Laserfiche WebLink
(a)WHERE APPLICABLE, SEE SECTION 1705A.13 <br />(b)SPECIFIC REQUIREMENTS FOR SPECIAL INSPECTION SHALL BE INCLUDED IN THE RESEARCH REPORT FOR THE <br />ANCHOR ISSUED BY AN APPROVED SOURCE IN ACCORDANCE WITH 17.8.2 IN ACI 318, OR OTHER QUALIFICATION <br />PROCEDURES. WHERE SPECIFIC REQUIREMENTS ARE NOT PROVIDED, SPECIAL INSPECTION REQUIREMENTS <br />SHALL BE SPECIFIED BY THE REGISTERED DESIGN PROFESSIONAL AND SHALL BE APPROVED BY THE BUILDING <br />OFFICIAL PRIOR TO THE COMMENCEMENT OF THE WORK. <br />(c)INSTALLATION OF ALL ADHESIVE ANCHORS IN HORIZONTAL AND UPWARDLY INCLINED POSITIONS SHALL BE <br />PERFORMED BY AN ACI/CRSI CERTIFIED ADHESIVE ANCHOR INSTALLER, EXCEPT WHERE THE DESIGN TENSION ON <br />THE ANCHORS IS LESS THAN 100 LBS AND THOSE ANCHORS ARE CLEARLY NOTED ON THE APPROVED <br />CONSTRUCTION DOCUMENTS OR WHERE THE ANCHORS ARE SHEAR DOWELS ACROSS COLD JOINTS IN SLABS ON <br />GRADE WHERE THE SLAB IS NOT PART OF THE LATERAL FORCE-RESISTING SYSTEM. <br />TABLE 1705.3 OF CBC <br />REQUIRED SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION <br />TYPE CONTINUOUS SPECIAL <br />INSPECTION <br />PERIODIC SPECIAL <br />INSPECTION <br />REFERENCED <br />STANDARD (a) <br />1. INSPECT AND TEST REINFORCEMENT, INCLUDING <br />PRESTRESSING TENDONS, AND VERIFY PLACEMENT. <br />X <br />ACI 318: CH. 20, 25.2, <br />25.3, 25.5.1, <br />26.6.1-26.6.3, 26.13.1, <br />26.13.3.2, 26.13.3.3 <br />2. REINFORCING BAR WELDING: <br />AWS D1.4 <br />ACI 318: 18.2.8, 25.5.7, <br />26.6.4,26.13.1.4, <br />26.13.3.2, 26.13.3.3 <br />a. VERIFY WELDABILITY OF REINFORCING BARS OTHER THAN <br />ASTM A706.─X <br />b. INSPECT SINGLE PASS FILLET WELDS, MAXIMUM 5/16”; NOT <br />DEFINED IN 2.d OR 2.e X <br />c. INSPECT ALL OTHER WELDS.X <br />3. INSPECT ANCHORS CAST IN CONCRETE.─X ACI 318: 17.8.2, 26.7.2, <br />26.8.2, 26.13.1, 26.13.3.3 <br />4. INSPECT AND TEST ANCHORS POST-INSTALLED IN HARDENED <br />CONCRETE MEMBERS.(b) <br />ACI 318: 17.8.2.4, 26.7.2, <br />26.13.1, 26.13.3.2 <br />a. ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR <br />UPWARDLY INCLINED ORIENTATIONS TO RESIST SUSTAINED <br />TENSION LOADS. <br />X <br />b. MECHANICAL ANCHORS AND ADHESIVE ANCHORS NOT <br />DEFINED IN 4.a.X <br />5. VERIFY USE OF REQUIRED DESIGN MIX.ACI 318: CH.19, 26.4, <br />26.13.3.2 <br />6. PRIOR TO AND DURING CONCRETE PLACEMENT, FABRICATE <br />SPECIMENS FOR STRENGTH TESTS, PERFORM SLUMP AND AIR <br />CONTENT TESTS, AND DETERMINE THE TEMPERATURE OF THE <br />CONCRETE. <br />X ─ <br />ASTM C31 <br />ASTM C172 <br />ACI 318: 26.4, 26.5, 26.12 <br />7. INSPECT CONCRETE AND SHOTCRETE FOR PROPER <br />APPLICATION TECHNIQUES.X ─ACI 318: 26.5, <br />26.13, ACI 506: 3.4 <br />8. VERIFY MAINTENANCE OF SPECIFIC CURING TEMPERATURE <br />AND TECHNIQUES.