br />EXACT LAYOUTS OF EACH INDIVIDUAL DWELLING UNIT. REFER TO ARCHITECTURAL DRAWINGS FOR <br />EXACT INDIVIDUAL DWELLING LAYOUTS AND DIMENSIONS. <br />4.LOCATE DEVICES IN SUCH A MANNER TO MAINTAIN ANY REQUIRED FIRE RATING AND SOUND <br />TRANSMISSION INTEGRITY IN ACCORDANCE WITH ALL APPLICABLE CODES AND STANDARDS. WHERE <br />DEVICE BOXES ARE LOCATED ON OPPOSITE SIDES OF FIRE OR SOUND RATED WALLS, MAINTAIN <br />MINIMUM SPACING BETWEEN BOXES AS PER THE NEC. <br />5.ADAPTABILITY, COMMUNICATIONS: ALL DWELLING UNITS ARE "COMMUNICATIONS ADAPTABLE", <br />WHICH IS DEFINED AS CAPABLE OF BEING MADE “COMMUNICATIONS ACCESSIBLE” IN THE FUTURE <br />(SEE BELOW FOR "COMMUNICATIONS ACCESSIBLE* UNITS). COMMUNICATIONS ADAPTABLE <br />UNITS INCLUDE ALLOCATED SPACES FOR FUTURE DOORBELL DEVICES (PUSH-BUTTONS, CHIMES, <br />AND STROBES) AND FUTURE FIRE ALARM VISUAL ONLY STROBES (THESE DEVICES ARE NOT IN <br />CONTRACT [N.I.C.]). PROVIDE SUITABLE PATHWAYS AND/OR WIRING TO EACH “ADAPTABLE"LOCATION <br />TO FACILITATE FUTURE DEVICES AS PER THE FOLLOWING OPTIONS. <br />A.NOTE THAT OPTION "A" IS ONLY PERMITTED WHERE SPECIFICALLY ACCEPTABLE TO THE OWNER <br />(OPTION "A" WILL BE REVIEWED ON AN INDIVIDUAL CASE-BY-CASE BASIS). OPTIONS "B” AND "C” MAY <br />BE USED AT THE CONTRACTOR'S OPTION (EITHER OPTION "B” OR OPTION “C" MUST BE USED <br />WHEREVER THE OWNER DOES NOT SPECIFICALLY ACCEPT OPTION "A’). <br />B.WHERE BUILDING CONSTRUCTION READILY FACILITATES PULLING WIRING IN THE FUTURE (I.E. VIA <br />ACCESSIBLE CEILING SPACES AND VIA FISHING HOLLOW WALL AND CEILING CAVITIES; PROVIDED <br />CABLE CAN BE EASILY AND READILY PULLED INTO THE PATHWAYS ONCE CONSTRUCTED), <br />ADDITIONAL WIRING PROVISIONS ARE NOT REQUIRED. THIS OPTION IS ONLY ACCEPTABLE WHERE <br />THE ELECTRICAL CONTRACTOR DEMONSTRATES HOW WIRING CAN BE EASILY INSTALLED IN THE <br />FUTURE AND WHERE THE OWNER ACCEPTS THE DEMONSTRATION. <br />C.PROVIDE A SUITABLE PATHWAY (IN THE FORM OF CONDUITS AND SLEEVES IN BUILDING <br />CONSTRUCTION) TO ALLOW INSTALLING CABLES IN THE FUTURE. PROVIDE CONTINUOUS PULL <br />WIRES THE LENGTH OF ALL PATHWAYS. INSTALL IN SUCH A WAY THAT CABLE CAN BE PULLED IN <br />USING THE PULL WIRE ALONE, WITHOUT RESORTING TO ANY OTHER MODIFICATIONS TO BUILDING <br />CONSTRUCTION (OTHER THAN CUTTING OPENINGS FOR DEVICE OUTLET BOXES. <br />INSTALL APPROPRIATE SPARE SYSTEMS CABLE IN CONSTRUCTION FROM THE COMMON CORRIDOR <br />OUTSIDE OF THE DWELLING UNIT TO THE "ADAPTABLE" LOCATION AND COIL SUFFICIENT SLACK <br />CABLE AT BOTH ENDS. <br />WHERE DWELLING UNITS INCLUDE