1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS, PROJECT BOUNDARIES AND EXISTING CONDITIONS AT THE SITE
<br />PRIOR TO COMMENCEMENT OF WORK AND IMMEDIATELY NOTIFY STRUCTURAL ENGINEER OF RECORD (SEOR) AND
<br />ARCHITECT OF RECORD (AOR) OF ANY DISCREPANCY. THE CONTRACTOR SHALL CHECK DETAILS AND
<br />DIMENSIONS SHOWN ON THE STRUCTURAL DRAWINGS WITH RE LATED REQUIREMENTS ON OTHER CONTRACT
<br />DOCUMENTS.
<br />
<br />2. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE STRUCTURAL ENGINEER OF RECORD (SEOR) OF ANY
<br />CONFLICTS BETWEEN THE STRUCTURAL DRAWINGS AND OTHER CONSTRUCTION DOCUMENTS OR EXISTING
<br />CONDITIONS NOT SHOWN OR DIFFERENT THAN THOSE SHOWN ON CONTRACT DOCUMENT PRIOR TO
<br />COMMENCEMENT OF WORK. THE CONTRACTOR SHALL NOT ORDER MATERIAL, FABRICATE ELEMENTS, OR
<br />CONSTRUCT ANY PORTION OF STRUCTURE THAT IS IN CONFLICT UNTIL RESOLUTION IS MADE. IN THE EVENT OF
<br />CONFLICTS, INCONSISTENCIES AND DISCREPANCIES BETWEEN OR AMONG THE CONTRACT DOCUMENTS THE
<br />AOR/SEOR DECIDE WHICH OF THE CONFLICTING REQUIREMENTS WILL GOVERN BASED UPON THE MOST
<br />STRINGENT OF THE REQUIREMENTS. THE CONTRACTOR SHALL PERFORM THE WORK CONSISTENT WITH THE
<br />AOR/SEOR'S DECISION WITHOUT ADJUSTMENT OF THE CONTRACT SUM OR CONTRACT TIME.
<br />3. ALL DIMENSIONS ON STRUCTURAL DRAWINGS SHALL BE CHECKED BY CONTRACTOR AGAINST ARCHITECTURAL
<br />DIMENSIONS. WHERE DIMENSIONS ARE UNCLEAR OR OMITTED, REQUEST CLARIFICATION FROM THE STRUCTURAL
<br />ENGINEER OF RECORD (SEOR) AND ARCHITECT OF RECORD (AOR). DO NOT SCALE DRAWINGS. UNLESS NOTED
<br />OTHERWISE, PLAN DIMENSIONS INDICATE CENTERLINE OF BEAMS AND COLUMNS. LIGHT-FRAMED WALLS ARE
<br />DIMENSIONED TO FACE OF STUDS, AND FOOTINGS ARE CENTERED UNDER THE ELEMENTS THEY SUPPORT.
<br />ALL DIMENSIONS RELATED TO EXISTING CONDITIONS SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO
<br />START OF WORK.
<br />4. SEE ARCHITECTURAL DRAWINGS FOR SIZE AND LOCATION OF DOOR AND WINDOW OPENINGS IN STRUCTURAL
<br />WALLS; SIZE AND LOCATION OF FLOOR AND ROOF OPENINGS AND SLAB EDGES; SIZE AND LOCATION OF NON-
<br />BEARING WALLS AND OPENINGS; SIZE AND LOCATION OF CONCRETE CURBS, SLOPES, DEPRESSIONS, DRAINS,
<br />NON-STRUCTURAL PARTITIONS, CHANGES IN LEVEL, CHAMFERS AND REVEALS, INSERTS FOR FINISH SYSTEMS;
<br />EXTERIOR WALL FINISHES; STAIR SIZE, LOCATION, FRAMING AND DETAILS, UNLESS DETAILED ON STRUCTURAL
<br />DRAWINGS; DIMENSIONS NOT SHOWN ON STRUCTURAL DRAWINGS.
<br />5. PROJECT SPECIFICATIONS SHALL BE A PART OF THE CONTRACT DOCUMENTS. WHERE DISCREPANCIES OCCUR
<br />BETWEEN GENERAL NOTES, PLANS, DETAILS AND SPECIFICATIONS, THE MOST STRINGENT REQUIREMENTS SHALL
<br />GOVERN. SPECIFIC NOTES AND DETAILS ON DRAWINGS GOVERN OVER GENERAL NOTES AND TYPICAL DETAILS.
<br />NOTIFY THE ARCHITECT OF RECORD (AOR) AND STRUCTURAL ENGINEER OF RECORD (SEOR) IMMEDIATELY WHERE
<br />CONFLICT OCCURS BETWEEN DRAWINGS AND SPECIFICATIONS. AOR/SEOR DECIDE WHICH OF THE CONFLICTING
<br />REQUIREMENTS WILL GOVERN BASED UPON THE MOST STRINGENT OF THE REQUIREMENTS.
<br />6. REFER TO THE TYPICAL DETAIL SHEETS FOR TYPICAL CONS TRUCTION DETAILS. TYPICAL DETAILS APPLY TO ALL
<br />CONSTRUCTION DOCUMENTS AND MAY NOT BE SPECIFICALLY REFERENCED THEREIN. UNLESS SPECIFICALLY
<br />NOTED OR SHOWN OTHERWISE, CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING THESE TYPICAL DETAILS PRIOR
<br />TO COMMENCEMENT OF WORK. WHERE CONDITIONS REQUIRE M ODIFICATIONS OF A TYPICAL DETAIL, THE
<br />CONTRACTOR SHALL SUBMIT MODIFIED DETAIL FOR APPROVAL BY THE STRUCTURAL ENGINEER OF RECORD
<br />(SEOR) PRIOR TO FABRICATION AND INSTALLATION. DETAIL OF CONSTRUCTION NOT SHOWN SHALL BE OF SAME
<br />NATURE AS THOSE SHOWN FOR SIMILAR CONSTRUCTION.
