Laserfiche WebLink
QBase Universal Tile Mount I QMUTM QBase Universal Tile Mounting Instructions <br />Subflashing Waterproofing Method: Lapped Paper <br />Installation Tools Required: tape measure, drill with 7/32" bit, drill or impact gun with 1/2" deep socket, caulking gun and sealant <br />DESCRIPTION QTY.NO.Nt JMBFR compatible with roofing material, 30 Ib felt paper, whisk broom, roofing bar, angle grinder with a diamond blade <br />1 2201 CAP SCREW, HEX HEAD, 5/16"-18 X 3/4" UNC-2A, GRADE 8 1 <br />2 1110 QBASE, 1-1/4" ID, FOR 5/16" HARDWARE. A360.1 CAST AL 1 WARNING: Quick Mount PV products are NOT designed and should NOT be used to anchor fall protection equipment. <br />3 2309 LAG SCREW, HEX HEAD, 5/16" X 3% ZINC 2 <br />4 1501 SUBFLASHING, SPUN CONE. QBASE, 9'*9'1.020". 3003 AL MILL <br />5 1310 FL ASHING, SPUN CONE, 18"X 18"X.032", 3003 AL. MILL <br />6 2990 COLLAR, COUNTER FLASHING. 1-1/4" ID EPDM <br />7 5316 POST, 1.25" OD X 6.5", 6063-T5, MILL <br />8 2104 WASHER, SEALING, 5/16" ID X 1-1/4"OD. EPDM BONDED SS <br />9 2101 WASHER, FENDER, 5/16" ID X 1" OD, 18-8 SS <br />10 2108 WASHER. SPLIT-LOCK, 5/16" ID, 18-8 SS <br />11 2203 CAP SCREW, HEX HEAD, 5/16'118 X 1" UNC-2A, 18-8 SS <br />;,?AL <br />1,an*.An i <br />77739 1 <br />1 Ch <br />1 <br />1 <br />1 I 1 <br />1 <br />1 <br />1 <br />Remove tile at selected location of mount.Locate and mark center of rafter. Clean felt paper Use a straight edge and measure up 6 5/8" from bob <br />i with hand broom.tom of tiles to center of the mount overthe center <br />1 of rafter. <br />AVAILABLE IN MILL, CLEAR ANODIZED, <br />AND BRONZE ANODIZED FINISHES. <br />STAINLESS STEEL LAG SCREWS <br />INCLUDED WITH ANODIZED FINISHES. <br />Quick Mount PV <br />TITLE: <br />QMUTM: QBASE UNIVERSAL TILE <br />MOUNT <br />nOMIETAR, AND CONFIDENT,At:*--m:NRA'-.-m;62.4,2-9.'r7%0:A@..OUNIPV. AN,REPROOUCâ„¢,NPARTORAS <br />UNLESS OTHERWISE SPECIFIED: <br />DIMENSIONS ARE IN INCHES <br />TOLERANCES: <br />- FRACTIONAL: 1/8 <br />DO NOT SCALE DRAWING 'IWO PLACE DECIMAL 1.18 <br />THREEPLACE DECIMAL :.125 <br />4 <br /> SIZE DRAWN BY: RAD ' REV <br />i A [ UTE: 101 1/20-G i 6 <br />SCALE: l:8 |WaGHT: 2.26 SHEET I OF 2 <br />5 4 3 <br />Ultimate Load Capacity <br />2 1 <br />t <br />Align QBase (item 1) over rafter center and drill <br />two %2" pilot holes. Fill pilot holes with seal- <br />ant compatible with roofing material. Place <br />grade-8 cap screw (item 2) under QBase in hex <br />slot, threads pointing up. Lag QBase into rafter <br />through pilot holes. <br />Install subflashing (item 5) in either the lapped <br />paper method explained on this page or the three- <br />course method explained on the next page. <br />Take care to do a quality installation. When using <br />the paper method, slide subflashing under felt <br />overlap orcut an additional piece of felt paper 18" <br />wideto slide underthe course above, and over the <br />primary flashing of the mount.This is essential for <br />properwaterproofing. <br />Average values based on failure tests results in Douglas Fir <br />Test Setup <br />Source: AME Report 111316C, 7/5/2011 <br />Please note: <br />1)The ultimate load is NOT thesameas allowable load. Ultimate load isthe load atthe pointof failure. Since pointof failure isusually heavilydependenton the roof itself, allowable load <br />should be calculated by the responsible engineer using the appropriate factor of safety for that job. <br />2) Thread must be embedded in a rafterorotherstructural roof member. <br />3) See IBC for required edge distances. <br />Ultimate Load Capacity [lbf]Rafter moisture content (96)Rafter specific gravity Failure Mode <br />You are now ready for the rack of <br />Pullout 3031 20.9 0.436 Lag Bolt Pulled Out yourchoice. Follow all the directions <br />Shear Parallel to Rafter 803 13.8 0.438 Lag Bok Pulled Out of the rack manufacturer as well as <br />Shear Perpendicular to Rafter 583 16.5 0.451 Plywood buckled/ Lag the module manufacturer. <br />Bolt Pulled Out <br />All roofing manufacturers' written <br />instructions must also be followed <br />by anyone modifying a roof system. <br />Please consult the roof manufactur- <br />er's specs and instructions prior to <br />touching the roof. <br />uick Mount Py <br />RESPECT THE ROOF <br />With a diamond blade on a grinder or skill-saw, <br />cut tile to allow post to pass through. Place cut tile <br />back in position. Insert post (item 3) and tighten <br />into place. <br />Install the 18"x 18" flashing (item 6). Pre-bend the <br />flashing to follow the contour of the tile if curved. <br />Apply sealant where post and flashing meet, and <br />install EPDM counter flashing collar (item 7). Be <br />sure to seal off the post from weather exposure <br />with the racking hardware (items 8-11) in the in- <br />terim before racks are installed. <br />B17.2.3-4 Oct-2013, Rev 6Bl 7.2.3-4 Oct-2013, Rev 6 <br />1 of 4 2 of 4