─X ACI 318: 26.5.3–26.5.5, <br />26.13.3.3 <br />9. INSPECT PRESTRESSED CONCRETE FOR: <br />ACI 318: 26.10.2, <br />26.13.1, 26.13.3.2 <br />a. APPLICATION OF PRESTRESSING FORCES; AND X ─ <br />b. GROUTING OF BONDED PRESTRESSING TENDONS.X ─ <br />10. INSPECT ERECTION OF PRECAST CONCRETE MEMBERS.─X ACI 318: 26.9, 26.13.1, <br />26.13.3.3 <br />11. FOR PRECAST CONCRETE DIAPHRAGM CONNECTIONS OR <br />REINFORCEMENT AT JOINTS CLASSIFIED AS MODERATE OR HIGH <br />DEFORMABILITY ELEMENTS (MDE OR HDE) IN STRUCTURES <br />ASSIGNED TO SEISMIC DESIGN CATEGORY D, E OR F, INSPECT <br />SUCH CONNECTIONS AND REINFORCEMENT IN THE FIELD FOR: <br />─X ACI 318: 26.13.1.3 <br />12. INSPECT INSTALLATION TOLERANCES OF PRECAST CONCRETE <br />DIAPHRAGM CONNECTIONS FOR COMPLIANCE WITH ACI 550.5 ─X ACI 318: 26.13.1.3 <br />─ <br />─ <br />─ <br />─ <br />─X <br />a. REINFORCEMENT IN SPECIAL MOMENT FRAMES, <br />BOUNDARY ELEMENTS OF SPECIAL STRUCTURAL WALLS <br />AND COUPLING BEAMS. <br />b. ALL OTHER REINFORCEMENT. <br />─ <br />d. REINFORCING STEEL RESISTING FLEXURAL AND AXIAL FORCES <br />IN INTERMEDIATE AND SPECIAL MOMENT FRAMES, AND <br />BOUNDARY ELEMENTS AND COUPLING BEAMS OF SPECIAL <br />STRUCTURAL WALLS OF CONCRETE AND SHEAR <br />REINFORCEMENT. <br />X ─ <br />e. SHEAR REINFORCEMENT.X ─ <br />ACI 318: 17.8.2, 26.7.2, <br />26.13.1, 26.1 3.3.2 <br />─X <br />a. INSTALLATION OF THE EMBEDDED PARTS X ─ <br />b. COMPLETION OF THE CONTINUITY OF REINFORCEMENT <br />ACROSS JOINTS X ─ <br />c. COMPLETION OF CONNECTIONS IN THE FIELD X ─ <br />ACI 550.5 <br />13. VERIFY IN-SITU CONCRETE STRENGTH, PRIOR TO STRESSING OF <br />TENDONS IN POST-TENSIONED CONCRETE AND PRIOR TO <br />REMOVAL OF SHORES AND FORMS FROM BEAMS AND <br />STRUCTURAL <br />─X ACI 318: 26.10.2, <br />26.11.2, 26.13.3.3 <br />14. INSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS <br />OF THE CONCRETE MEMBER BEING FORMED ─X ACI 318: 26.11.1.2(b), <br />26.13.3.3 <br />SPECIAL INSPECTION AND TESTING <br />1. ALL WORK SHALL BE IN CONFORMANCE WITH ANY AND ALL TESTING, INSPECTION, QUALIFICATION, AND QUALITY <br />ASSURANCE PROVISIONS AS REQUIRED BY THE CALIFORNIA BUILDING CODE AND ANY APPLICABLE STANDARDS <br />(LATEST ADOPTED EDITION OF CURRENT CBC). <br />2. AN APPROVED TESTING AND INSPECTION AGENCY, RETAINED BY OWNER AND SATISFACTORY TO AOR/SEOR AND <br />GOVERNING CODE