<br />7. SCHEDULE CONSTRUCTION OPERATIONS IN SEQUENCE REQUIRED TO OBTAIN THE BEST RESULTS, WHERE
<br />INSTALLATION OF ONE PART OF THE WORK DEPENDS ON INSTALLATION OF OTHER COMPONENTS, BEFORE OR
<br />AFTER ITS OWN INSTALLATION. COORDINATE INSTALLATION OF DIFFERENT COMPONENTS TO ENSURE MAXIMUM
<br />PERFORMANCE AND ACCESSIBILITY FOR REQUIRED MAINTENANCE, SERVICE, AND REPAIR.
<br />
<br />8. THESE DOCUMENTS SHALL NOT BE CONSTRUED AS STAND-ALONE DOCUMENTS. CONTRACTOR SHALL
<br />COORDINATE WITH ALL OTHER CONSULTANTS' WORK.
<br />9. MODIFICATIONS AND SUBSTITUTION REQUESTS FOR MATERIALS SPECIFIED ON STRUCTURAL DRAWINGS MUST BE
<br />ACCEPTED IN WRITING BY STRUCTURAL ENGINEER OF RECORD (SEOR) PRIOR TO COMMENCEMENT OF WORK.
<br />CURRENT EVALUATION REPORTS AND PRODUCT INFORMATION SHALL BE PROVIDED TO THE STRUCTURAL
<br />ENGINEER DEMONSTRATING ADEQUACY OF THE REQUIRED CAPACITY AND PERFORMANCE OF THE MATERIAL TO
<br />BE SUBSTITUTED. ARCHITECT OF RECORD (AOR) AND STRUCTURAL ENGINEER OF RECORD (SEOR), AT THEIR
<br />DISCRETION, MAKE DETERMINATION AS TO WHETHER OR NOT THE PROPOSED CONTRACTOR'S MODIFICATIONS
<br />AND/OR SUBSTITUTIONS IS ACCEPTABLE.
<br />10. CONTRACT DOCUMENTS REPRESENT THE FINISHED STRUCTURE AND DO NOT INDICATE THE MEANS AND
<br />METHODS OF CONSTRUCTION OR NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. THE CONTRACTOR IS
<br />SOLELY RESPONSIBLE FOR THE DESIGN OF TEMPORARY ERECTION AIDS, FORMWORK, SCAFFOLDING, SAFETY
<br />MEASURES, SHORING OF ANY PORTION OF WORK DUE TO CONSTRUCTION EQUIPMENT, MACHINERY AND
<br />MATERIALS, AND PROTECTION OF ADJACENT PROPERTIES. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE
<br />WORK AND SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION MEANS AND METHODS, TECHNIQUES, SEQUENCES
<br />AND PROCEDURES. VISITS TO THE SITE BY THE STRUCTURAL ENGINEER OF RECORD (SEOR) AND ARCHITECT OF
<br />RECORD (AOR) SHALL NOT CONSTITUTE ACCEPTANCE OF CONSTRUCTION MEANS AND METHODS AND DO NOT IN
<br />ANY WAY RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITIES FOR THE ABOVE. CONSTRUCTION MATERIALS AND
<br />ERECTION LOADS SHALL BE DISTRIBUTED WHEN PLACED ON THE STRUCTURE SUCH THAT THEY DO NOT EXCEED
<br />DESIGN LIVE LOADS OR RESULT IN AN UNBALANCED LOADING CONDITION. CONSTRUCTION LOADS ON ELEVATED
<br />SLABS SHALL NOT RESULT IN EXCESSIVE SHORT-TERM OR LONG-TERM DEFLECTIONS.
<br />
<br />11. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COMPLY WITH THE PERTINENT SECTIONS OF THE LATEST EDITION
<br />OF THE "CONSTRUCTION SAFETY ORDERS" ISSUED BY THE STATE OF CALIFORNIA, AND ALL OCCUPATIONAL
<br />SAFETY AND HEALTH ADMINISTRATION (OSHA) REQUIREMENTS AS THEY APPLY TO THE PROJECT. THE
<br />STRUCTURAL ENGINEER OF RECORD (SEOR) AND THE OWNER SHALL NOT BE HELD RESPONSIBLE FOR THE
<br />CONTRACTOR'S FAILURE TO COMPLY WITH THESE REQUIREMENTS.
<br />12. ALL STRUCTURAL FRAMING SHALL BE ERECTED PLUMB AND TRUE TO LINE. TEMPORARY BRACING, AS REQUIRED,
<br />SHALL BE INSTALLED AND LEFT IN PLACE UNTIL ADEQUATE PORTION OF THE STRUCTURE IS CONSTRUCTED FOR
<br />STABILITY.
<br />13. MAXIMUM PERMANENT EQUIPMENT WEIGHTS, POSTED LOAD LIMITS OR OTHER RESTRICTIONS NOTED ON THE
<br />STRUCTURAL DRAWINGS SHALL NOT BE EXCEEDED WITHOUT PRIOR WRITTEN APPROVAL BY THE STRUCTURAL
<br />ENGINEER OF RECORD (SEOR). UNLESS SPECIFICALLY STATED, THE STRUCTURE IS NOT DESIGNED TO SUPPORT
<br />TRAFFIC FROM FORK LIFTS, CRANES OR OTHER HEAVY CONSTRUCTION VEHICLES. ADEQUACY OF THE
<br />STRUCTURE TO SUPPORT TEMPORARY LOADS DURING CONSTRUCTION SHALL BE VERIFIED BY A LICENSED
<br />SHORING ENGINEER RETAINED BY CONTRACTOR. SHORING SYSTEM SHALL BE DESIGNED AS A COMPLETE SYSTEM
<br />THAT INCLUDES BUT NOT LIMITED TO GRAVITY LOADS AND LATERAL LOADS.
<br />14. THESE DRAWINGS SHALL NOT BE USED FOR CONSTRUCTION IF THE STRUCTURAL ENGINEER'S SEAL AND
<br />SIGNATURE IS NOT AFFIXED TO THESE DRAWINGS.
