Laserfiche WebLink
8" MAX. <br />PERIMETER SEISMIC CLIP <br />ANGLE MOLDING EDGE TRIM <br />SCREWED TO EACH STUDCROSS TEE <br /><10'-0" : TWO 1-5/8" (25GA) METAL STUD <br /><15'-0" : TWO 2-1/2" (25GA) METAL STUD <br /><20'-0" : TWO 3-5/8" (25GA) METAL STUD <br />STUD <br />ORIENTATION <br />Specifications: <br />Ceiling grid <br />classification: Heavy-Duty <br />Manufacturer's <br />catalog number <br />Main runner: <br />Cross runner: <br />Runner splice: <br />Armstrong <br />Prelude XL15__ <br />16 <br />" <br />7301 <br />7340 <br />Armstrong <br />Suprafine XL 9__ <br />16 <br />" <br />7501 <br />7540 <br />USG DONN <br />DX/DXT 15__ <br />16 <br />" <br />ZXLA26 <br />ZXLA424 <br />TFS-1 <br />USG DONN <br />DX/DXT 9__ <br />16 <br />" <br />DXT26 <br />DXT424 <br />TFS-1 <br />SUSPENDED CEILING NOTES (INSTALLATION REQUIREMENTS): COMPLY WITH CBC 2501A.5 AND ASCE 7 <br />Fixture Attachment: Attach all light fixtures and <br />ceiling mounetd air terminals to the ceiling grid <br />runnders to resist a horizontal force equal to the <br />weight of the fixtures. Screws or approved fasteners <br />are requried. <br />Flush or recessed light fixtures and air terminals <br />weighing less than 56 lbs. may be supported directly <br />on the runners of a heavy duty grid system, but in <br />addition, must have a minimum of (2) #12 ga. slack <br />safety wires attached to the fixture at diagonal <br />corners and anchored to the structure above. All 4'x4' <br />fixtures must have slack safety sires at each corner. <br />All flush or recessed light fixtures and air terminals <br />weighing 56 lbs. or more must be independently <br />supported by not less than (4) taut #12 ga. wires, <br />each attached to the fixture and to the structure <br />above regardless of the type of grid system used. <br />Surface Mounted Light Fixtures: Support surface <br />mounted light fixtures by at least two positive devices <br />which surround the ceiling runner and which are <br />each supported from the structure ababove by a #12 <br />ga. wire. Spring clips or clamps that connect only to <br />the runner are not acceptable. Provide additional <br />supports when light fixtures are 8 feet or longer. <br />Pendant Mounted Light Fixtures: Support pendant <br />mounted light fixtures directly from the structure <br />wabove with hanger wires or cables passing through <br />each pendant hanger and capable of supporting (4) <br />times the weight of the fixture. A bracing assembly is <br />required where the pendant hanger penetrates the <br />ceiling. <br />Free Wall: at the perimeter of the ceiling area where main or <br />cross runners are not connected to the adjacent wall, provide <br />interconnection between the runners at the free end to prevent <br />lateral spreading. A metal strut or a #16 ga. wire with a <br />mechanical connection to the runner may be used. Where the <br />perpendicular distance fromt he wall to the first parallel runner <br />is 12" or less, this interlock is not requried. <br />Seismic Bracing: Provide bracing assemblies consisting of a <br />compression strut and (4) #12 ga. splayed bracing