AUTHORITY, SHALL PERFORM SPECIAL INSPECTIONS AND TESTS REQUIRED BY THIS CONTRACT <br />AND IN ACCORDANCE WITH APPLICABLE CODE'S REQUIREMENTS. LABORATORIES CONDUCTING ANY SPECIAL <br />INSPECTION, TESTING, OR OBTAINING, HANDLING, PREPARING, PROTECTING, TRANSPORTING OR STORING OF <br />SAMPLES MUST BE ACCEPTED BY THE DSA LABORATORY EVALUATION AND ACCEPTANCE (LEA) PROGRAM. THESE <br />SPECIAL INSPECTIONS AND TESTS ARE IN ADDITION TO THE INSPECTIONS REQUIRED BY CBC SECTION 110. AN <br />APPROVED TESTING AND INSPECTION AGENCY IS A RECOGNIZED AGENCY REGULARLY ENGAGED IN CONDUCTING <br />TESTS AND/OR FURNISHING INSPECTION SERVICES, WHERE SUCH AGENCY HAS BEEN APPROVED BY THE <br />GOVERNING CODE AUTHORITY. <br />3. THE APPROVED TESTING AND INSPECTION AGENCY SHALL KEEP RECORDS OF ALL SPECIAL INSPECTIONS AND <br />TESTS AND SHALL FURNISH REPORTS OF SPECIAL INSPECTIONS AND TESTS TO THE GOVERNING CODE AUTHORITY <br />AND THE AOR/SEOR. REPORTS SHALL INDICATE WHETHER THE WORK INSPECTED OR TESTED WAS OR WAS NOT <br />COMPLETED IN CONFORMANCE TO APPROVED CONSTRUCTION DOCUMENTS. DISCREPANCIES SHALL BE BROUGHT <br />TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION. IF NOT CORRECTED, THE DISCREPANCIES <br />SHALL BE BROUGHT TO THE ATTENTION OF THE GOVERNING CODE AUTHORITY AND THE ARCHITECT (STRUCTURAL <br />ENGINEER) PRIOR TO THE COMPLETION OF THAT PHASE OF WORK. A FINAL REPORT DOCUMENTING REQUIRED <br />SPECIAL INSPECTIONS AND TESTS, AND CORRECTION OF DISCREPANCIES, SHALL BE SUBMITTED UPON <br />COMPLETION OF THAT PHASE OF WORK. <br />4. APPROVED TESTING AND INSPECTION AGENCY SHALL PERFORM SPECIAL INSPECTIONS AND TESTINGS IN <br />ACCORDANCE WITH CBC SECTION 1705 AND WITH THIS SECTION FOR THE FOLLOWING WORK. SEE PROJECT <br />SPECIFICATIONS FOR ADDITIONAL TESTING AND INSPECTION REQUIREMENTS. <br />A. STEEL CONSTRUCTION: PER TABLE 1705.2.1 OF CBC <br />B. CONCRETE CONSTRUCTION: PER ATTACHED TABLE 1705.3 OF CBC <br />5. STRUCTURAL STEEL: <br />(i)ALL WELDING SHALL BE IN ACCORDANCE WITH THE AMERICAN WELDING SOCIETY (AWS) STRUCTURAL <br />WELDING CODE FOR STEEL AWS D1.1. <br />(ii)WELDING PROCEDURE SPECIFICATIONS (WPS) SHALL BE SUB MITTED TO THE ENGINEER FOR APPROVAL, <br />PRIOR TO THE BEGINNING OF WELDING OPERATIONS. THE WPS SHALL INCLUDE THE WELDING PARAMETERS <br />RECOMMENDED BY THE ELECTRODE MANUFACTURER. <br />SEE AWS D1.1 APPENDIX E, FORM E-1. JOINT DETAILS TO SUIT EXISTING CONDITIONS. THE WELDING <br />ELECTRODE MANUFACTURER'S SPECIFICATIONS SHALL BE ATTACHED TO THE WPS. ALL WELDERS AND <br />INSPECTORS SHALL BE INFORMED OF THE