<br />15. CONTRACTOR SHALL ESTABLISH AND VERIFY SIZE AND LOCATION OF ALL OPENINGS AND INSERTS BY ALL TRADES
<br />PRIOR TO SUBMITTAL OF SHOP DRAWINGS AND CONSTRUCTION. PENETRATION THROUGH SLABS AND WALLS
<br />SHALL BE IDENTIFIED BY CONTRACTOR AND SUBMITTED TO STRUCTURAL ENGINEER OF RECORD (SEOR) FOR
<br />REVIEW AND APPROVAL PRIOR TO PLACEMENT OF CONCRETE OR CMU. CORE DRILLING SHALL ONLY BE
<br />PERMITTED WHERE AUTHORIZED IN WRITING BY SEOR PRIOR TO PROCEEDING WITH THE WORK. CORE DRILLS
<br />SHALL NOT CUT ANY REINFORCING, UNLESS PERMITTED BY SEOR IN WRITING. INSPECTOR OF RECORD (IOR)
<br />SHALL BE PRESENT DURING CORE DRILLING FOR VERIFICATION. THE IOR IS TO DOCUMENT CORES EXAMINED
<br />INDICATING AN ABSENCE OF REINFORCING.
<br />16. STRUCTURAL DRAWINGS INDICATE THE APPROXIMATE LOCATION OF EQUIPMENTS AND THEIR SECONDARY
<br />FRAMING SUPPORTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WORK BETWEEN
<br />SUBCONTRACTORS. IN ORDER TO PROVIDE NECESSARY DIMENSIONS IN A TIMELY MANNER TO ALL PARTIES
<br />INVOLVED. SECONDARY FRAMING SUPPORTING EQUIPMENTS SHALL BE PER TYPICAL DETAILS UNLESS
<br />SPECIFICALLY NOTED OTHERWISE ON PLANS.
<br />17. SEE MECHANICAL, ELECTRICAL, AND PLUMBING (MEP) DRAWINGS FOR SIZE AND LOCATION OF EQUIPMENT PADS,
<br />EQUIPMENT ANCHORAGE TO STRUCTURE, AND EQUIPMENT WEIGHTS; ANCHORAGE AND SEISMIC BRACING OF
<br />DUCTWORK, PIPING, ELECTRICAL CONDUITS TO STRUCTURE; ELECTRICAL CONDUIT RUNS, OUTLETS AND BOXES IN
<br />CONCRETE SLABS AND WALLS; PIPE SLEEVES, TRENCHES, OPENINGS THROUGH WALLS AND SLABS FOR
<br />DUCTWORK, PIPE RUNS, AND ELECTRICAL CONDUIT RUNS.
<br />18. MAKE ALLOWANCE FOR SHIM SPACE AT HEADERS AND JAMBS TO ALLOW FOR SETTLEMENT, DEFELCTION, AND
<br />MOVEMENT OF FRAMING. INSTALL WINDOWS, DOORS AND OTHER INSET ITEMS IN WALLS AFTER BUILDING LOADS
<br />ARE FULLY APPLIED.
<br />19. STRUCTURAL JOINT DIMENSIONS SHOWN ON STRUCTURAL DRAWINGS (EXPANSION, SEISMIC, SEPARATION, ETC)
<br />INDICATE THE MINIMUM CLEAR DISTANCE REQUIRED STRUCTURALLY. REFER TO ARCHITECTURAL DRAWINGS FOR
<br />ADDITIONAL REQUIREMENTS AND INFORMATION. ALL PIPES, DUCTS, CONDUIT, ETC., CROSSING SUCH JOINTS
<br />SHALL HAVE FLEXIBLE LINES WITH ADEQUATE RANGE OF MOTION.
<br />20. REFER TO THE PROJECT SPECIFICATIONS FOR SHOP DRAWING REQUIREMENTS AND SUBMITTALS. SHOP
<br />DRAWINGS SHALL BE SUBMITTED TO THE STRUCTURAL ENGINEER OF RECORD (SEOR) PRIOR TO FABRICATION.
<br />ALLOW FOR A REVIEW DURATION OF MINIMUM 10 BUSINESS DAYS. SUBMITTALS SHALL CONSIST OF EITHER
<br />ELECTRONIC FILES OR TWO HARD COPIES (ONE SET TO BE KEPT BY THE STRUCTURAL ENGINEER OF RECORD AND
<br />ONE REPRODUCIBLE SET TO BE RETURNED TO CONTRACTOR).
<br />1. GOVERNING CODE:
<br />ALL WORK SHALL BE IN CONFORMANCE WITH THE 2022 CALIFORNIA BUILDING CODE (CBC 2022), INCLUDING ALL
<br />AMENDMENTS AND SUPPLEMENTS BY GOVERNING CODE AUTHORITY, AND OTHER CODES AND STANDARDS
<br />REFERENCED IN THE CONTRACT DOCUMENTS. ALL CODES AND STANDARDS REFERENCED IN CONTRACT
<br />DOCUMENTS SHALL BE THE LATEST EDITION AS NOTED BY CBC 2022, CHAPTER 35, UNO.
<br />2. GOVERNING CODE AUTHORITY:
<br />CITY OF SANTA ANA -BUILDING AND SAFETY DIVISION.
