My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3011 3%4 W Warner Ave Unit #WCC01 - Plan
PBA
>
Building
>
ProjectDox
>
W
>
Warner Ave
>
3011 3/4 W Warner Ave Unit# WCC01
>
3011 3%4 W Warner Ave Unit #WCC01 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:02:35 AM
Creation date
2/13/2026 5:00:37 AM
Metadata
Fields
Template:
Plan
Permit Number
101122306
Full Address
3011 3/4 W Warner Ave Unit# WCC01
Street Number
3011
Partial
3/4
Street Direction
W
Street Name
Warner
Street Suffix
Ave
Unit Number
WCC01
Document Relationships
101122306 - Permit
(Permit - Plan)
Path:
\Building\Permits\W\Warner Ave\3011 3/4 W Warner Ave Unit# WCC01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> These photos shall also certify that the placement and geometry of the <br />equipment on the mount is as depicted in the antenna placement diagram in this <br />form. <br />o Photos that show the model number of each antenna and piece of equipment installed <br />per sector. <br /> <br />Antenna & equipment placement and Geometry Confirmation: <br /> <br />• The contractor shall certify that the antenna & equipment placement and geometry is in <br />accordance with the sketch and table as included in the mount analysis and noted below. <br /> <br />☐ The contractor certifies that the photos support and the equipment on the mount is as depicted on <br />the sketch and table included in this form and with the mount analysis provided. <br /> <br />OR <br /> <br />☐ The contractor notes that the equipment on the mount is not in accordance with the sketch and has <br />noted the differences below and provided photo documentation of any alterations. <br /> <br /> <br />Special Instructions / Validation as required from the MA or any other information the contractor <br />deems necessary to share that was identified: <br /> <br />Issue: <br />Contractor shall shift mount pipes horizontally in position 1 on all sectors such that it is 24” from position 2 pipe. <br />Reconnect shifted pipes to mount horizontals using existing connection crossover plates, etc. with new bolting <br />hardware. Do not reuse existing bolts. <br /> <br />Contractor shall install a new 108” long PIPE 2.5 SCH40 mount pipe position 1 (in all sectors). Install 24” from relocated <br />position 1 pipe. Top of pipe shall be 36” above top face horizontal (match relocated position 1 pipe location on mount). <br />Attach using VZWSMART MSK1 crossover plates. Refer to placement diagrams. <br /> <br />Response: <br /> <br /> <br /> <br /> <br />Special Instruction Confirmation: <br /> <br />☐ The contractor has read and acknowledges the above special instructions. <br /> <br />☐ All hardware listed in the Special Instructions above (if applicable) has been properly <br />installed, and the existing hardware was inspected. <br /> <br />☐ The material utilized was as specified in the SMART Tool engineering vendor Special Instructions <br />above (if applicable) and included in the material certification folder is a packing list or invoice for these <br />materials. <br />
The URL can be used to link to this page
Your browser does not support the video tag.