WPS AND SHALL RETAIN A COPY. <br />(iii)SEE AWS FOR PREQUALIFIED SMAW WPS'S. <br />(iv)SEE AWS FOR PREQUALIFIED FCAW WPS'S. <br />(v)WELDING TO BE DONE BY WELDERS CERTIFIED BY AWS. <br />(vi)ONLY SHIELDED METAL ARC WELDING (SMAW) WITH LOW HYDROGEN ELECTRODES OR FLUX CORE ARC <br />WELDING (FCAW), EITHER GAS SHIELDED OF SELF SHIELDED, SHALL BE USED. FOR SMAW, THE TYPICAL <br />REQUIREMENTS SHALL BE ACCORDING TO NOTE #3 ABOVE. WELDING PROCEDURES SHALL MEET THE <br />REQUIREMENTS OF AWS D1.1 4.6.2, OR SHALL BE QUALIFIED BY TEST. FOR FCAW, THE TYPICAL REQUIREMENTS <br />SHALL BE ACCORDING TO NOTE <br />#5 ABOVE. THE WELDING PROCEDURE SHALL MEET THE REQUIREMENTS OF AWS D1.1. <br />(vii)INDIVIDUAL WELDS SHALL BE CARRIED CONTINUOUSLY TO COMPLETION BEFORE THE JOINT IS ALLOWED TO <br />COOL BELOW THE MINIMUM SPECIFIED PREHEAT AND INTERPASS TEMPERATURE. <br />(viii) AT ALL COMPLETE PENETRATION WELDS, WELD BEADS SHALL BE PEENED AFTER EACH PASS, WITH THE <br />EXCEPTION OF THE ROOT PASS AND THE SURFACES PASSES, AS FOLLOWS: <br />TURN SLAG GUN 90 DEG. AND MAKE A MINIMUM OF 4 PASSES WITH DULL CHISEL. <br />(ix)PREHEATING IS REQUIRED ON ALL TACK WELDS NOT INCORPORATED INTO FINAL WELDS. SEE AWS D1.1. <br />(x)FOR BEAM FLANGE REINFORCEMENT PLATES, THE ROLLING DIRECTION OF GRAIN SHALL BE INDICATED ON <br />THE PLATE AND INSTALLED SO THAT THE GRAIN DIRECTION IS PARALLEL TO THE LONGITUDINAL AXIS OF THE <br />MEMBER. <br />(xi)FULL TIME VISUAL INSPECTION BY AN AWS QC-1 QUALIFIED INSPECTOR IS REQUIRED FOR ALL WELDING. <br />(xii)100% ULTRASONIC WELD TESTING BY THE INSPECTOR IS RE QUIRED FOR ALL COMPLETE-JOINT-PENETRATION <br />WELDS. <br />(xiii) AMPERAGE, VOLTAGE, POLARITY AND ELECTRODE STICK OUT SHALL BE VERIFIED TO BE IN COMPLIANCE <br />WITH THE ELECTRODE MANUFACTURER'S RECOMMENDATIONS. <br />(xiv) REMOVE BACKUP BARS AND WELD TABS AT ALL FLANGE COMPLETE-JOINT-PENETRATION (CJP) WELDS AT <br />DUCTILE MOMENT FRAME CONNECTIONS. TYPICAL UNLESS NOTED OTHERWISE. <br />6.COLD-FORMED STEEL FRAMING: <br />PERIODIC SPECIAL INSPECTION IS REQUIRED DURING WELDING OPERATION OF ELEMENTS OF THE SLRS. <br />PERIODIC INSPECTION IS REQUIRED FOR SCREW ATTACHMENT, BOLTING, ANCHORING AND OTHER FASTENING OF <br />COMPONENTS WITHIN THE SFRS, INCLUDING STRUTS, BRACES, AND HOLD-DOWNS. <br />7.MECHANICAL AND ELECTRICAL COMPONENTS: <br />SPECIAL INSPECTION FOR MECHANICAL AND ELECTRICAL EQUIPMENT AS FOLLOWS: <br />(i) PERIODIC SPECIAL INSPECTION IN REQUIRED DURING THE ANCHORAGE OF ELECTRICAL EQUIPMENT FOR <br />EMERGENCY OR STANDBY POWER SYSTEMS. <br />(ii)PERIODIC SPECIAL