<br />3. GRAVITY DESIGN LOADS:
<br />ROOF LIVE LOAD.................................................................................................................................................................20 PSF
<br />4. WIND DESIGN DATA:
<br />BASIC DESIGN WIND SPEED...........................................................................................................................................95 MPH
<br />WIND EXPOSURE.........................................................................................................................................................................C
<br />RISK CATEGORY..........................................................................................................................................................................II
<br />BUILDING ENCLOSURE.........................................................................................................................PARTIALLY ENCLOSED
<br />INTERNAL PRESSURE COEFFICIENT.................................................................................................................................+0.18
<br />5. EARTHQUAKE DESIGN DATA:
<br />SITE LATITUDE...........................................................................................................................................................33.706123 N
<br />SITE LONGITUDE...................................................................................................................................................-117.920384 W
<br />RISK CATEGORY...........................................................................................................................................................................II
<br />SEISMIC IMPORTANCE FACTOR, Ie.......................................................................................................................................1.00
<br />SITE CLASS...................................................................................................................................................................................D
<br />SHORT-PERIOD SITE COEFFICIENT, Fa.................................................................................................................................1.2
<br />LONG-PERIOD SITE COEFFICIENT, Fv................................................................................................................................1.833
<br />SITE-SPECIFIC SPECTRAL RESPONSE ACCELERATION, Ss......................................................................................1.315 g
<br />SITE-SPECIFIC SPECTRAL RESPONSE ACCELERATION, S1.......................................................................................0.472 g
<br />DESIGN SPECTRAL RESPONSE ACCELERATION, SDS.................................................................................................1.052 g
<br />DESIGN SPECTRAL RESPONSE ACCELERATION, SD1.................................................................................................0.577 g
<br />SEISMIC DESIGN CATEGORY....................................................................................................................................................D
<br />SEISMIC BASE......................................................................................................................GROUND LEVEL (DATUM EL 41.2)
<br />6. SEISMIC FORCE-RESISTING SYSTEM (SFRS):
<br />NON-STRUCTURAL ELEMENTS
<br />21.REVIEW OF SHOP DRAWINGS AND SUBMITTALS BY THE ARCHITECT OF RECORD (AOR) AND STRUCTURAL
<br />ENGINEER OF RECORD (SEOR) IS FOR GENERAL COMPLIANCE WITH THE CONTRACT DOCUMENTS AND DOES NOT
<br />CONSTITUTE AUTHORIZATION TO DEVIATE FROM TERMS AND CONDITIONS OF THE CONTRACT. THE CONTRACTOR
<br />WILL REMAIN RESPONSIBLE FOR ALL ERRORS IN DETAILING, FABRICATION, AND FOR CORRECT FITTING OF ALL
<br />STRUCTURAL MEMBERS, INCLUDING COORDINATION WITH OTHER TRADES.
<br />22. SHOP DRAWINGS AND SUBMITTALS DO NOT CONSTITUTE CHANGE ORDERS. ANY PROPOSED CHANGES TO THE
<br />STRUCTURAL DOCUMENTS MUST BE SUBMITTED IN WRITING AS A REQUEST FOR SUBSTITUTION TO THE
<br />ARCHITECT AND SEOR FOR APPROVAL.
<br />23. PREPARE TO-SCALE PROJECT-SPECIFIC SHOP DRAWINGS. SHOP DRAWINGS SHALL BE INDEPENDENTLY
<br />PRODUCED BY THE CONTRACTOR AND SHALL NOT BE A COPY OR REPRODUCTION OF THE CONTRACT
<br />DOCUMENTS.
<br />24. ALL WORK IS NEW UNLESS INDICATED AS EXISTING (E).
<br />25. IN AN EXISTING STRUCTURE WHERE MODIFICATIONS TO AN EXISTING LOAD-BEARING WALL IS REQUIRED,
<br />PROVIDE TEMPORARY BRACING/SHORING UNTIL NEW LOAD-BEARING WALL CONSTRUCTION IS COMPLETED AND
<br />LOAD PATH IS RESTORED.
<br />GENERAL REQUIREMENTS GENERAL REQUIREMENTS (CONTINUED)
<br />STRUCTURAL DESIGN CRITERIA
<br />1. REVIEW OF SHOP DRAWINGS AND SUBMITTALS BY THE AOR AND SEOR IS FOR GENERAL COMPLIANCE WITH THE
<br />CONTRACT DOCUMENTS.
<br />2. SHOP DRAWINGS SHALL BE SUBMITTED TO THE SEOR FOR REVIEW PRIOR TO FABRICATION. THE CONTRACTOR
<br />WILL REMAIN RESPONSIBLE FOR ALL ERRORS OF DETAILING, FABRICATION, AND FOR CORRECT FITTING OF ALL
<br />STRUCTURAL MEMBERS INCLUDING COORDINATION WITH OTHER TRADES.
<br />3. SHOP DRAWINGS SHALL BE SUBMITTED TO THE SEOR (ALLOW FOR A REVIEW DURATION OF 10 BUSINESS DAYS),
<br />AND SHALL CONSIST OF EITHER ELECTRONIC FILES OR ONLY ONE SET FOR OUR RECORDS AND ONE
<br />REPRODUCIBLE SET.
<br />4. SEOR WILL RETURN THE ELECTRONIC FILES OR REPRODUCIBLE SET CLEARLY MARKED WITH COMMENTS. ANY
<br />REQUIRED RECORD SET COPIES SHALL BE MADE FROM THIS RETURNED SET.
<br />5. REPRODUCTION OF STRUCTURAL PLANS & DETAILS FOR SHOP DRAWINGS IS PROHIBITED.
<br />SUBCONTRACTOR/FABRICATOR IS TO PROVIDE INDEPENDENTLY CREATED DRAWINGS BASED ON THE
<br />STRUCTURAL PLANS AND DETAILS.
<br />6. SHOP DRAWINGS AND SUBMITTALS DO NOT CONSTITUTE CHANGE ORDERS. ANY PROPOSED CHANGES TO THE
<br />STRUCTURAL DOCUMENTS MUST BE SUBMITTED IN WRITING AS A REQUEST FOR SUBSTITUTION TO THE
<br />ARCHITECT AND SEOR FOR APPROVAL.
<br />7. EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OF A MAIN WIND OR SEISMIC FORCE-RESISTING
<br />SYSTEM, DESIGNATED SEISMIC SYSTEM OR A WIND-OR SEISMIC-RESISTING COMPONENT LISTED IN THE
<br />STATEMENT OF SPECIAL INSPECTIONS SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE
<br />BUILDING OFFICIAL AND THE OWNER PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR
<br />COMPONENT. THE CONTRACTOR'S STATEMENT OF RESPONSIBILITY SHALL CONTAIN ACKNOWLEDGEMENT OF
<br />AWARENESS OF THE SPECIAL REQUIREMENTS CONTAINED IN THE STATEMENT OF SPECIAL INSPECTION.