wires <br />oriented 90 degress from each other at 12' x 12' on center, 6' <br />maximum from each perimeter wall and at the edge of vertical <br />ceiling offsets. Ceiling areas of 144 SF. or less, surrounded by <br />walls which connect directly to the structure above, do not <br />require bracing assemblies when attached to two adjacent <br />walls. <br />Fastening: Fasten hanger wires with not less than (3) tight <br />turns. Fasten bracing wires with (4) tight turns. Make all tight <br />turns within a distance of 1 1/2". Hanger or bracing wire <br />anchors to the structure should be installed i nsuch a manner <br />that the direction of the anchor aligns as closely as possible <br />with the direction of the wire. <br />Separation: Separate all ceilign hanger and bracing wires at <br />least 6: from all unbraced ducts, pipes, conduit, etc., <br />Field Tests: Whe drilled-in concrete anchors or shot-in <br />anchors are used in reinforced concrete for hanger wires, 1 <br />out of 10 must be field tested for 200 lbs. in tension. When <br />drilled-in anchors are used for bracing wires, 1 out of 2 must <br />be field tested for 400 lbs. in tension. Shot-in anchors for <br />concrete are not permited for bracing wires. <br />Hanger Wires: #12 ga. wires may be used for up to and including 4 ft. by 4 ft. <br />grid spacing and shall be attached to main runners. <br />Perimeter: Provide #12 ga. hanger wires at the ends of all main and cross <br />runners within 8" of the support or within 1/4 th of the length of the end tee, <br />whichever is least, for the perimeter of the ceiling area. <br />Obstructions: Provide trapeze or other supplementary support members at <br />ovstructions to gypical hanger spacing. Provide additional hangers, or braces as <br />requried at all ceiling breakes, soffits or discontinuous areas. Hanger wires that <br />are more than 1 in 6 out of plumb are to have counter-sloping wires. <br />Wall Attachment: Ceiling grid members may be attached to not more than 2 <br />adjacent walls. Ceiling grid members shall be at least 1/2" clear of other walls. If <br />walls run diagonally to ceiling grid system runenrs, one end of main and cross <br />members should be free, and a minimum of 1/2" clear of wall. <br />WHERE THE DISTANCE BETWEEN THE CEILING GRID <br />AND THE SLAB ABOVE IS LESS THAN 8'-0": PROVIDE <br />3-5/8" (25 GA.) METAL STUD. ATTACH TO MAIN <br />RUNNERS WITH 2" OF FROSS RUNNER WITH (2) #12 <br />SELF-DRILLING, SELF-TAPPING SCREWS AND TO <br />CONCRETE/ STEEL STRUCTURE WITH 3/16" DIA. <br />ANCHOR. <br />IF DISTANCE BETWEEN CEILNIG GRID AND SLAB <br />ABOVE IS 8'-0" OR GREATER: USE THE SCHEDULE <br />BELOW FOR STUD SIZES: <br />METAL STUDS ORIENTED AS SHOWN, CONNECTED EVERY <br />12" ALONG THEIR LENGTH <br />COMPRESSION STRUT AT 12' O.C. BOTH <br />DIRECTIONS <br />12" GA. HANGER WIRES AT 48" O.C. ALONG MAIN <br />TEE RUNNERS <br />(4) 12 GA. SPLAYED SEISMIC BRACING <br />WIRES AT 12' O.C. BOTH DIRECTIONS <br />. <br />45 DEGREE MAX. <br />MAIN TEE RUNNER <br />2" MAX. <br />CROSS TEE RUNNER <br />AT STEEL BEAM <br />VERTICAL <br />HANGER <br />AT CONCRETE <br />SPLAYED SEISMIC <br />BRACING <br />AT CONCRETE <br />STEEL BEAM <br />(SEE TYPICAL NOTES) <br />#9 VERTICAL HANGER <br />WIRE (200# TEST) w/ (3) <br />TIGHT TURNS MIN. <br />WOOD JOIST/BEAM <br />CEILING CLIP, 13GA. x 3/4" <br />MIN. - HILTI CC-27 <br />(ESR-2184) OR EQUAL <br />1/4"" DIA. THREADED WOOD <br />SCREW w/ 1 1/4" MIN. <br />EMBEDMENT <br />45°#12 SPLAYED SEISMIC <br />WIRE (440# TEST) w/ (4) <br />TIGHT TURNS MIN. <br />STEEL STRAP, 1" WIDE x <br />2" LONG x 12GA. MIN. <br />WOOD JOIST/ BEAM <br />1/4" DIA. THREADED WOOD <br />SCREW w/ 1 1/4" MIN. <br />EMBEDMENT <br />5/8" MAX. <br />5/8" MAX. <br />B CARPET TO CERAMIC TILE <br />CARPET TO RESILIENTA <br />CARPET <br />ALUM. TRANSITION STRIP <br />VCT OR SHEET VINYL <br />CONCRETE FLOOR <br />SLAB W/ CLEAR SEALER <br />D VCT TO CONCRETE <br />VCT TO CERAMIC TILEC <br />1/ <br />4 <br />" <br />1/ <br />2 <br />" <br /> <br />M <br />A <br />X <br />. <br />VCT <br />THREASHOLD <br />CERAMIC TILE <br />CONCRETE FLOOR <br />SLAB W/ CLEAR <br />SEALER <br />CARPET CLEAR ANODIZED ALUMINUM <br />STRIP, SECURE TO SLAB <br />CERAMIC TILE <br />CLEAVAGE <br />MEMBRANE OVER <br />CONC. SLAB <br />EPOXY GROUT, TAPER <br />UP TO MEET CERAMIC <br />TILE FINISH (IF <br />REQUIRED) <br />1/ <br />2 <br />" <br /> <br />M <br />A <br />X <br />. <br />1/ <br />2 <br />" <br /> <br />M <br />A <br />X <br />. <br />THRESHOLD VCT <br />CONC. FLOOR <br />SLAB W/ CLEAR <br />SEALER <br />METAL STUD FRAMING. <br />SEE PARTITION PLAN <br />5/8" TYPE 'X' GYP. BOARD <br />SEMI-RECESSED FIRE EXTINGUISHER CABINET- <br />SEE PARTITION PLAN LEGEND FOR SPEC. SEE <br />PARTITION PLAN FOR LOCATIONS. CABINET <br />FINISH TO BE PAINTED TO MATCH ADJACENT <br />SURFACE, UNO. <br />FACE OF WALL BEYOND <br />5/8" TYPE 'X' GYP. BOARDA. <br />F <br />. <br />F <br />. <br /> <br />T <br />O <br /> <br />K <br />N <br />O <br />B <br />. <br />40 <br />" <br /> <br />M <br />A <br />X <br />. <br />8" <br /> <br />M <br />I <br />N <br />. <br />EXISTING CONC. WALL PANEL <br />CONT. SEALANT BEAD <br />TWO PIECE GALV. MTL. REGLET <br />CAP SHEET <br />FLASHING SHEETS <br />CANT <br />BUILT-UP ROOFING <br />1/4" DENS DECK PROTECTION BOARD <br />6" POLYISOCYANURATE RIGID <br />INSULATION BOARDS (R-30 MIN.) <br />EXISTING ROOF SUBSTRATE <br />1. ASPHALT AND MBR UTILITY CEMENT NOT SHOWN FOR CLARITY <br />2. LEAD FLASHING SHALL BE 2.5 LBS. PER SQUARE FOOT MINIMUM. <br />3. IT IS ACCEPTABLE TO RUN FIELD MEMBRANE PLY THROUGH DRAIN CENTER AND OMIT <br />TARGET SHEET IF DRAIN SUMP IS SHALLOW ENOUGH TO ALLOW INSTALLATION WITHOUT <br />WRINKLES OR FISHMOUTHS. STEEP SUMPS WILL REQUIRE THE INSTALLATION OF A TARGET <br />PATCH WITHIN DRAINSUMP. <br />4. USE ASPHALT PRIMER ON LEAD FLANGES WHEN USING MBR UTILITY CEMENT. USE <br />PERMAFLASH PRIMER ON LEAD FLANGES WHEN USING MBR FLASHING CEMENT. <br />5. EXTEND ALL PLIES TO EDGE OF DRAIN BOWL. NO SEAMS ARE ALLOWED THROUGH THE DRAIN. <br />SHEET LEAD, MIN. 30" x 30" PRIME <br />LEAD WITH PRIMER ON BOTH <br />SIDES, (SEE NOTES) ROLL LEAD <br />DOWN BOWL. (SET IN MBR UTILITY <br />CEMENT OR MBR FLASHING <br />CEMENT) <br />CLAMPING RING <br />DRAIN STRAINER <br />SUMP CORNER <br />CAP SHEET UNDER <br />CLAMPING RING <br />BACKER PLY <br />4" MIN. <br />4" MIN. <br />SMOOTH <br />SURFACE PLY <br />BELOW CAP <br />SHEET <br />INSULATION TAPERED <br />TO DRAIN <br />UNDERDECK DRAIN <br />CLAMP (AS REQUIRED) <br />LEAD SHEET <br />RIGID INSULATIONNOTES: <br />6. ANY CARPENTRY, METAL WORK, OR MASONRY CONSTRUCTION SHOULD BE DESIGNED AND <br />CONSTRUCTED IN ACCORDANCE WITH LOCAL CODE REQUIREMENTS AND/OR PROJECT <br />SPECIFICATIONS. THESE COMPONENTS SHOULD BE REVIEWED AND APPROVED BY A LICENSED <br />DESIGN PROFESSIONAL. <br />7. PLEASE SEE BITUMINOUS FLASHING SPECIFICATIONS FOR A FULL DESCRIPTION OF <br />INSTALLATION INSTRUCTIONS AND REQUIREMENTS WHICH ARE CONSIDERED A PART OF THIS <br />DETAIL. <br />CAP SHEET <br />ROOF ASSEMBLY <br />SEALANT <br />SURFACED FLASHING PLY (SEE NOTE 5.) <br />DRAWBAND <br />FLASHING COLLAR (8" TALL MIN.) <br />STORM COLLAR (INJECT POLYURETHANE <br />SEALANT BETWEEN COLLAR AND PIPE. TIGHTEN <br />DRAWBAND AND TOOL SEALANT BLEEDOUT <br />AROUND PIPE.) <br />FLASHING PLIES (INSTALL MIN. TWO (2) <br />FLASHING PLIES, AND FEATHER EACH <br />PLY 3" MIN.) <br />BITUMINOUS ROOF CEMENT OR <br />POLYUREHANE SEALANT (INSTALL <br />AT BASE OF PENETRATION.) <br />FLASHING COLLAR FLANGE (PRIME BOTH <br />SIDES OF HORIZONTAL FLANGES AND SET <br />IN BED OF BITUMOUS ROOF CEMENT ON <br />FINISHED FIELD PLIES. IF REQUIRED, NAIL <br />TO DECK APPROX 3" O.C. STAGGERED.) <br />MULTIPLE-PLY POLYMER MODIFIED <br />BITUMEN ROOFING FIELD PLIES <br />BASE SHEET (MECHANICALLY <br />ATTACH AS REQUIRED.) <br />PIPE PENETRATION <br />SECURED TO <br />STRUCTURAL FRAMING <br />FIRE SAFING INSULATION <br />REQUIRED AT HOT <br />STACK CONDITION <br />1. DIMENSIONS SHOWN ARE MINIMUMS AND ARE INTENDED TO BE APPROXIMATE TO ALLOW FOR RESONABLE <br />TOLERANCES DUE TO FIELD CONDITIONS. <br />2. THIS DETAIL IS SUITABLE FOR FLASHING ROUND PIPES USED TO SUPPORT EQUIPMENT, ELECTRICAL CONDUIT, <br />WATER AND GASE LINES, SHEET METAL FLUES, AND OTHER SIMILAR PENETRATIONS. <br />3. THE HORIZONTAL FLASHING FLANGES TO BE A MINIMUM OF 4" WIDE. <br />4. SET METAL FLASHING FLANGES ON FINISHED FIELD PLIES AND STRIP-IN BEFORE SURFACING. <br />5. SURFACED FLASHING PLY IS RECOMMENDED TO HAVE WHITE OR OTHER LIGHT REFLECTING SURFACE TO <br />MINIMIZE HEAT GAIN AND THERMAL MOVEMENT. FOR AGGREGATE-SURFACE MEMBRANES, EXTEND AGGREGATE <br />COVERAGE TO OUTSIDE OF COLLAR. <br />ROOF ASSEMBLY <br />COUNTERFLASHING <br />SKIRT (SEE NOTE 2.) <br />3" MIN. <br />3" MIN. <br />SURFACED <br />FLASHING PLY <br />(SEE NOTE 3.) <br />SHEET METAL <br />COUNTERFLASHING <br />GASKETED SCREW <br />FASTENERS <br />BASE FLASHING MEMBRANE <br />(EXTEND TO TOP OF CURB AND <br />FASTEN 6" O.C. EXTEND ONTO <br />ROOF SURFACE BEYOND TOE <br />OF CANT.) <br />MULTIPLE-PLY POLYMER MODIFIED <br />BITUMEN ROOFING (OPTION: FIELD <br />PLIES MAY BE EXTENDED OR <br />FEATHERED ABOVE HEAD OF CANT.) <br />BASE SHEET <br />(MECHANICALLY ATTACH <br />AS REQUIRED.) <br />FIBER CANT STRIP (SET FIBER <br />CANT IN HOT ASPHALT OR <br />BITUMOUS ROOF CEMENT <br />OVER BASE SHEET.) <br />PRE-FABRICATED 18 