INSPECTION IS REQUIRED DURING THE INSTALLATION OF VIBRATION ISOLATION SYSTEM <br />WHERE THE CONSTRUCTION DOCUMENTS REQUIRED A NOMINAL CLEARANCE OF 0.25 INCH OR LESS <br />BETWEEN THE EQUIPMENT AND THE SUPPORT FRAME AND RESTRAINT. <br />MATERIALS AND SYMBOLS <br />LFRS STEEL LATERAL FORCE <br />RESISTING SYSTEM, SEE SHEET <br />S001 AND SPECIFICATIONS <br />SHEET REFERENCE <br />SECTION OR DETAIL <br />FULL HEIGHT SECTION <br />WALL OR FRAME ELEVATION <br />FINISH ELEVATION <br />SHEET REFERENCE <br />NUMBER REFERENCE <br />SHEET REFERENCE <br />NUMBER REFERENCE <br />REFER TO PLANS <br />FOR DATUM <br />NUMBER REFERENCE <br />MATERIALS <br />CONCRETE <br />CONCRETE BLOCK <br />EARTH <br />SYMBOLS <br />STEEL <br />STRUCTURAL+CIVIL ENGINEERS (B&J HBK, INC.) <br />3300 IRVINE AVE. SUITE 245 <br />NEWPORT BEACH, CALIFORNIA 92660 <br />T:(949)862-8500 WWW.BJSCE.COM <br />JOB#: <br />No. 6250 <br />FFOHSIB <br />RYANW. <br />REGISTEREDPROFESSIONALENGINEER <br />STRUCTURALSTATEOFCALIFORNIA <br />DATE: <br />FOR BRANDOW & JOHNSTON <br />ISSUES AND REVISIONS <br />JOB NUMBER <br />SCALE <br />PROJECT <br />TEAM <br />All specifications, drawings, concepts, designs, arrangements, intellectual and written material represented herein constitute <br />unique and unpublished work of H. Hendy Associates and may not be copied, used by or disclosed to others without written <br />consent of H. Hendy Associates. <br /> 2023 H.HendyAssociatesc <br />DATE <br />240254 <br />12" = 1'-0" <br />04463.0000.24 <br />3080 S HARBOR BLVD <br />SANTA ANA, CA 92704 <br />GENERAL NOTES <br />S1.0.3 <br />MCGUFF <br />03/11/25 <br />ABBREVIATIONS <br />A <br />AB ANCHOR BOLT <br />ADDL ADDITIONAL <br />ADJ ADJACENT <br />AFF ABOVE FINISH FLOOR <br />ALT ALTERNATE <br />ARCH ARCHITECT(URAL) <br />B <br />BLDG BUILDING <br />BLKG BLOCKING <br />BM BEAM <br />BN BOUNDARY NAILING <br />BO BOTTOM OF <br />BOTT, (B) BOTTOM <br />BTWN BETWEEN <br />C <br />C CAMBER <br />CIP CAST IN PLACE <br />CJ CONTROL/CONSTRUCTION JOINT <br />CJP, CP COMPLETE JOINT PENETRATION <br />CL CENTERLINE <br />CLG CEILING <br />CLR CLEAR <br />CMU CONCRETE MASONRY UNIT <br />COL COLUMN <br />CONC CONCRETE <br />CONN CONNECTION <br />CONT CONTINUOUS <br />CTR(D) CENTER(ED) <br />CY CUBIC YARDS <br />D <br />DB BAR DIAMETER <br />DBL DOUBLE <br />DC DEMAND CRITICAL <br />DEMO DEMOLISH, DEMOLITION <br />DIA, DIAM DIAMETER <br />DIAG DIAGONAL <br />DIM DIMENSION <br />DO DITTO <br />DWG DRAWING <br />E <br />EA EACH <br />EF EACH FACE <br />EJ EXPANSION JOINT <br />ELEC ELECTRICAL <br />ELEV ELEVATION, ELEVATOR <br />EMBED EMBEDMENT <br />EN EDGE NAIL <br />EO EDGE OF <br />EQ EQUAL <br />EQUIP EQUIPMENT <br />ES EACH SIDE <br />EW EACH WAY <br />EXIST, (E) EXISTING <br />EXP EXPANSION <br />EXT EXTERIOR <br />F <br />FLR FLOOR <br />FN FIELD NAILING <br />FND FOUNDATION <br />FO FACE OF <br />FS FAR SIDE <br />FT FOOT, FEET <br />FTG FOOTING <br />G <br />GA GAUGE <br />GALV GALVANIZED <br />GC GENERAL CONTRACTOR <br />GLBM, GB GLUED-LAMINATED BEAM <br />GR GRADE <br />GRBM GRADE BEAM <br />H <br />HK HOOK <br />HORIZ HORIZONTAL <br />HS HIGH STRENGTH <br />HSS HOLLOW STRUCTURAL SECTION <br />HT HEIGHT <br />I <br />ID INSIDE DIAMETER <br />IN INCH <br />INT INTERIOR <br />ABBREVIATIONS <br />J <br />JT JOINT <br />K <br />K, KIP(S) KILOPOUND <br />KLF KIPS PER LINEAR FOOT <br />KSF KIPS PER SQUARE FOOT <br />KSI KIPS PER SQUARE INCH <br />L <br />L ANGLE <br />LB, LBS POUND(S) <br />LF LINEAR FEET <br />LFRS LATERAL FORCE RESISTING <br />SYSTEM <br />LLH LONG LEG HORIZONTAL <br />LLV LONG LEG VERTICAL <br />M <br />MAX MAXIMUM <br />MB MACHINE BOLT <br />MECH MECHANICAL <br />MFR MANUFACTURE <br />MIN MINIMUM <br />MW MEDIUM WEIGHT <br />N <br />(N) NEW <br />NDT NON-DESTRUCTIVE TESTING <br />NS NEAR SIDE <br />NTS NOT TO SCALE <br />NW(C) NORMAL WEIGHT (CONCRETE) <br />O <br />OC ON CENTER <br />OD OUTSIDE DIAMETER <br />OH OPPOSITE HAND <br />OPP OPPOSITE <br />P <br />PAF, PDF POWDER DRIVEN/POWER <br />ACTUATED FASTENER <br />PJP, PP PARTIAL JOINT PENETRATION <br />PL PLATE <br />PLF POUND PER LINEAR FOOT <br />PSF POUND PER SQUARE FOOT <br />PSI POUND PER SQUARE INCH <br />PT PRESSURE TREATED WOOD, <br />POST/PRE-TENSIONED <br />R <br />R RADIUS <br />REF REFERENCE <br />REINF REINFORCING <br />REQD REQUIRED <br />S <br />(S)EOR (STRUCTURAL) ENGINEER OF <br />RECORD <br />SC SLIP CRITICAL <br />SCHED SCHEDULE <br />SDS, SMS SELF-DRILLING / SHEET METAL <br />SCREW <br />SFRS SEISMIC FORCE RESISTING <br />SYSTEM <br />SIM SIMILAR <br />SN SILL NAILING <br />SOG SLAB ON GRADE <br />SPECS SPECIFICATIONS <br />SQ SQUARE <br />SS STAINLESS STEEL <br />STD STANDARD <br />STIFF STIFFENER <br />STL STEEL <br />STRUCT STRUCTURAL <br />SYM SYMMETRICAL <br />T <br />T&B TOP & BOTTOM <br />TO TOP OF <br />TYP TYPICAL <br />U <br />UNO UNLESS NOTED OTHERWISE <br />V <br />VERT VERTICAL <br />VIF VERIFY IN FIELD <br />W <br />W/ WITH <br />W/O WITHOUT <br />WF WIDE FLANGE <br />WP WORK POINT <br />WT WEIGHT <br />WWF WELDED WIRE FABRIC <br />NO. DESCRIPTION DATE <br />PLAN CHECK SUBMITTAL 3/17/25 <br />3/17/2025