<br />8. SUBSTITUTION REQUESTS FOR MATERIALS SPECIFIED ON THE STRUCTURAL DOCUMENTS MAY BE CONSIDERED
<br />WITH MATERIALS HAVING EQUIVALENT OR GREATER CAPACITY AND PERFORMANCE. CURRENT EVALUATION
<br />REPORTS AND PRODUCT INFORMATION SHALL BE PROVIDED TO THE SEOR DEMONSTRATING EQUIVALENT
<br />QUALITIES OF THE MATERIAL TO BE SUBSTITUTED.
<br />THE FOLLOWING LIST SUMMARIZES IMPORTANT STRUCTURAL SUBMITTALS FOR THIS PROJECT.
<br />REFER TO THE SPECIFICATIONS FOR A COMPLETE LIST AND ADDITIONAL REQUIREMENTS.
<br />GENERAL
<br />•QUALIFICATION DATA FOR APPROVED INSTALLERS AND FABRICATORS
<br />•CERTIFICATES OF CONFORMANCE FOR PREFABRICATED MEMBERS
<br />CONCRETE FORMWORK
<br />•MANUFACTURER'S PRODUCT DATA AND INSTALLATION INSTRUCTIONS FOR PROPRIETARY MATERIALS
<br />INCLUDING FORM COATINGS, MANUFACTURED FORM SYSTEMS, TIES AND ACCESSORIES
<br />•SHOP DRAWINGS FOR FABRICATION AND ERECTION OF FORMWORK AND SHORING
<br />CONCRETE REINFORCEMENT
<br />•MANUFACTURER'S PRODUCT DATA, SPECIFICATIONS AND INSTALLATION PROCEDURES FOR PROPRIETARY
<br />MATERIALS AND REINFORCEMENT
<br />•STEEL PRODUCER'S CERTIFICATES OF MILL ANALYSIS, TENSILE AND BEND TESTS
<br />•SHOP DRAWINGS FOR FABRICATION, BENDING AND PLACEMENT
<br />CAST-IN-PLACE CONCRETE
<br />•DESIGN MIX FOR EACH CONCRETE MIX
<br />•MATERIAL TEST REPORTS
<br />•MATERIAL CERTIFICATES FOR CEMENT, AGGREGATES AND ADMIXTURES
<br />•MANUFACTURER'S PRODUCT DATA FOR WATERSTOPS, BONDING AGENTS, VAPOR RETARDERS, JOINT FILLER,
<br />CURING MATERIALS AND FLOOR TREATMENTS
<br />•SHOP DRAWINGS FOR PROPOSED LOCATIONS OF ADDITIONAL CONSTRUCTION OR CONTROL JOINTS NOT
<br />SHOWN
<br />ON THE STRUCTURAL PLANS
<br />•MINUTES FROM PREINSTALLATION CONFERENCE
<br />STRUCTURAL STEEL
<br />•MANUFACTURER'S MILL CERTIFICATES
<br />•MILL TEST REPORTS
<br />•SHOP DRAWINGS FOR FABRICATION AND ASSEMBLY OF MEMBERS
<br />•ERECTION PLAN SEQUENCE AND PROCEDURES
<br />•WELDING PROCEDURE SPECIFICATIONS (WPS)
<br />•TEST REPORTS FOR SHOP AND FIELD WELDED AND BOLTED CONNECTIONS
<br />COLD-FORMED METAL FRAMING
<br />•SHOP DRAWINGS INDICATING LAYOUT AND DETAILS
<br />•ENGINEERING CALCULATIONS
<br />ROUGH CARPENTRY
<br />•PRODUCT DATA FOR TREATMENTS AND PRESERVATIVES
<br />•MATERIAL CERTIFICATES FOR DIMENSION LUMBER
<br />PREFABRICATED WOOD PRODUCTS
<br />•SHOP DRAWINGS INDICATING LAYOUT & DETAILS
<br />•ENGINEERING CALCULATIONS
<br />GLUE LAMINATED BEAMS
<br />•SHOP DRAWINGS INDICATING LAYOUT
<br />•CERTIFICATE OF CONFORMANCE
<br />STRUCTURAL SUBMITTALS
<br />1. SEE "AS-BUILT" DRAWINGS FOR EXISTING BUILDING ITEMS NOT SHOWN OR NOTED.
<br />2. FIELD VERIFY ALL CONDITIONS & DIMENSIONS PRIOR TO SHOP DRAWING PRODUCTION AND FABRICATION OF
<br />STRUCTURAL ELEMENTS.
<br />3. WHERE ALL OTHER EXISTING CONDITIONS VARY SIGNIFICANTLY FROM THOSE SHOWN ON THESE DRAWINGS,
<br />THE STRUCTURAL ENGINEER SHALL BE NOTIFIED PRIOR TO CONTINUED CONSTRUCTION RELATED TO SUBJECT
<br />CONDITIONS.
<br />4. SHORE ALL EXISTING CONSTRUCTION AS REQUIRED, INCLUDING WHERE WELDING TO EXISTING STEEL FRAMING.
<br />SHORING DESIGN BY OTHERS.
<br />5. ALL EXISTING CONCRETE SURFACES TO BE IN CONTACT WITH NEW CONCRETE SHALL BE ROUGHENED TO 1/4"
<br />MINIMUM AMPLITUDE. USE ICC APPROVED BONDING AGENT ON EXISTING CONCRETE PRIOR TO PLACING NEW
<br />CONCRETE.
<br />6. VERIFY LOCATION OF EXISTING REBAR BEFORE FABRICATION USING NON-DESTRUCTIVE TESTING. EXISTING
<br />REINFORCING SHALL BE AVOIDED WHERE DRILLING FOR POST-INSTALLED ANCHORS OR CONCRETE DOWELS.
