My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3600 W McFadden Ave-EV Chargers - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
3600 W McFadden Ave
>
3600 W McFadden Ave-EV Chargers - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:02:50 AM
Creation date
2/13/2026 5:00:30 AM
Metadata
Fields
Template:
Plan
Permit Number
20185230
101122589
Full Address
3600 W McFadden Ave
Street Number
3600
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Document Relationships
101122589 - Permit
(Permit - Plan)
Path:
\Building\Permits\M\McFadden Ave\3600 W McFadden Ave
20185230 - Permit
(Permit - Plan)
Path:
\Building\Permits\M\McFadden Ave\3600 W McFadden Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />360kW High Power DC Charger <br />INSTALLATION AND USER’S MANUAL <br />Page 69 of 89 <br />This document is a Property of BTCPower Inc. and shall not be <br />copied, reproduced, or used as the basis for sale or manufacture <br />of apparatus without written permission. <br />23-Sep-22 Rev D <br /> <br />MAINTENANCE <br /> <br />10. Maintenance <br /> <br />DANGER <br />All servicing must be performed ONLY by qualified personnel. Do not attempt to service the 360kW <br />High Power DC Charger yourself. <br />Make sure to turn off the power to the charger before performing any maintenance activity. <br /> <br />Maintenance Precautions <br />Each of the capacitors in this device have a high voltage for a time after shutting off the input <br />power supply. Must allow five (5) minutes after powering down before servicing internal <br />components. <br />Maintenance Items <br />Perform periodic maintenance of both Power Unit / Tower and Dispenser units. <br />Outlined below are the mandatory maintenance works for the Power Unit / Tower unit that must <br />be carried out in the prescribed interval. <br />SCOPE MAINTENANCE WORK INTERVAL <br />External Maintenance • Check the DC Power Unit / Tower for mechanical <br />damage, corrosion, restriction of IP degree of <br />protection, abnormal odor etc. <br />• Check branding labels and signages are in good <br />and legible condition <br />• Clean using water or neutral pH solution <br />Annual <br />Internal Maintenance • Check door conditions with no gaps around door <br />and gasket <br />• Vacuum clean internal components from dust <br />• Clean and check air intake and exhaust vents for <br />debris and foreign materials <br />• Replace air filters every two (2) years or as <br />necessary <br />• Check if power modules are fully seated <br />• Inspect AC/DC terminations and look for signs of <br />arcing and heat-stress on cables and bussing <br />Annual <br />
The URL can be used to link to this page
Your browser does not support the video tag.