GA. GALV. <br />EQUIPMENT CURB 8" HIGH MIN. <br />W/ FACTORY WOOD NAILER AT <br />TOP, PRESERVATIVE TREATED, <br />AND RIGID INSULATION <br />NOTES: <br />1. DIMENSIONS SHOWN ARE MINIMUMS AND ARE INTENDED TO BE <br />APPROXIMATE AND TO ALLOW FOR REASONABLE TOLERANCES DUE TO <br />FIELD CONDITIONS. <br />2. COUNTERFLASHING SKIRT IS RECOMMENDED WHEN PRE- <br />MANUFACTGURED FLASHING FLANGE EXTENDS LESS THAN 2" OVER <br />MEMBRANE BASE FLASHING, OR WHEN BASE FLASHING FASTENERS ARE <br />EXPOSED. <br />3. SURFACED FLASHING PLY IS RECOMMENDED TO HAVE WHITE OR OTHER <br />LIGHT REFLECTING SURFACE TO MINIMIZE HEAT GAIN AND THERMAL <br />MOVEMENT. <br />DETAIL VIEW <br />Approx. <br />6" O.C. <br />ROOF DECK <br />SHEET METAL CAP <br />3" MIN.3" MIN. <br />SURFACED FLASHING PLY <br />(SEE NOTE 4.) <br />MEMBRANE BASE <br />FLASHING (FASTEN TO <br />TOP OF CURB AT <br />APPROX. 6" O.C. EXTEND <br />ONTO FIELD OF ROOF <br />BEYOND TOE OF CANT.) <br />MULTIPLE-PLY POLYMER MODIFIED BITUMEN <br />ROOFING (OPTION: FIELD PLIES MAY BE <br />EXTENDED OR FEATHERED ABOVE HEAD OF <br />CANT.) <br />BASE SHEET (MECHANICALLY <br />ATTACH AS REQUIRED.) <br />FIBER CANT, SET CANT OVER <br />BASE SHEET IN HOT ASPHALT <br />OR BITUMOUS ROOF CEMENT <br />WOOD CURB (EXTEND 8" <br />MIN. ABOVE FINISHED ROOF <br />SURFACE. PRESERVATIVE <br />TREATMENT OPTIONAL.) <br />Notes: <br />1. DIMENSIONS SHOWN ARE MINIMUMS AND ARE INTENDED TO BE APPROXIMATE TO <br />ALLOW FOR REASONABLE TOLERANCES DUE TO FIELD CONDITIONS. <br />2. ATTACH TOP OF MEMBRANE BASE FLASHING APPROXIMATELY 6" O.C. <br />3. SURFACE FLASHING PLY IS RECOMMENDED TO HAVE WHITE OR OTHER LIGHT <br />REFLECTING SURFACE TO MINIMIZE HEAT GAIN AND THERMAL MOVEMENT. <br />HIGH-DOMED CAPPED, GASKETED SELF- <br />TAPPING SCREW (FASTEN AT <br />APPROXIMATELY 18" O.C.)MEMBRANE BASE <br />FLASHING (LAP AT TOP <br />FOR DOUBLE LAYER.) <br />HHENDY.COM <br />T (949) 851-3080 <br />4770 Campus Dr., Suite 100 <br />Newport Beach, CA 92660 <br />H ndy <br />ISSUES AND REVISIONS <br />JOB NUMBER <br />SCALE <br />PROJECT <br />TEAM <br />All specifications, drawings, concepts, designs, arrangements, intellectual and written material represented herein constitute <br />unique and unpublished work of H. Hendy Associates and may not be copied, used by or disclosed to others without written <br />consent of H. Hendy Associates. <br /> 2023 H.HendyAssociatesc <br />DATE <br />As indicated <br />04463.0000.24 <br />3080 S. HARBOR BLVD. <br />SANTA ANA, CA 92704 <br />DETAILS <br />IA-7.1 <br />MCGUFF <br />AB/CD <br />SCALE <br />3" = 1'-0"2PERIMETER TRIM <br />SCALE <br />12" = 1'-0"3ACCOUSTICAL CEILING SUSPENSION SYSTEM <br />SCALE <br />3" = 1'-0"4SUSPENDED CEILING ATTACHMENT POINTS <br />SCALE <br />6" = 1'-0"9FLOORING TRANSITIONS <br />SCALE <br />1 1/2" = 1'-0"10FIRE EXTINGUISHER CABINET <br />SCALE <br />1 1/2" = 1'-0"16ROOF AT PARAPET <br />SCALE <br />1 1/2" = 1'-0"14ROOF AT DRAIN <br />SCALE <br />3" = 1'-0"13B.U.R. PIPE PENETRATION <br />SCALE <br />3" = 1'-0"19CURB FLASHING <br />SCALE <br />1 1/2" = 1'-0"17SLEEPER FLASHING <br />NO. DESCRIPTION DATE <br />PLAN CHECK SUBMITTAL 3/17/25