<br />7. THE GENERAL CONTRACTOR SHALL COORDINATE THE WEIGHT AND SPECIFIC LOCATION OF ALL MECHANICAL
<br />EQUIPMENT WITH THE STRUCTURAL FRAMING. IF THE EQUIPMENT DEVIATES IN WEIGHT OR LOCATION FROM
<br />THOSE INDICATED IN THE DRAWINGS, THE STRUCTURAL ENGINEER'S APPROVAL MUST BE OBTAINED PRIOR TO
<br />INSTALLATION OF THE UNITS.
<br />8. ALL EXISTING WOOD FRAMING MEMBERS SUPPORTING NEW MECHANICAL UNITS SHALL BE INSPECTED FOR
<br />DAMAGE AND DETERIORATION PRIOR TO INSTALLATION OF THE UNITS. NOTIFY THE STRUCTURAL ENGINEER IF
<br />DAMAGE OR DETERIORATION IS DISCOVERED.
<br />9. ALL EXISTING (E) WOOD ELEMENTS TO REMAIN SHALL BE FIELD INSPECTED DURING CONSTRUCTION AND
<br />TREATED FOR DRYROT REMOVAL / CONTROL. WHERE EXISTING GLUE LAMINATED TIMBER BEAMS TO REMAIN ARE
<br />FOUND TO HAVE EXTENSIVE DRYROT DEEPER THAN THE TOP TWO LAMINATIONS (3"), THE STRUCTURAL
<br />ENGINEER SHALL BE NOTIFIED PRIOR TO CONTINUED CONSTRUCTION RELATED TO SUBJECT GLUE LAMINATED
<br />TIMBER BEAMS .
<br />10. ALL EXISTING CONNECTIONS AT ELEMENTS TO BE REPLACED SHALL BE REPLACED OR RE-ATTACHED TO MATCH
<br />EXISTING CONDITIONS.
<br />11. SEE PROJECT REPORTS AND ARCHITECTURAL DRAWINGS FOR HAZARDOUS MATERIALS (LEAD, ASBESTOS, ETC.)
<br />ABATEMENT REQUIREMENTS.
<br />12. DO NOT CUT OR DAMAGE EXISTING CONCRETE OR MASONRY REINFORCEMENT EXCEPT AS CLEARLY INDICATED
<br />ON STRUCTURAL DRAWINGS. MAINTAIN AT LEAST 2 INCHES CLEAR TO EXISTING REINFORCEMENT, CONDUIT AND
<br />OTHER EMBEDDED ITEMS FROM CUTS, CORES, DRILL HOLES, SHOTPINS, ETC. IN AREAS OF WORK, MARK
<br />LOCATIONS OF SUCH ITEMS USING NONDESTRUCTIVE METHODS SUCH AS GROUND PENETRATING RADAR OR X-
<br />RAY.
<br />1. POST-INSTALLED ANCHORS INCLUDE EXPANSION ANCHORS, SCREW ANCHORS, EPOXY ANCHORS/DOWELS,
<br />AND POWDER-ACTUATED FASTENERS.
<br />2. INSTALL POST-INSTALLED ANCHORS PER MANUFACTURER'S RECOMMENDED SPECIFICATIONS.
<br />3. WHEN INSTALLING POWER-INSTALLED ANCHORS IN EXISTING NON-PRESTRESSED REINFORCED CONCRETE,
<br />USE CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE REINFORCING BARS OR OTHER EMBEDDED
<br />ITEMS SUCH AS ELECTRICAL/TELECOMMUNICATIONS CONDUIT AND GAS LINES. WHEN INSTALLING DRILL-IN
<br />ANCHORS INTO PRESTRESSED CONCRETE (PRE OR POST-TENSIONED), LOCATE TENDONS DURING
<br />INSTALLATION BY USING A NON-DESTRUCTIVE METHOD PRIOR TO INSTALLATION. EXERCISE EXTREME CARE
<br />AND CAUTION TO AVOID CUTTING OR DAMAGING THE TENDONS DURING INSTALLATION. MAINTAIN A MINIMUM
<br />CLEARANCE OF ONE INCH BETWEEN THE REINFORCEMENT AND THE DRILLED-IN ANCHOR.
<br />4. WHERE SPECIFIED ANCHOR EMBEDMENT DEPTH, SPACING OR EDGE DISTANCE CANNOT BE PROVIDED, NOTIFY
<br />THE SEOR AND IOR PRIOR TO INSTALLATION.
<br />5. PATCH ABANDONED HOLES AND SPALLS USING NON-SHRINK GROUT AND REPAIR FINISHES AS REQUIRED.
<br />ANCHORS PENETRATING THROUGH WATER PROOFING OR VAPOR MEMBRANES SHALL BE SEALED OR
<br />FLASHED.
<br />6. TESTING OF POST-INSTALLED ANCHORS IS REQUIRED UNO. TEST ANCHORS IN ACCORDANCE WITH THE
<br />PROVISIONS OF CBC 19010A.5 AND THE FOLLOWING:
<br />a. TEST 100% OF ANCHORS AT ALL STRUCTURAL APPLICATIONS UNO.
<br />b. TEST 50% OF ANCHORS AT ALL-NON-STRUCTURAL APPLICATIONS SUCH AS EQUIPMENT
<br />ANCHORAGE, UNO.
<br />c. IF ANY ANCHOR FAILS TESTING, TEST ALL ANCHORS OF THE SAME TYPE NOT PREVIOUSLY
<br />TESTED UNTIL TWENTY (20) CONSECUTIVE ANCHORS PASS, THEN RESUME INITIAL TEST
<br />FREQUENCY. IF THE ANCHORS ARE USED FOR THE SUPPORT AND BRACING OF NON-STRCTURAL
<br />COMPONENTS (PIPE, DUCT, OR CONDUIT), THE TWENTY (20) SHALL BE ONLY THOSE ANCHORS
<br />INSTALLED BY THE SAME TRADE.
<br />d. ALL POST-INSTALLED ANCHORS ARE TO BE TENSION TESTED WITH THE EXCEPTION THAT
<br />TORQUE TESTING IS ALLOWED IF THE ANCHORS ARE SPECIFICALLY DESIGNED AS TORQUE
<br />CONTROLLED.
