Laserfiche WebLink
Installation Instructions with Compression Bracket <br />1py-$*/3.-:+faid <br />2,· <br />4 <br />-94*424 <br />1 2 3 4 <br />'v,·sti-4· <br />',fi?*123<2;crt.43.7 <br />1. Locate the rafters and snap horizontal and vertical lines to mark the <br />installation position for each flashing. <br />2. Drill a pilot hole (1/4"diameter) for the lag bolt. Backfill with sealant. <br />3. Insert the flashing so the top part Is underthe next row of shingles <br />and pushed far enough up slope to prevent water infiltration through <br />vertical joint in shingles. <br />4. Line up pilot hole with flashing hole. <br />5. Insert the lag bolt through the EPDM washer, the top compression <br />component (Comp Slide 4' Bracket pictured) and the gasketed hole in <br />the flashing and into the rafter. <br />6. Torque: The range i5 between 100-140 torque inch-pounds depending <br />on thetype of wood and timeof year. The visual indicator for proper <br />torque is when the EPDM on the underside of the bonded washer <br />beginsto push out the sides as the washercompresses. If using an <br />impact wrench to install the fasteners be careful not to over torque the <br />fastener. You may need to stop and use a ratchet to finish the install. <br />877-859-3947 Committed to the Support of Renewable Energy © Ecofasten Solar- All content protected under copyright. All rights reserved 04/8/14 <br />.