Laserfiche WebLink
<br /> <br /> <br />Mount Desktop – Post Modification Inspection (PMI) Report Requirements <br /> <br />Documents & Photos Required from Contractor – Passing Mount Analysis <br />Passing Mount Analysis requires a PMI due to a modification in loading. <br />Electronic pdf version of this can be downloaded at https://pmi.vzwsmart.com. <br />For additional questions and support, please reach out to pmisupport@colliersengineering.com <br />__________________________________________________________________________________________________________________________________________________________________________________________________________ <br /> <br />MDG #: 5000377172 SMART Project #: 10262525 Fuze Project ID: 17356224 <br /> <br />Purpose – to provide SMART Tool structural vendor the proper documentation in order to complete <br />the required Mount Desktop review of the Post Modification Inspection Report. <br />• Contractor is responsible for making certain the photos provided as noted below provide <br />confirmation that the installation was completed in accordance with this Passing Mount <br />Analysis. <br />• Contractor shall relay any data that can impact the performance of the mount, this includes <br />safety issues. <br /> <br />Base Requirements: <br /> <br />• If installation will cause damage to the structure, the climbing facility, or safety climb if present <br />or any installed system, SMART Tool vendor to be notified prior to install. Any special photos <br />outside of the standard requirements will be indicated on the drawings. <br />• Provide “as built mount drawings” showing contractor’s name, contact information, preparer’s <br />signature, and date. Any deviations from the drawings (Proposed modification) shall be shown. <br />NOTE: If loading is different than what is conveyed in the passing mount analysis (MA) contact <br />the SMART Tool vendor immediately. <br />• Each photo should be time and date stamped <br />• Photos should be high resolution. <br />• Contractor shall ensure that the safety climb wire rope is supported and not adversely <br />impacted by the install of the modification components. This may involve the install of wire <br />rope guides, or other items to protect the wire rope. If there is conflict, contact the SMART Tool <br />engineer for recommendations. <br />• The PMI can be accessed at the following portal: https://pmi.vzwsmart.com <br /> <br />Photo Requirements: <br /> <br />• Photos taken at ground level <br />o Photo of Gate Signs showing the tower owner, site name, and number. <br />o Overall tower structure after installation. <br />o Photos of the mount after installation; if the mounts are at different rad elevations, <br />pictures must be provided for all elevations that equipment was installed. <br />• Photos taken at Mount Elevation <br />o Photos showing the safety climb wire rope above and below the mount prior to <br />installation. <br />o Photos showing the climbing facility and safety climb if present. <br />o Photos showing each individual sector after installation. Each entire sector shall be in <br />one photo to show the interconnection of members.