<br />e. TENSION TESTS ACCEPTANCE: APPLY PROOF TEST LOADS TO ANCHORS WITHOUT REMOVING
<br />NUT IS POSSIBLE. IF NOT, REMOVE NUT AND INSTALL A THREADED COUPLER TO THE SAME
<br />TIGHTNESS OF THE ORIGINAL NUT USING A TORQUE WRENCH AND APPLY LOAD. ANCHORS
<br />TESTED WITH A HYDRAULIC JACK OR SPRING LOADED DEVICES SHALL MAINTAIN THE TEST LOAD
<br />FOR A MINIMUM OF 15 SECONDS AND SHALL EXHIBIT NO DISCERNIBLE MOVEMENT DURING THE
<br />TENSION TEST, E.G. AS EVIDENCED BY LOOSENING OF THE WASHER UNDER THE NUT.
<br />f. TORQUE TESTS ACCEPTANCE: ANCHORS TESTED WITH A CALIBRATED TORQUE WRENCH MUST
<br />ATTAIN THE MANUFACTURER'S RECOMMENDED TORQUE WITHIN 1/2 TURN OF THE NUT.
<br />g. TEST EQUIPMENT IS TO BE CALIBRATED BY AN APPROVED TESTING LABORATORY IN
<br />ACCORDANCE WITH STANDARD RECOGNIZED PROCEDURES.
<br />h. FIELD TESTING SHALL BE DONE IN THE PRESENCE OF THE SPECIAL INSPECTOR OR INSPECTOR
<br />OF RECORD.
<br />i. TESTING SHOULD OCCUR 24 HOURS MINIMUM AFTER INSTALLATION OF THE SUBJECT ANCHORS.
<br />j. INSPECTOR OF RECORDS SHALL REQUEST PROOF TEST VALUES FROM SEOR FOR EACH TYPE
<br />OF POST-INSTALLED ANCHORS AT LEAST 48 HOURS PRIOR TO TESTING.
<br />7. INSTALLERS PLACING HORIZONTALLY OR UPWARDLY INCLINED ADHESIVE ANCHORS SHALL BE CERTIFIED BY
<br />ACI OR APPROVED EQUIVALENT.
<br />8.RE-USE OF SCREW ANCHORS OR HOLES IS NOT PERMITTED.
<br />POST-INSTALLED ANCHOR
<br />POWDER ACTUATED FASTENERS (PAF)
<br />EXISTING CONDITIONS
<br />1. ALLOWABLE POWDER-ACTUATED FASTENERS (PAF) SHALL BE EITHER ONE OF THE FOLLOWING UNO: HILTI X-U
<br />(ICC ESR-2269), SIMPSON POWER-DRIVEN FASTENERS (ICC ESR-2138), DEWALT CSI SPIRAL DRIVE PIN (ICC
<br />ESR-2024)
<br />2. INSTALL PER MANUFACTURER'S RECOMMENDED SPECIFICATIONS.
<br />3. PROVIDE 0.08" THICK x 1.1" SQUARE OR 1.425" ROUND WASHERS FOR ALL POWDER-ACTUATED FASTENERS.
<br />4. THE MINIMUM EMBEDMENT OF PAF INTO CONCRETE SHALL BE 1" UNO.
<br />5. THE EMBEDMENT OF PAF INTO STEEL SHALL BE THAT REQUIRED BY PAF MANUFACTURER ICC ESR REPORT.
<br />6. TESTING OF PAF IS NOT REQUIRED.
<br />7. MAINTAIN ALL APPLICABLE EDGE DISTANCE AT CURBS AND SLAB EDGES PER MANUFACTURER'S ICC ESR
<br />REPORT.
<br />1. DEMOLITION WORK SHALL BE CONDUCTED IN SUCH A MANNER AS TO NOT DAMAGE EXISTING ELEMENTS THAT
<br />ARE TO REMAIN IN THE FINISHED BUILDING.
<br />2. VERIFY EXISTING BUILDING DIMENSIONS AND ELEVATIONS. NOTIFY AOR/SEOR OF ANY DISCREPANCIES BEFORE
<br />PROCEEDING WITH WORK.
<br />3. PROVIDE MEASURES NECESSARY TO PROTECT THE EXISTING STRUCTURE DURING DEMOLITION WORK.
<br />PROTECTIVE MEASURES SHALL REMAIN IN PLACE UNTIL THE FINAL STRUCTURAL ELEMENTS ARE IN PLACE AND
<br />ABLE TO SAFELY CARRY ALL IMPOSED EXISTING BUILDING LOADS. SUCH MEASURES INCLUDE, BUT NOT LIMITED
<br />TO, BRACING AND SHORING.
<br />4. EXISTING ELEMENTS OF THE STRUCTURE THAT ARE TO REMAIN IN THE FINISHED BUILDING SHALL BE PROTECTED
<br />AS NECESSARY TO MINIMIZE DAMAGE DURING DEMOLITION WORK, ANY SUCH DAMAGE SHALL BE REPAIRED
<br />AND/OR REPLACED AT NO ADDED COST.
<br />5. ROUGHEN EXISTING CONCRETE SURFACES AGAINST WHICH FRESH CONCRETE IS TO BE PLACED TO A FULL
<br />AMPLITUDE OF 1/4 INCH.
<br />6. EXISTING CONCRETE ELEMENTS THAT ARE TO BE REMOVED BY CHIPPING SHALL BE STARTED WITH A 3/4 INCH
<br />DEEP SAW CUT. CORNERS SHALL BE DRILLED TO PREVENT OVER-CUTTING. EXPOSED SAW CUT LINES SHALL BE
<br />CLEAN, STRAIGHT AND SMOOTH.
<br />7. EXISTING REINFORCING STEEL TO REMAIN SHALL BE CLEANED TO BARE METAL.
<br />8. DEMOLISHED MATERIAL PLACED ON EXISTING FLOORS SHALL BE SPREAD OUT SUCH THAT IMPOSED LOADS DO
<br />NOT EXCEED THE DESIGN LIVE LOAD PER SQUARE FOOT. PROVIDE ADEQUATE SHORING WHERE OVERLOAD IS
<br />ANTICIPATED.
