My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2102 S Flower St - DEF1 - Plan
PBA
>
Building
>
ProjectDox
>
F
>
Flower St
>
2102 S Flower St
>
2102 S Flower St - DEF1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2026 5:00:12 AM
Creation date
1/22/2026 5:00:07 AM
Metadata
Fields
Template:
Plan
Permit Number
101125788
Full Address
2102 S Flower St
Street Number
2102
Street Direction
S
Street Name
Flower
Street Suffix
St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6 <br />Prior to installation, plan your system: <br />1. Ensure selected installation location(s) for Metal Energy Absorber HLL system(s) will withstand minimum <br />loads as specified by this instruction manual. <br />2. ALWAYS make considerations to eliminate or reduce swing fall hazards. <br />3. Fall clearance for each installation location MUST be calculated by a Qualified Person, and MUST be <br />considered in the selection of PFAS equipment. <br />4. Ensure all components of PFAS are selected and deemed compatible with Metal Energy Absorber HLL <br />system by a Competent Person. <br />5. Ensure entire HLL system design and installation is done under supervision of Qualified Person. NEVER judge <br />HLL tension by eye; ALWAYS measure line sag and keep in concordance with sag requirements specified by <br />this instruction manual. NEVER over-tighten cable. Proper sag in cable reduces forces of Fall Arrest. <br />6. If performing installation at heights over 6’, ALWAYS use a complete and independent PFAS until <br />Metal Energy Absorber HLL System is fully installed and able to withstand forces of Fall Arrest as specified by this <br />instruction manual. Always maintain 100% tie-off. <br />Guardian recommends using 3/8” diameter cable. DO NOT use vinyl/plastic coated cable. <br />MINIMUM 1 Metal Energy Absorber required for systems up to 60’. MINIMUM 2 Metal Energy Absorbers <br />required for systems longer than 60’. Entire HLL system MUST NOT span more than 100’. <br />Installation and Use <br />Installation: <br />Tools needed for installation: <br />• 5/16” (8mm) wrench, 3/4” (19mm) wrench, 19/32” (15mm) wrench, Adjustable wrench, Torque wrench <br />(capable of measuring foot-pounds). <br />1. Select locations for all anchor points in HLL system. Ensure anchor points meet stated strength <br />requirements. Ensure proper fall clearance exists for entire system. <br />2. Lay out as much of HLL system as possible prior to attaching it to anchorage connectors.
The URL can be used to link to this page
Your browser does not support the video tag.