Laserfiche WebLink
Installation Instructions <br />* Use for vertical adjustment when leading edge of flashing hits nails in upper shingle courses <br />1. Slide flashing up under shingles until leading edge <br />engages nails. Measure remaining distance to adjust <br />upslope. <br />2. Remove flashing and cut"V" notch at marks where nail shafts <br />engaged leading edge of flashing the distance desired in Step 1. <br />Notch depth not to exceed 2" length by 1 /2" width. <br />;:.'- 4;1:,..I <br />Placement of "V' notch <br />2" <br />3. Reinstall flashing with notched area upslope,4. Position notched leading edge underneath nail heads as shown. <br />' Nails beneath shingle <br />, 764 <br />ir.943944.·*,2, 7 <br />Nails beneath shingle <br />.49@47-A <br />877-859-3947 Comm Imed to the Support of Renewable Energy © EcoFasten Solar- All content protected under copyright. All rights reserved. 04/8/14