<br />DEMOLITION
<br />1. DESIGN, FABRICATION AND ERECTION OF COLD-FORMED STEEL FRAMING SHALL CONFORM TO THE CURRENT
<br />CBC ADOPTED EDITION OF THE SPECIFICATIONS AND STANDARD OF THE AMERICAN IRON AND STEEL INSTITUTE
<br />(AISI), AS CONTAINED IN THE "SPECIFICATION FOR THE DESIGN OF COLD-FORMED STEEL STRUCTURAL
<br />MEMBERS", INCLUDING ALL APPLICABLE AMENDMENTS.
<br />2. ALL COLD-FORMED STEEL FRAMING SHALL BE ERECTED PLUMB AND TRUE TO LINE. TEMPORARY BRACING
<br />SHALL BE INSTALLED AND LEFT IN PLACE UNTIL OTHER MEANS IS PROVIDED TO ADEQUATELY BRACE THE
<br />STRUCTURE. ALL COLD-FORMED STEEL FRAMING SHALL BE BRACED AS REQUIRED BY SECTION D3 OF THE AISI
<br />SPECIFICATION.
<br />3. COLD-FORMED STEEL GRADES (ASTM A1003):
<br />18 GA (43 MILS) OR THINNER.................................................................................................................GRADE 33 (Fy = 33 KSI)
<br />16 GA (54 MILS) AND THICKER...............................................................................................................GRADE 50 (Fy = 50 KSI)
<br />4. SUBMIT COLD-FORMED STEEL FRAMING SHOP DRAWINGS AND SPECIFICATIONS TO THE SEOR AND AOR FOR
<br />REVIEW AND APPROVAL PRIOR TO FABRICATION.
<br />5. COLD-FORMED STEEL STUDS AND TRACKS ARE TO BE ATTACHED WITH SHEET METAL SCREWS (SMS) WITH
<br />SIZES CALLED OUT ON THE DETAILS. PENETRATION OF SCREWS THROUGH JOINED MATERIAL SHALL NOT BE
<br />LESS THAN 3 EXPOSED THREADS. SCREWS SHALL BE DART SELF DRILLING SCREWS (ICC ESR-1408) OR ITW
<br />BUILDEX TEKS
<br />(ICC ESR-1976) AND SHALL BE INSTALLED AND TIGHTENED IN ACCORDANCE WITH SCREW MANUFACTURER'S
<br />RECOMMENDATIONS. SHEET METAL SCREWS SHALL COMPLY WITH ASTM C1513, SELF-DRILLING AND TAPPING
<br />TYPE, WITH PANCAKE FRAMER HEAD TYPE FOR #10 SMS AND HEX WASHER HEAD TYPE FOR #12 AND #14 (1/4"Ø)
<br />SMS UNLESS NOTED OTHERWISE.
<br />6. COLD-FORMED STUD MEMBERS SHALL BE UNPUNCHED WHERE USED FOR THE FOLLOWING: HEADERS AND
<br />SILLS OF OPENINGS WIDER THAN 3'-0", AND BUILT-UP BOX AND BACK-TO-BACK SECTIONS. PUNCH-OUTS SHALL
<br />BE LOCATED IN THE CENTER OF THE WEB WITH A MINIMUM SPACING OF 24"OC, HAVE A MAXIMUM WIDTH OF
<br />HALF THE MEMBER DEPTH OR 2 1/2", WHICHEVER IS LESS, AND A MAXIMUM LENGTH OF 4 1/2". THE MINIMUM
<br />DISTANCE BETWEEN THE END OF THE MEMBER AND THE NEAR EDGE OF THE PUNCH-OUT SHALL BE 12".
<br />7. WELDING OF LIGHT GAGE STEEL SHALL BE IN ACCORDANCE WITH AMERICAN WELDING SOCIETY (AWS) D1.3.
<br />COLD-FORMED STEEL FRAMING
<br />STRUCTURAL+CIVIL ENGINEERS (B&J HBK, INC.)
<br />3300 IRVINE AVE. SUITE 245
<br />NEWPORT BEACH, CALIFORNIA 92660
<br />T:(949)862-8500 WWW.BJSCE.COM
<br />JOB#:
<br />No. 6250
<br />FFOHSIB
<br />RYANW.
<br />REGISTEREDPROFESSIONALENGINEER
<br />STRUCTURALSTATEOFCALIFORNIA
<br />DATE:
<br />FOR BRANDOW & JOHNSTON
<br />ISSUES AND REVISIONS
<br />JOB NUMBER
<br />SCALE
<br />PROJECT
<br />TEAM
<br />All specifications, drawings, concepts, designs, arrangements, intellectual and written material represented herein constitute
<br />unique and unpublished work of H. Hendy Associates and may not be copied, used by or disclosed to others without written
<br />consent of H. Hendy Associates.
<br /> 2023 H.HendyAssociatesc
<br />DATE
<br />240254
<br />12" = 1'-0"
<br />04463.0000.24
<br />3080 S HARBOR BLVD
<br />SANTA ANA, CA 92704
<br />GENERAL NOTES
<br />S1.0.1
<br />MCGUFF
<br />03/11/25
<br />SHEET LIST - TI
<br />Sheet Number Sheet Name
<br />S1.0.1 GENERAL NOTES
<br />S1.0.2 GENERAL NOTES
<br />S1.0.3 GENERAL NOTES
<br />S1.1.1 TYPICAL CONCRETE DETAILS
<br />S1.1.2 DETAILS
<br />S1.1.3 DETAILS
<br />S1.1.4 METAL STUD DETAILS
<br />S1.1.5 METAL STUD DETAILS
<br />S1.1.6 DETAILS
<br />S1.2.1 FIRST FLOOR PLAN
<br />S1.2.2 ROOF FRAMING PLAN
<br />NO. DESCRIPTION DATE
<br />PLAN CHECK SUBMITTAL 3/17/25
<br />3/17/2025
|