My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3600 W McFadden Ave-EV Chargers - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
3600 W McFadden Ave
>
3600 W McFadden Ave-EV Chargers - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:02:50 AM
Creation date
2/13/2026 5:00:30 AM
Metadata
Fields
Template:
Plan
Permit Number
20185230
101122589
Full Address
3600 W McFadden Ave
Street Number
3600
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Document Relationships
101122589 - Permit
(Permit - Plan)
Path:
\Building\Permits\M\McFadden Ave\3600 W McFadden Ave
20185230 - Permit
(Permit - Plan)
Path:
\Building\Permits\M\McFadden Ave\3600 W McFadden Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />This document is a Property of BTCPower Inc. and shall not be <br />copied, reproduced, or used as the basis for sale or manufacture <br />of apparatus without written permission. <br />23-Sep-22 Rev D <br /> <br />360kW High Power DC Charger <br />INSTALLATION AND USER’S MANUAL <br />Page 89 of 89 <br />REVISION HISTORY <br /> <br />REVISION HISTORY <br />Revision Date Description Originator <br />0 21-Apr-22 Initial Release Rosh Dihayco <br />A 06-Jun-22 <br />• Added Dispenser MCU Dipswitch settings <br />• Updated error codes <br />• Updated Dispenser DC Input Terminal Lug <br />information <br />• Updated Tower images, renderings, and <br />drawings <br />• Change location of label for Tower – Page 12 <br />Rosh Dihayco/ <br />Bryan Bascon <br />B 15-Aug-22 <br />• Page 20 – Adjusted bolt quantity to “10 or 16 <br />(Depending on # of Dispensers being installed)” <br />• Page 28 – Distinguished different quantities of <br />bolts required for both Tower and Dispenser <br />N. Kim <br />C 20-Sep-22 <br />• Page 29 – Updated drawings to include <br />dimensions between the mounting holes and <br />added language on requiring mounting the <br />front holes and being able to choose from either <br />pair of the rear mounting holes for the Tower <br />footer. <br />N. Kim <br />D 23-Sep-22 • Added fiber-optic and interlock cable routing <br />information on page 40. <br />N. Kim <br />
The URL can be used to link to this page
Your browser does not support the video tag.