AUDIBLE-ONLY FIRE ALARM SIGNALING DEVICES, PROVIDE <br />WIRING (INCLUDING VISUAL DEVICE CONTROLLING WIRING) AT EACH AUDI@LE FIRE ALARM <br />SIGNALING DEVICE LOCATION TO FACILITATE REPLACING EACH AUDIBLE-ONLY FIRE ALARM DEVICE <br />WITH AN AUDIO/VISUAL FIRE ALARM SIGNALING DEVICE. <br />6.ACCESSIBILITY, COMMUNICATIONS: VERIFY AND COORDINATE (WITH THE ARCHITECT) ALL DWELLING <br />UNITS REQUIRED TO BE EQUIPPED WITH ACCESSIBLE COMMUNICATIONS FEATURES <br />("COMMUNICATIONS ACCESSIBLE”) IN COMPLIANCE WITH ANSI/ICC A117.7, THE AMERICANS WITH <br />DISABILITIES ACT (ADA), AND ASSOCIATED ACCESSIBLE BUILDING CODES. ALL DWELLING UNITS <br />SPECIFICALLY INDICATED ON ANY DRAWINGS (ARCHITECTURAL, ELECTRICAL, OR OTHERWISE) OR <br />OTHERWISE DESIGNATED BY THE ARCHITECT FOR USE BY OCCUPANTS WITH VISUAL OR HEARING <br />IMPAIRMENT SHALL BE CLASSIFIED AS "COMMUNICATIONS ACCESSIBLE”. FOR ALL "COMMUNICATIONS <br />ACCESSIBLE” UNITS, FURNISH AND INSTALL ALL DOORBELL DEVICES (PUSH-BUTTONS, CHIMES, AND <br />STROBES) AND FIRE ALARM VISUAL ONLY STROBES AT THE RESPECTIVE "ADAPTABLE" (I.E. DASHED <br />ON DRAWINGS) LOCATIONS SHOWN ON TYPICAL DWELLING UNIT PLANS. <br />FOR COMMUNICATIONS ACCESSIBLE DWELLING UNITS, PROVIDE AUDIO/VISUAL FIRE ALARM <br />SIGNALING DEVICES AT EACH AUDIBLE FIRE ALARM SIGNALING DEVICE LOCATION SHOWN ON THE <br />DRAWINGS. <br />7.ACCESSIBILITY, OPERABLE PARTS: WITH RESPECT TO OPERABLE PARTS, ALL DWELLING UNITS ARE <br />CONSIDERED "OPERABLE PARTS ACCESSIBLE” UNITS. LOCATE EQUIPMENT AND DEVICES (LIGHTING <br />CONTROLS, SWITCHES, RECEPTACLES, HVAC CONTROLS, INTERCOM CONTROLS, OTHER CONTROLS, <br />ETC.) TO COMPLY WITH ACCESSIBLE MOUNTING HEIGHTS AND REACH RESTRICTIONS (SEE <br />SPECIFICATIONS FOR <br />ADDITIONAL INFORMATION). <br />FOR ALL RANGE HOODS INSTALLED IN DWELLING UNITS WHICH ARE DESIGNATED AS “ACCESSIBLE” <br />OR WHERE ACCESSIBILITY OF OPERABLE ARTS IS OTHERWISE REQUIRED, PROVIDE A SEPARATE <br />SWITCH LOCATED ABOVE THE COUNTER ADJACENT TO THE RANGE TO CONTROL THE RANGE HOOD. <br />8.ACCESSIBILITY, ARCHITECTURAL/MOBILITY: ELECTRICAL WORK ONLY INVOLVES ACCESSIBILITY OF <br />COMMUNICATIONS FEATURES AND OPERABLE PARTS (WHICH ARE ADDRESSED ABOVE). <br />ARCHITECTURAL ACCESSIBILITY AND ACCESSIBILITY ASSOCIATED WITH MOBILITY IMPAIRMENT DO <br />NOT INVOLVE ELECTRICAL WORK. UNITS CLASSIFIED AS ACCESSIBLE FOR ARCHITECTURAL AND/OR <br />MOBILITY PURPOSES DO NOT IMPACT ELECTRICAL WORK (ELECTRICAL WORK SPECIFIED IS <br />CURRENTLY SUITABLE FOR SUCH CLASSIFICATION). <br />GENERAL NOTES <br />E-0.1B <br />GENERAL NOTES